| EP3030739 - METHOD FOR STEERING A DIRECTION OF A DRILLING DEVICE DRILLING A HOLE INTO THE GROUND [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.05.2022 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 28.05.2021 | ||
| Former | Grant of patent is intended Status updated on 24.01.2021 | ||
| Former | Examination is in progress Status updated on 23.02.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Geonex Oy Teollisuustie 9 95600 Ylitornio / FI | [2016/24] | Inventor(s) | 01 /
JUVANI, Kimmo Alkkulanraitti 99 FI-95600 Ylitornio / FI | [2016/24] | Representative(s) | Kolster Oy Ab (Salmisaarenaukio 1) P.O. Box 204 00181 Helsinki / FI | [2021/26] |
| Former [2016/24] | Kolster Oy Ab Iso Roobertinkatu 23 PO Box 148 00121 Helsinki / FI | Application number, filing date | 14834243.9 | 05.08.2014 | [2016/24] | WO2014FI00018 | Priority number, date | FI20130000224 | 05.08.2013 Original published format: FI 20130224 | [2016/24] | Filing language | FI | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015018969 | Date: | 12.02.2015 | Language: | EN | [2015/06] | Type: | A1 Application with search report | No.: | EP3030739 | Date: | 15.06.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.02.2015 takes the place of the publication of the European patent application. | [2016/24] | Type: | B1 Patent specification | No.: | EP3030739 | Date: | 30.06.2021 | Language: | EN | [2021/26] | Search report(s) | International search report - published on: | FI | 12.02.2015 | (Supplementary) European search report - dispatched on: | EP | 14.02.2017 | Classification | IPC: | E21B7/06, E21B4/16, E21B7/20 | [2021/02] | CPC: |
E21B7/067 (EP,US);
E21B4/16 (EP,US);
E21B6/00 (US);
E21B7/208 (EP)
|
| Former IPC [2017/11] | E21B7/06, E21B4/16 | ||
| Former IPC [2016/24] | E21B7/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/24] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUM STEUERN DER RICHTUNG EINER BOHRVORRICHTUNG ZUM BOHREN EINES LOCHS IN DEN BODEN | [2016/24] | English: | METHOD FOR STEERING A DIRECTION OF A DRILLING DEVICE DRILLING A HOLE INTO THE GROUND | [2016/24] | French: | PROCÉDÉ DE COMMANDE DE DIRECTION D'UN DISPOSITIF DE FORAGE FORANT UN TROU DANS LE SOL | [2016/24] | Entry into regional phase | 03.02.2016 | National basic fee paid | 03.02.2016 | Search fee paid | 03.02.2016 | Designation fee(s) paid | 03.02.2016 | Examination fee paid | Examination procedure | 03.02.2016 | Examination requested [2016/24] | 07.09.2017 | Amendment by applicant (claims and/or description) | 23.02.2018 | Despatch of a communication from the examining division (Time limit: M06) | 04.09.2018 | Reply to a communication from the examining division | 17.12.2018 | Despatch of a communication from the examining division (Time limit: M06) | 26.06.2019 | Reply to a communication from the examining division | 25.01.2021 | Communication of intention to grant the patent | 19.05.2021 | Fee for grant paid | 19.05.2021 | Fee for publishing/printing paid | 19.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.03.2022 | No opposition filed within time limit [2022/23] | Fees paid | Renewal fee | 16.08.2016 | Renewal fee patent year 03 | 23.08.2017 | Renewal fee patent year 04 | 23.08.2018 | Renewal fee patent year 05 | 20.08.2019 | Renewal fee patent year 06 | 24.08.2020 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.08.2014 | AL | 30.06.2021 | CY | 30.06.2021 | CZ | 30.06.2021 | DK | 30.06.2021 | EE | 30.06.2021 | HR | 30.06.2021 | LT | 30.06.2021 | LV | 30.06.2021 | MC | 30.06.2021 | MK | 30.06.2021 | MT | 30.06.2021 | NL | 30.06.2021 | PL | 30.06.2021 | RO | 30.06.2021 | RS | 30.06.2021 | SI | 30.06.2021 | SK | 30.06.2021 | SM | 30.06.2021 | LU | 05.08.2021 | BE | 31.08.2021 | BG | 30.09.2021 | GR | 01.10.2021 | IS | 30.10.2021 | PT | 02.11.2021 | [2024/41] |
| Former [2024/22] | HU | 05.08.2014 | |
| AL | 30.06.2021 | ||
| CY | 30.06.2021 | ||
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LT | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| MK | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SI | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| LU | 05.08.2021 | ||
| BE | 31.08.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2023/30] | HU | 05.08.2014 | |
| AL | 30.06.2021 | ||
| CY | 30.06.2021 | ||
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LT | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SI | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| LU | 05.08.2021 | ||
| BE | 31.08.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2023/29] | HU | 05.08.2014 | |
| AL | 30.06.2021 | ||
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LT | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SI | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| LU | 05.08.2021 | ||
| BE | 31.08.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2023/19] | AL | 30.06.2021 | |
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LT | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SI | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| LU | 05.08.2021 | ||
| BE | 31.08.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/34] | AL | 30.06.2021 | |
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SI | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| LU | 05.08.2021 | ||
| BE | 31.08.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/29] | AL | 30.06.2021 | |
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SI | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| LU | 05.08.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/26] | AL | 30.06.2021 | |
| CZ | 30.06.2021 | ||
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| LU | 05.08.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/24] | CZ | 30.06.2021 | |
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| LU | 05.08.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/21] | CZ | 30.06.2021 | |
| DK | 30.06.2021 | ||
| EE | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/18] | CZ | 30.06.2021 | |
| EE | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| MC | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/10] | CZ | 30.06.2021 | |
| EE | 30.06.2021 | ||
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| PL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| IS | 30.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/09] | CZ | 30.06.2021 | |
| HR | 30.06.2021 | ||
| LV | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| RO | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SK | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| PT | 02.11.2021 | ||
| Former [2022/07] | HR | 30.06.2021 | |
| LV | 30.06.2021 | ||
| NL | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| SM | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| Former [2021/51] | HR | 30.06.2021 | |
| LV | 30.06.2021 | ||
| RS | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| Former [2021/49] | HR | 30.06.2021 | |
| LV | 30.06.2021 | ||
| BG | 30.09.2021 | ||
| GR | 01.10.2021 | ||
| Former [2021/47] | BG | 30.09.2021 | Documents cited: | Search | [X] WO0055468 (GRAY IAN et al.) [X] 1,2,6-8 * page 4, line 1 - line 29 * * page 5, line 8 - line 23 * * page 7, line 18 - line 24 * * page 12, line 13 - line 24 * * page 13, line 24 - line 29; figures 3, 4; claims 13, 19-21 * | [XY] US2002011359 (WEBB CHARLES T et al.) [X] 1,2,6-8 * paragraphs [0143] , [ 146] , [ 151] , [ 153]; figures 74-76 *[Y] 1-10 | [Y] GB2425791 (LIMITED SONDEX et al.) [Y] 1-10 * page 1, line 19 - page 2, line 32 * * page 4, line 22 - page 8, line 21 * * page 9, line 29 - page 10, line 13; figures 1-7 * | International search | [A] US5220963 (PATTON BOB J et al.) [A] | [A] US5547031 (WARREN TOMMY M et al.) [A] | [A] WO0055468 (GRAY IAN et al.) [A] | [A] US2007187150 (WALKER COLIN et al.) [A] | Examination | US5002138 |