blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3201977

EP3201977 - CALCIUM-BASED SECONDARY CELL AND BATTERY COMPRISING THE SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.01.2023
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  18.02.2022
FormerGrant of patent is intended
Status updated on  09.01.2022
FormerExamination is in progress
Status updated on  21.12.2018
FormerRequest for examination was made
Status updated on  07.07.2017
FormerThe international publication has been made
Status updated on  04.03.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
Toyota Motor Europe
Avenue du Bourget 60
1140 Brussels / BE
For all designated states
Consejo Superior De Investigaciones Científicas
C/ Serrano 117
28006 Madrid / ES
[2022/12]
Former [2017/32]For all designated states
Toyota Motor Europe
Avenue du Bourget 60
1140 Brussels / BE
For all designated states
Consejo Superior De Investigaciones Científicas
C/ Serrano 117
28006 Madrid / ES
Inventor(s)01 / BARDE, Fanny
Horststraat 12
B-3220 Holsbeek / BE
02 / PALACIN, Rosa
Av. JosepTarradellas 235
3r 2a
L'Hospitalet de Llobregat
E-08901 Barcelona / ES
03 / PONROUCH, Alexandre
Calle Nonell 3 2 4
Cerdanyola del Valles
E-08290 Barcelona / ES
 [2017/32]
Representative(s)Cabinet Beau de Loménie
158, rue de l'Université
75340 Paris Cedex 07 / FR
[2022/12]
Former [2017/32]Hart-Davis, Jason, et al
Cabinet Beau de Loménie
158, rue de l'Université
75340 Paris Cedex 07 / FR
Application number, filing date14827767.622.12.2014
[2017/32]
WO2014EP79050
Priority number, dateES2014000077102.10.2014         Original published format: ES 201400771
[2017/32]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016050331
Date:07.04.2016
Language:EN
[2016/14]
Type: A1 Application with search report 
No.:EP3201977
Date:09.08.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 07.04.2016 takes the place of the publication of the European patent application.
[2017/32]
Type: B1 Patent specification 
No.:EP3201977
Date:23.03.2022
Language:EN
[2022/12]
Search report(s)International search report - published on:EP07.04.2016
ClassificationIPC:H01M4/134, H01M4/38, H01M10/054, H01M10/0568, H01M10/0569, H01M10/613, H01M10/615, H01M10/6563, H01M10/6571
[2017/32]
CPC:
H01M10/054 (EP,US); H01M10/0568 (EP,US); H01M10/0569 (EP,US);
H01M10/613 (EP,US); H01M10/615 (EP,US); H01M4/134 (EP,US);
H01M4/38 (EP,US); H01M4/381 (EP,US); H01M10/6563 (EP,US);
H01M10/6571 (EP,US); H01M2300/0037 (EP,US); H01M2300/004 (EP,US);
H01M4/386 (EP,US); H01M4/387 (EP,US); Y02E60/10 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/32]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:AUF CALCIUM BASIERTE SEKUNDÄRZELLE UND BATTERIE DAMIT[2017/32]
English:CALCIUM-BASED SECONDARY CELL AND BATTERY COMPRISING THE SAME[2017/32]
French:PILE RECHARGEABLE À BASE DE CALCIUM ET BATTERIE LA COMPRENANT[2017/32]
Entry into regional phase03.03.2017National basic fee paid 
03.03.2017Designation fee(s) paid 
03.03.2017Examination fee paid 
Examination procedure03.03.2017Amendment by applicant (claims and/or description)
03.03.2017Examination requested  [2017/32]
03.03.2017Date on which the examining division has become responsible
03.01.2019Despatch of a communication from the examining division (Time limit: M04)
07.05.2019Reply to a communication from the examining division
18.02.2021Despatch of a communication from the examining division (Time limit: M06)
28.06.2021Reply to a communication from the examining division
10.01.2022Communication of intention to grant the patent
11.02.2022Fee for grant paid
11.02.2022Fee for publishing/printing paid
11.02.2022Receipt of the translation of the claim(s)
Opposition(s)02.01.2023No opposition filed within time limit [2023/09]
Fees paidRenewal fee
03.03.2017Renewal fee patent year 03
22.12.2017Renewal fee patent year 04
21.12.2018Renewal fee patent year 05
23.12.2019Renewal fee patent year 06
22.12.2020Renewal fee patent year 07
20.12.2021Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.12.2014
AL23.03.2022
AT23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
MK23.03.2022
MT23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
IE22.12.2022
LU22.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
[2024/41]
Former [2024/29]HU22.12.2014
AL23.03.2022
AT23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
MK23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
IE22.12.2022
LU22.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2024/27]HU22.12.2014
AL23.03.2022
AT23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
MK23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
IE22.12.2022
LU22.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2024/21]HU22.12.2014
AL23.03.2022
AT23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
IE22.12.2022
LU22.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2024/18]HU22.12.2014
AL23.03.2022
AT23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
IE22.12.2022
LU22.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/49]AL23.03.2022
AT23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
IE22.12.2022
LU22.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/48]AL23.03.2022
AT23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
IE22.12.2022
LU22.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/47]AL23.03.2022
AT23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
LU22.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/38]AL23.03.2022
AT23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
LU22.12.2022
Former [2023/35]AL23.03.2022
AT23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/25]AL23.03.2022
AT23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/07]AL23.03.2022
AT23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/01]AL23.03.2022
AT23.03.2022
CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2022/51]AT23.03.2022
CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2022/50]AT23.03.2022
CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/49]AT23.03.2022
CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/48]AT23.03.2022
CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/47]AT23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/44]FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/39]FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/36]HR23.03.2022
LT23.03.2022
LV23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/35]HR23.03.2022
LT23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
Former [2022/33]LT23.03.2022
NO23.06.2022
Cited inInternational search[YA]US2013319870  (CHEN GUORONG [US], et al) [Y] 1-10,12-16 * figure 2; table 1 * * paragraphs [0001] , [0029] - [0030] - [0045] * * paragraph [0120] - paragraph [0123] * * paragraph [0158] - paragraph [0159] * * paragraph [0166] - paragraph [0167] * [A] 11;
 [Y]US2003059684  (TAKAMI NORIO [JP], et al) [Y] 1-16 * figure 1 * * paragraphs [0019] - [0020] - [0030] , [0034] * * paragraphs [0053] - [0059] - [0072] *;
 [YA]JP2013020782  (TOYOTA IND CORP) [Y] 1,3-16 * paragraphs [0025] - [0026] - [0039] * * paragraph [0041] - paragraph [0046] * * paragraph [0055] - paragraph [0059] * * paragraph [0061] - paragraph [0064] * [A] 2;
 [YA]  - ALEXANDRE PONROUCH ET AL, "In search of an optimized electrolyte for Na-ion batteries", ENERGY & ENVIRONMENTAL SCIENCE, (20120613), vol. 5, no. 9, doi:10.1039/c2ee22258b, ISSN 1754-5692, pages 8572 - 8583, XP055172082 [Y] 2 * figure 2; table 1 * * page 8573, column l, paragraph 3 - paragraph 5 * * Section 3.1 Results and discussion; page 8575 - page 8576 * * Conclusions; page 8582 - page 8583 * [A] 1,3-16

DOI:   http://dx.doi.org/10.1039/c2ee22258b
ExaminationJP2014022280
    - Alexandre Ponrouch ET AL, "Towards high energy density sodium ion batteries through electrolyte optimization", Energy & Environmental Science, (20130101), vol. 6, no. 8, doi:10.1039/c3ee41379a, ISSN 1754-5692, page 2361, XP055172081

DOI:   http://dx.doi.org/10.1039/c3ee41379a
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.