EP3055980 - SYSTEMS AND METHODS FOR NOISE FLOOR OPTIMIZATION IN DISTRIBUTED ANTENNA SYSTEM WITH DIRECT DIGITAL INTERFACE TO BASE STATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.07.2024 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 28.07.2023 | ||
Former | Grant of patent is intended Status updated on 13.03.2023 | ||
Former | Examination is in progress Status updated on 18.05.2019 | Most recent event Tooltip | 15.11.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states CommScope Technologies LLC 1100 CommScope Place SE Hickory, NC 28602 / US | [2021/11] |
Former [2016/33] | For all designated states CommScope Technologies LLC 100 New Bridge Street London EC4V 6JA / GB | Inventor(s) | 01 /
ZAVADSKY, Dean 1478 Ashbourne Circle Shakopee, Minnesota 55379 / US | 02 /
WALA, Philip M. 14082 Toledo Court Savage, Minnesota 55378 / US | [2016/33] | Representative(s) | Abel & Imray LLP Westpoint Building James Street West Bath BA1 2DA / GB | [2023/35] |
Former [2016/33] | Burt, Matthew Thomas, et al Abel & Imray 20 Red Lion Street London WC1R 4PQ / GB | Application number, filing date | 14851729.5 | 06.10.2014 | [2016/33] | WO2014US59371 | Priority number, date | US201361887703P | 07.10.2013 Original published format: US 201361887703 P | [2016/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015054164 | Date: | 16.04.2015 | Language: | EN | [2015/15] | Type: | A1 Application with search report | No.: | EP3055980 | Date: | 17.08.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.04.2015 takes the place of the publication of the European patent application. | [2016/33] | Type: | B1 Patent specification | No.: | EP3055980 | Date: | 30.08.2023 | Language: | EN | [2023/35] | Search report(s) | International search report - published on: | KR | 16.04.2015 | (Supplementary) European search report - dispatched on: | EP | 15.05.2017 | Classification | IPC: | H04L25/02, H04W88/08 | [2017/24] | CPC: |
H04W88/085 (EP,US);
H04B7/04 (US);
H04B7/12 (US);
H04J1/05 (US);
H04J1/065 (US);
H04L25/08 (US);
H04L25/14 (US);
H04W56/0005 (US);
H04W56/0015 (US);
H04W84/02 (US);
H04W88/12 (US);
H04W88/16 (US);
|
Former IPC [2016/33] | H04L29/10, H04L25/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/33] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SYSTEME UND VERFAHREN ZUR OPTIMIERUNG DES GRUNDRAUSCHENS BEI EINEM VERTEILTEN ANTENNENSYSTEM MIT DIREKTER DIGITALER SCHNITTSTELLE ZUR BASISSTATION | [2016/33] | English: | SYSTEMS AND METHODS FOR NOISE FLOOR OPTIMIZATION IN DISTRIBUTED ANTENNA SYSTEM WITH DIRECT DIGITAL INTERFACE TO BASE STATION | [2016/33] | French: | SYSTÈMES ET PROCÉDÉS D'OPTIMISATION DE BRUIT DE FOND DANS UN SYSTÈME D'ANTENNES DISTRIBUÉES AVEC INTERFACE NUMÉRIQUE DIRECTE AVEC UNE STATION DE BASE | [2016/33] | Entry into regional phase | 08.04.2016 | National basic fee paid | 08.04.2016 | Search fee paid | 08.04.2016 | Designation fee(s) paid | 08.04.2016 | Examination fee paid | Examination procedure | 08.04.2016 | Examination requested [2016/33] | 11.12.2017 | Amendment by applicant (claims and/or description) | 22.05.2019 | Despatch of a communication from the examining division (Time limit: M06) | 29.11.2019 | Reply to a communication from the examining division | 11.03.2020 | Despatch of a communication from the examining division (Time limit: M06) | 21.09.2020 | Reply to a communication from the examining division | 22.01.2021 | Despatch of a communication from the examining division (Time limit: M04) | 20.05.2021 | Reply to a communication from the examining division | 21.09.2021 | Despatch of a communication from the examining division (Time limit: M04) | 01.02.2022 | Reply to a communication from the examining division | 08.07.2022 | Despatch of a communication from the examining division (Time limit: M04) | 16.11.2022 | Reply to a communication from the examining division | 13.03.2023 | Communication of intention to grant the patent | 19.07.2023 | Fee for grant paid | 19.07.2023 | Fee for publishing/printing paid | 19.07.2023 | Receipt of the translation of the claim(s) | Divisional application(s) | EP23186153.5 Application withdrawn : 09.08.2023 | Opposition(s) | 03.06.2024 | No opposition filed within time limit [2024/32] | Fees paid | Renewal fee | 27.10.2016 | Renewal fee patent year 03 | 27.10.2017 | Renewal fee patent year 04 | 29.10.2018 | Renewal fee patent year 05 | 28.10.2019 | Renewal fee patent year 06 | 27.10.2020 | Renewal fee patent year 07 | 27.10.2021 | Renewal fee patent year 08 | 27.10.2022 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 30.08.2023 | BG | 30.08.2023 | CZ | 30.08.2023 | DK | 30.08.2023 | EE | 30.08.2023 | ES | 30.08.2023 | FI | 30.08.2023 | HR | 30.08.2023 | LT | 30.08.2023 | LV | 30.08.2023 | MC | 30.08.2023 | NL | 30.08.2023 | PL | 30.08.2023 | RO | 30.08.2023 | RS | 30.08.2023 | SE | 30.08.2023 | SI | 30.08.2023 | SK | 30.08.2023 | SM | 30.08.2023 | IE | 06.10.2023 | LU | 06.10.2023 | BE | 31.10.2023 | CH | 31.10.2023 | NO | 30.11.2023 | GR | 01.12.2023 | IS | 30.12.2023 | PT | 02.01.2024 | [2024/51] |
Former [2024/46] | AT | 30.08.2023 | |
CZ | 30.08.2023 | ||
DK | 30.08.2023 | ||
EE | 30.08.2023 | ||
ES | 30.08.2023 | ||
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
MC | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RO | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SI | 30.08.2023 | ||
SK | 30.08.2023 | ||
SM | 30.08.2023 | ||
IE | 06.10.2023 | ||
LU | 06.10.2023 | ||
BE | 31.10.2023 | ||
CH | 31.10.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
PT | 02.01.2024 | ||
Former [2024/36] | AT | 30.08.2023 | |
CZ | 30.08.2023 | ||
DK | 30.08.2023 | ||
EE | 30.08.2023 | ||
ES | 30.08.2023 | ||
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
MC | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RO | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SI | 30.08.2023 | ||
SK | 30.08.2023 | ||
SM | 30.08.2023 | ||
LU | 06.10.2023 | ||
BE | 31.10.2023 | ||
CH | 31.10.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
PT | 02.01.2024 | ||
Former [2024/34] | AT | 30.08.2023 | |
CZ | 30.08.2023 | ||
DK | 30.08.2023 | ||
EE | 30.08.2023 | ||
ES | 30.08.2023 | ||
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
MC | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RO | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SK | 30.08.2023 | ||
SM | 30.08.2023 | ||
LU | 06.10.2023 | ||
CH | 31.10.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
PT | 02.01.2024 | ||
Former [2024/30] | AT | 30.08.2023 | |
CZ | 30.08.2023 | ||
DK | 30.08.2023 | ||
EE | 30.08.2023 | ||
ES | 30.08.2023 | ||
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
MC | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RO | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SK | 30.08.2023 | ||
SM | 30.08.2023 | ||
LU | 06.10.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
PT | 02.01.2024 | ||
Former [2024/28] | AT | 30.08.2023 | |
CZ | 30.08.2023 | ||
DK | 30.08.2023 | ||
EE | 30.08.2023 | ||
ES | 30.08.2023 | ||
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
MC | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RO | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SK | 30.08.2023 | ||
SM | 30.08.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
PT | 02.01.2024 | ||
Former [2024/23] | AT | 30.08.2023 | |
CZ | 30.08.2023 | ||
DK | 30.08.2023 | ||
EE | 30.08.2023 | ||
ES | 30.08.2023 | ||
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RO | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SK | 30.08.2023 | ||
SM | 30.08.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
PT | 02.01.2024 | ||
Former [2024/22] | AT | 30.08.2023 | |
CZ | 30.08.2023 | ||
DK | 30.08.2023 | ||
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RO | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SM | 30.08.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/20] | AT | 30.08.2023 | |
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
SM | 30.08.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/14] | AT | 30.08.2023 | |
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
NL | 30.08.2023 | ||
PL | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/10] | AT | 30.08.2023 | |
FI | 30.08.2023 | ||
HR | 30.08.2023 | ||
LT | 30.08.2023 | ||
LV | 30.08.2023 | ||
PL | 30.08.2023 | ||
RS | 30.08.2023 | ||
SE | 30.08.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/09] | AT | 30.08.2023 | |
FI | 30.08.2023 | ||
LT | 30.08.2023 | ||
SE | 30.08.2023 | ||
NO | 30.11.2023 | ||
GR | 01.12.2023 | ||
IS | 30.12.2023 | ||
Former [2024/08] | LT | 30.08.2023 | |
NO | 30.11.2023 | ||
GR | 01.12.2023 | Documents cited: | Search | [XAY]US2009180407 (SABAT JOHN [US], et al); | [A]WO2011156465 (ANDREW LLC [US], et al); | [IY]US2012057572 (EVANS ALLAN M [US], et al); | [A]WO2012044969 (ANDREW LLC [US], et al); | [XY]US2012314797 (KUMMETZ THOMAS [US], et al) | International search | [A]US2006172775 (CONYERS DAVID J [US], et al); | [A]WO2010133942 (TEKO TELECOM S P A [IT], et al); | [A]US2011194548 (FEDER PERETZ MOSHES [US], et al); | [A]US2012213164 (ZUCKERMAN GAL [IL], et al); | [A]US2013195467 (SCHMID PETER [DE], et al) | by applicant | US2009180407 | US2012314797 |