| EP3054643 - TRANSMISSION DEVICE, RECEPTION DEVICE, TRANSMISSION/RECEPTION SYSTEM, AND IMAGE DISPLAY SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.12.2022 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 21.01.2022 | ||
| Former | Grant of patent is intended Status updated on 02.01.2022 | ||
| Former | Examination is in progress Status updated on 24.11.2021 | ||
| Former | Grant of patent is intended Status updated on 12.07.2021 | ||
| Former | Examination is in progress Status updated on 13.08.2020 | ||
| Former | Request for examination was made Status updated on 15.01.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Thine Electronics, Inc. 9-1 Kanda-mitoshiro-cho Chiyoda-ku Tokyo 101-0053 / JP | [2016/32] | Inventor(s) | 01 /
MATSUDA Hiromichi c/o THINE ELECTRONICS INC. 9-1 Kanda-mitoshiro-cho Chiyoda-ku Tokyo 101-0053 / JP | 02 /
UCHIDA Takatoshi c/o THINE ELECTRONICS INC. 9-1 Kanda-mitoshiro-cho Chiyoda-ku Tokyo 101-0053 / JP | 03 /
SUZUKI Takayuki c/o THINE ELECTRONICS INC. 9-1 Kanda-mitoshiro-cho Chiyoda-ku Tokyo 101-0053 / JP | [2016/32] | Representative(s) | EIP Fairfax House 15 Fulwood Place London WC1V 6HU / GB | [2022/08] |
| Former [2016/32] | EIP Fairfax House 15 Fulwood Place London WC1V 6HU / GB | Application number, filing date | 14850150.5 | 30.09.2014 | [2016/32] | WO2014JP76095 | Priority number, date | JP20130209352 | 04.10.2013 Original published format: JP 2013209352 | [2016/32] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015050123 | Date: | 09.04.2015 | Language: | JA | [2015/14] | Type: | A1 Application with search report | No.: | EP3054643 | Date: | 10.08.2016 | Language: | EN | [2016/32] | Type: | B1 Patent specification | No.: | EP3054643 | Date: | 23.02.2022 | Language: | EN | [2022/08] | Search report(s) | International search report - published on: | JP | 09.04.2015 | (Supplementary) European search report - dispatched on: | EP | 09.05.2017 | Classification | IPC: | H04L29/06, G06F13/36, G06F13/42, H04L29/08, G09G5/00, // G09G3/20 | [2017/23] | CPC: |
G09G5/006 (EP,KR,US);
G09G3/20 (EP,KR,US);
G09G5/008 (EP,US);
G09G2352/00 (EP,KR,US);
G09G2370/045 (EP,KR,US);
G09G2370/08 (EP,KR,US);
G09G2370/14 (EP,KR,US)
(-)
|
| Former IPC [2016/32] | H04L29/06, G06F13/36, G06F13/42, H04L29/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/32] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ÜBERTRAGUNGSVORRICHTUNG, EMPFANGSVORRICHTUNG, ÜBERTRAGUNGS- UND EMPFANGSSYSTEM SOWIE BILDANZEIGESYSTEM | [2016/32] | English: | TRANSMISSION DEVICE, RECEPTION DEVICE, TRANSMISSION/RECEPTION SYSTEM, AND IMAGE DISPLAY SYSTEM | [2016/32] | French: | DISPOSITIF D'ÉMISSION, DISPOSITIF DE RÉCEPTION, SYSTÈME D'ÉMISSION/RÉCEPTION ET SYSTÈME D'AFFICHAGE D'IMAGES | [2016/32] | Entry into regional phase | 04.04.2016 | Translation filed | 04.05.2016 | National basic fee paid | 04.05.2016 | Search fee paid | 04.05.2016 | Designation fee(s) paid | 04.05.2016 | Examination fee paid | Examination procedure | 04.05.2016 | Examination requested [2016/32] | 16.01.2018 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 20.03.2018 | Amendment by applicant (claims and/or description) | 12.08.2020 | Despatch of a communication from the examining division (Time limit: M06) | 11.02.2021 | Reply to a communication from the examining division | 13.07.2021 | Communication of intention to grant the patent | 23.11.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 03.01.2022 | Communication of intention to grant the patent | 12.01.2022 | Fee for grant paid | 12.01.2022 | Fee for publishing/printing paid | 12.01.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 24.11.2022 | No opposition filed within time limit [2023/05] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 20.03.2018 | Request for further processing filed | 20.03.2018 | Full payment received (date of receipt of payment) Request granted | 28.03.2018 | Decision despatched | Fees paid | Renewal fee | 22.09.2016 | Renewal fee patent year 03 | 29.09.2017 | Renewal fee patent year 04 | 28.09.2018 | Renewal fee patent year 05 | 27.09.2019 | Renewal fee patent year 06 | 25.09.2020 | Renewal fee patent year 07 | 27.09.2021 | Renewal fee patent year 08 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.09.2014 | AL | 23.02.2022 | AT | 23.02.2022 | CY | 23.02.2022 | CZ | 23.02.2022 | DK | 23.02.2022 | EE | 23.02.2022 | ES | 23.02.2022 | FI | 23.02.2022 | HR | 23.02.2022 | IT | 23.02.2022 | LT | 23.02.2022 | LV | 23.02.2022 | MC | 23.02.2022 | MK | 23.02.2022 | MT | 23.02.2022 | PL | 23.02.2022 | RO | 23.02.2022 | RS | 23.02.2022 | SE | 23.02.2022 | SI | 23.02.2022 | SK | 23.02.2022 | SM | 23.02.2022 | TR | 23.02.2022 | BG | 23.05.2022 | NO | 23.05.2022 | GR | 24.05.2022 | IS | 23.06.2022 | PT | 23.06.2022 | BE | 30.09.2022 | CH | 30.09.2022 | IE | 30.09.2022 | LI | 30.09.2022 | LU | 30.09.2022 | [2024/41] |
| Former [2024/29] | HU | 30.09.2014 | |
| AL | 23.02.2022 | ||
| AT | 23.02.2022 | ||
| CY | 23.02.2022 | ||
| CZ | 23.02.2022 | ||
| DK | 23.02.2022 | ||
| EE | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| IT | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| MC | 23.02.2022 | ||
| MK | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RO | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| SI | 23.02.2022 | ||
| SK | 23.02.2022 | ||
| SM | 23.02.2022 | ||
| TR | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| IE | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| LU | 30.09.2022 | ||
| Former [2024/27] | HU | 30.09.2014 | |
| AL | 23.02.2022 | ||
| AT | 23.02.2022 | ||
| CY | 23.02.2022 | ||
| CZ | 23.02.2022 | ||
| DK | 23.02.2022 | ||
| EE | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| IT | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| MC | 23.02.2022 | ||
| MK | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RO | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| SI | 23.02.2022 | ||
| SK | 23.02.2022 | ||
| SM | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| IE | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| LU | 30.09.2022 | ||
| Former [2024/21] | HU | 30.09.2014 | |
| AL | 23.02.2022 | ||
| AT | 23.02.2022 | ||
| CY | 23.02.2022 | ||
| CZ | 23.02.2022 | ||
| DK | 23.02.2022 | ||
| EE | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| IT | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| MC | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RO | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| SI | 23.02.2022 | ||
| SK | 23.02.2022 | ||
| SM | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| IE | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| LU | 30.09.2022 | ||
| Former [2024/18] | HU | 30.09.2014 | |
| AL | 23.02.2022 | ||
| AT | 23.02.2022 | ||
| CZ | 23.02.2022 | ||
| DK | 23.02.2022 | ||
| EE | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| IT | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| MC | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RO | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| SI | 23.02.2022 | ||
| SK | 23.02.2022 | ||
| SM | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| IE | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| LU | 30.09.2022 | ||
| Former [2023/42] | AL | 23.02.2022 | |
| AT | 23.02.2022 | ||
| CZ | 23.02.2022 | ||
| DK | 23.02.2022 | ||
| EE | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| IT | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| MC | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RO | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| SI | 23.02.2022 | ||
| SK | 23.02.2022 | ||
| SM | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| IE | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| LU | 30.09.2022 | ||
| Former [2023/35] | AL | 23.02.2022 | |
| AT | 23.02.2022 | ||
| CZ | 23.02.2022 | ||
| DK | 23.02.2022 | ||
| EE | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| IT | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| MC | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RO | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| SI | 23.02.2022 | ||
| SK | 23.02.2022 | ||
| SM | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| CH | 30.09.2022 | ||
| IE | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| LU | 30.09.2022 | ||
| Former [2023/33] | AL | 23.02.2022 | |
| AT | 23.02.2022 | ||
| CZ | 23.02.2022 | ||
| DK | 23.02.2022 | ||
| EE | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| MC | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RO | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| SI | 23.02.2022 | ||
| SK | 23.02.2022 | ||
| SM | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| IE | 30.09.2022 | ||
| LU | 30.09.2022 | ||
| Former [2023/30] | AL | 23.02.2022 | |
| AT | 23.02.2022 | ||
| CZ | 23.02.2022 | ||
| DK | 23.02.2022 | ||
| EE | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| MC | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RO | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| SI | 23.02.2022 | ||
| SK | 23.02.2022 | ||
| SM | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| LU | 30.09.2022 | ||
| Former [2023/22] | AL | 23.02.2022 | |
| AT | 23.02.2022 | ||
| CZ | 23.02.2022 | ||
| DK | 23.02.2022 | ||
| EE | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| MC | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RO | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| SI | 23.02.2022 | ||
| SK | 23.02.2022 | ||
| SM | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| Former [2023/10] | AL | 23.02.2022 | |
| AT | 23.02.2022 | ||
| CZ | 23.02.2022 | ||
| DK | 23.02.2022 | ||
| EE | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RO | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| SI | 23.02.2022 | ||
| SK | 23.02.2022 | ||
| SM | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| Former [2023/01] | AL | 23.02.2022 | |
| AT | 23.02.2022 | ||
| CZ | 23.02.2022 | ||
| DK | 23.02.2022 | ||
| EE | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RO | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| SK | 23.02.2022 | ||
| SM | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| Former [2022/49] | AT | 23.02.2022 | |
| CZ | 23.02.2022 | ||
| DK | 23.02.2022 | ||
| EE | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RO | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| SK | 23.02.2022 | ||
| SM | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| Former [2022/48] | AT | 23.02.2022 | |
| CZ | 23.02.2022 | ||
| DK | 23.02.2022 | ||
| EE | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RO | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| SM | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| Former [2022/47] | AT | 23.02.2022 | |
| DK | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RO | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| SM | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| Former [2022/46] | AT | 23.02.2022 | |
| DK | 23.02.2022 | ||
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| Former [2022/42] | AT | 23.02.2022 | |
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| IS | 23.06.2022 | ||
| PT | 23.06.2022 | ||
| Former [2022/39] | AT | 23.02.2022 | |
| ES | 23.02.2022 | ||
| FI | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| PT | 23.06.2022 | ||
| Former [2022/36] | AT | 23.02.2022 | |
| ES | 23.02.2022 | ||
| HR | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| LV | 23.02.2022 | ||
| PL | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| GR | 24.05.2022 | ||
| PT | 23.06.2022 | ||
| Former [2022/35] | ES | 23.02.2022 | |
| HR | 23.02.2022 | ||
| LT | 23.02.2022 | ||
| RS | 23.02.2022 | ||
| SE | 23.02.2022 | ||
| BG | 23.05.2022 | ||
| NO | 23.05.2022 | ||
| PT | 23.06.2022 | ||
| Former [2022/34] | ES | 23.02.2022 | |
| LT | 23.02.2022 | ||
| NO | 23.05.2022 | ||
| PT | 23.06.2022 | ||
| Former [2022/33] | LT | 23.02.2022 | |
| NO | 23.05.2022 | Documents cited: | Search | [I] US2011242066 (JEON HYUN-KYU et al.) [I] 1-4 * figures 6-9 * * paragraphs [0001] , [0021] , [0024] , [0044] - [0053] - [0058] , [0061] * | [A] US2013113777 (BAEK DONG-HOON et al.) [A] 1-4 * figures 1-5 * * paragraphs [0039] , [0042] , [0048] , [0065] - [0068] - [0082] , [0104] - [0107] * | International search | [A] JP2013500682 | [A] JP2001251385 (SONY CORP et al.) | [A] WO2010053021 (THINE ELECTRONICS INC et al.) [A] | [A] US2013262720 (KOBAYASHI ALAN OSAMU et al.) [A] | by applicant | JEONG-HO KANG ET AL.: "A Clock-embedded Voltage Differential Signaling (CVDS) for the Chip-On-Glass Application of TFT-LCD", SID 10 DIGEST, 2010, pages 66 - 69 | DONG HOON BAEK ET AL.: "Late-NewsPaper: The Enhanced Reduced Voltage Differential Signaling (eRVDS) Interface With Clock Embedded Scheme for Chip-On-Glass TFT-LCD Applications", SID 10 DIGEST, 2010, pages 70 - 73 |