blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3050048

EP3050048 - VECTOR INDEXED MEMORY ACCESS PLUS ARITHMETIC AND/OR LOGICAL OPERATION PROCESSORS, METHODS, SYSTEMS, AND INSTRUCTIONS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.09.2023
Database last updated on 31.08.2024
FormerThe patent has been granted
Status updated on  30.09.2022
FormerGrant of patent is intended
Status updated on  30.05.2022
FormerExamination is in progress
Status updated on  30.11.2018
Most recent event   Tooltip07.06.2024Lapse of the patent in a contracting state
New state(s): MC
published on 10.07.2024  [2024/28]
Applicant(s)For all designated states
Intel Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
[2022/44]
Former [2016/31]For all designated states
Intel Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
Inventor(s)01 / ERMOLAEV, Igor
5/3-67 Fruktovaja Str.
603093 Nizhny Novgorod / RU
02 / TOLL, Bret L.
2868 NE Lorie Drive
Hillsboro, Oregon 97124 / US
03 / VALENTINE, Robert
Rechov Hadganiot 33-5
36054 Kiryat Tivon / IL
04 / CORBAL, Jesus
97224 King City / US
05 / DOSHI, Gautam B.
O-73 Diamond District
H.A.L. Airport Road
560008 Bangalore / IN
06 / CHAKRABORTY, Prasenjit
Flat 214 Royal Palms Apt
Lal Bahadur Shastry N
560017 Bangalore / IN
07 / MALLADI, Rama K
Mahaveer Springs 133 15th Main 17th Cross
JP
KA-78 Bangalore / IN
 [2022/44]
Former [2016/31]01 / ERMOLAEV, Igor
5/3-67 Fruktovaja Str.
603093 Nizhny Novgorod / RU
02 / TOLL, Bret L.
2868 NE Lorie Drive
Hillsboro, Oregon 97124 / US
03 / VALENTINE, Robert
Rechov Hadganiot 33-5
36054 Kiryat Tivon / IL
04 / SAN ADRIAN, Jesus C.
Casp 33 5-2
E-08010 Barcelona / ES
05 / DOSHI, Gautam B.
O-73 Diamond District
H.A.L. Airport Road
560008 Bangalore / IN
06 / CHAKRABORTY, Prasenjit
Flat 214 Royal Palms Apt
Lal Bahadur Shastry N
560017 Bangalore / IN
07 / MALLADI, Rama K
Mahaveer Springs 133 15th Main 17th Cross
JP
KA-78 Bangalore / IN
Representative(s)HGF
HGF Limited
1 City Walk
Leeds LS11 9DX / GB
[2022/44]
Former [2016/31]Hufton, David Alan
HGF Limited
Fountain Precinct
Balm Green
Sheffield S1 2JA / GB
Application number, filing date14848484.303.10.2014
[2016/31]
WO2014US59126
Priority number, dateUS20131404040927.09.2013         Original published format: US201314040409
[2016/31]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015048825
Date:02.04.2015
Language:EN
[2015/13]
Type: A1 Application with search report 
No.:EP3050048
Date:03.08.2016
Language:EN
The application published by WIPO in one of the EPO official languages on 02.04.2015 takes the place of the publication of the European patent application.
[2016/31]
Type: B1 Patent specification 
No.:EP3050048
Date:02.11.2022
Language:EN
[2022/44]
Search report(s)International search report - published on:KR02.04.2015
(Supplementary) European search report - dispatched on:EP19.12.2017
ClassificationIPC:G09F9/30, // G06F9/30
[2018/03]
CPC:
G06F9/30036 (EP,RU,US); G09F9/30 (RU); G06F9/30038 (EP,RU,US);
G06F9/3004 (US); G06F9/30043 (EP,US); G06F15/8007 (US);
G06F2212/454 (US); G06F9/30032 (US); G06F9/30047 (US) (-)
Former IPC [2016/31]G09F9/30
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/31]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VEKTORINDIZIERTER SPEICHERZUGRIFF MIT ARITHMETISCHEN UND/ODER LOGISCHEN OPERATIONSPROZESSOREN SOWIE VERFAHREN, SYSTEME UND ANWEISUNGEN[2016/31]
English:VECTOR INDEXED MEMORY ACCESS PLUS ARITHMETIC AND/OR LOGICAL OPERATION PROCESSORS, METHODS, SYSTEMS, AND INSTRUCTIONS[2016/31]
French:ACCÈS MÉMOIRE INDEXÉ SUR UN VECTEUR PLUS PROCESSEURS D'OPÉRATIONS ARITHMÉTIQUES ET/OU LOGIQUES, PROCÉDÉS, SYSTÈMES, ET INSTRUCTIONS[2016/31]
Entry into regional phase08.02.2016National basic fee paid 
08.02.2016Search fee paid 
08.02.2016Designation fee(s) paid 
08.02.2016Examination fee paid 
Examination procedure03.10.2014Loss of particular rights, legal effect: Priority
08.02.2016Examination requested  [2016/31]
28.06.2016Despatch of communication of loss of particular rights: Priority 0001
12.07.2018Amendment by applicant (claims and/or description)
30.11.2018Despatch of a communication from the examining division (Time limit: M04)
29.03.2019Reply to a communication from the examining division
21.06.2021Despatch of a communication from the examining division (Time limit: M04)
23.09.2021Reply to a communication from the examining division
31.05.2022Communication of intention to grant the patent
22.09.2022Fee for grant paid
22.09.2022Fee for publishing/printing paid
22.09.2022Receipt of the translation of the claim(s)
Opposition(s)03.08.2023No opposition filed within time limit [2023/41]
Fees paidRenewal fee
11.10.2016Renewal fee patent year 03
11.10.2017Renewal fee patent year 04
11.10.2018Renewal fee patent year 05
15.10.2019Renewal fee patent year 06
30.09.2020Renewal fee patent year 07
29.09.2021Renewal fee patent year 08
28.09.2022Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL02.11.2022
AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
IT02.11.2022
LT02.11.2022
LV02.11.2022
MC02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SI02.11.2022
SK02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
[2024/28]
Former [2024/26]AL02.11.2022
AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
IT02.11.2022
LT02.11.2022
LV02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SI02.11.2022
SK02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/51]AL02.11.2022
AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SI02.11.2022
SK02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/38]AL02.11.2022
AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SK02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/37]AL02.11.2022
AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/35]AT02.11.2022
CZ02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
PL02.11.2022
RO02.11.2022
RS02.11.2022
SE02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/34]AT02.11.2022
DK02.11.2022
EE02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
PL02.11.2022
RS02.11.2022
SE02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/33]AT02.11.2022
DK02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
PL02.11.2022
RS02.11.2022
SE02.11.2022
SM02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/26]AT02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
PL02.11.2022
RS02.11.2022
SE02.11.2022
NO02.02.2023
GR03.02.2023
IS02.03.2023
PT02.03.2023
Former [2023/24]AT02.11.2022
ES02.11.2022
FI02.11.2022
HR02.11.2022
LT02.11.2022
LV02.11.2022
SE02.11.2022
NO02.02.2023
GR03.02.2023
PT02.03.2023
Former [2023/23]AT02.11.2022
ES02.11.2022
FI02.11.2022
LT02.11.2022
LV02.11.2022
SE02.11.2022
NO02.02.2023
GR03.02.2023
PT02.03.2023
Former [2023/22]AT02.11.2022
ES02.11.2022
FI02.11.2022
LT02.11.2022
SE02.11.2022
NO02.02.2023
PT02.03.2023
Former [2023/20]LT02.11.2022
NO02.02.2023
Documents cited:Search[A]US7093102  (DULONG CAROLE [US]);
 [A]WO2007135615  (NXP BV [NL], et al);
 [A]US2013326160  (SPERBER ZEEV [IL], et al)
International search[A]US2009100247  (MOYER WILLIAM C [US], et al);
 [A]US2010318773  (GREYZCK TERRY D [US], et al);
 [A]US2012060020  (GONION JEFFRY E [US], et al)
by applicantUS2013326160
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.