EP3069088 - SOLAR COLLECTION ASSEMBLY, SYSTEM, AND METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.11.2020 Database last updated on 20.12.2024 | |
Former | The patent has been granted Status updated on 06.12.2019 | ||
Former | Grant of patent is intended Status updated on 23.06.2019 | ||
Former | Examination is in progress Status updated on 27.04.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Asm IP Holdings, LLC 1776 Franciso Drive Columbus, OH 43220 / US | [2016/38] | Inventor(s) | 01 /
SANESE, Christopher, N. 1776 Franciso Drive Columbus, OH 43220 / US | [2016/38] | Representative(s) | Ipsilon Benelux 76, rue de Merl 2146 Luxembourg / LU | [N/P] |
Former [2020/02] | Lecomte & Partners 76-78, rue de Merl 2146 Luxembourg / LU | ||
Former [2016/38] | Lecomte & Partners P.O. Box 1623 1016 Luxembourg / LU | Application number, filing date | 14862607.0 | 07.11.2014 | [2016/38] | WO2014US64456 | Priority number, date | US201361902837P | 12.11.2013 Original published format: US 201361902837 P | [2016/38] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015073306 | Date: | 21.05.2015 | Language: | EN | [2015/20] | Type: | A1 Application with search report | No.: | EP3069088 | Date: | 21.09.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.05.2015 takes the place of the publication of the European patent application. | [2016/38] | Type: | B1 Patent specification | No.: | EP3069088 | Date: | 08.01.2020 | Language: | EN | [2020/02] | Search report(s) | International search report - published on: | US | 21.05.2015 | (Supplementary) European search report - dispatched on: | EP | 08.06.2017 | Classification | IPC: | H01L31/054, H02S40/42, H02S10/12, H02S40/22, H02J7/35 | [2019/23] | CPC: |
H02S10/12 (EP,US);
F03D9/007 (US);
F03D9/25 (EP,US);
H01L31/0508 (EP,US);
H01L31/0547 (EP,US);
H02J7/35 (EP,US);
H02S40/22 (US);
H02S40/425 (EP,US);
H02J2300/40 (EP);
|
Former IPC [2017/27] | H01L31/054, F24J2/07, H02S40/42 | ||
Former IPC [2016/38] | F24J2/07 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/38] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SONNENENERGIESAMMLUNGSANORDNUNG, -SYSTEM UND -VERFAHREN | [2016/38] | English: | SOLAR COLLECTION ASSEMBLY, SYSTEM, AND METHOD | [2016/38] | French: | ENSEMBLE DE COLLECTE SOLAIRE, SYSTÈME ET PROCÉDÉ | [2016/38] | Entry into regional phase | 08.06.2016 | National basic fee paid | 08.06.2016 | Search fee paid | 08.06.2016 | Designation fee(s) paid | 08.06.2016 | Examination fee paid | Examination procedure | 08.06.2016 | Examination requested [2016/38] | 08.01.2018 | Amendment by applicant (claims and/or description) | 30.04.2018 | Despatch of a communication from the examining division (Time limit: M04) | 10.09.2018 | Reply to a communication from the examining division | 24.06.2019 | Communication of intention to grant the patent | 04.11.2019 | Fee for grant paid | 04.11.2019 | Fee for publishing/printing paid | 04.11.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 09.10.2020 | No opposition filed within time limit [2020/51] | Fees paid | Renewal fee | 04.10.2016 | Renewal fee patent year 03 | 01.09.2017 | Renewal fee patent year 04 | 14.11.2018 | Renewal fee patent year 05 | 27.11.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.11.2014 | AL | 08.01.2020 | AT | 08.01.2020 | CY | 08.01.2020 | CZ | 08.01.2020 | DK | 08.01.2020 | EE | 08.01.2020 | FI | 08.01.2020 | HR | 08.01.2020 | LT | 08.01.2020 | LV | 08.01.2020 | MC | 08.01.2020 | MK | 08.01.2020 | MT | 08.01.2020 | PL | 08.01.2020 | RO | 08.01.2020 | RS | 08.01.2020 | SE | 08.01.2020 | SI | 08.01.2020 | SK | 08.01.2020 | SM | 08.01.2020 | TR | 08.01.2020 | BG | 08.04.2020 | NO | 08.04.2020 | GR | 09.04.2020 | IS | 08.05.2020 | PT | 31.05.2020 | [2022/31] |
Former [2022/30] | HU | 07.11.2014 | |
AL | 08.01.2020 | ||
AT | 08.01.2020 | ||
CY | 08.01.2020 | ||
CZ | 08.01.2020 | ||
DK | 08.01.2020 | ||
EE | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
MC | 08.01.2020 | ||
MT | 08.01.2020 | ||
PL | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SI | 08.01.2020 | ||
SK | 08.01.2020 | ||
SM | 08.01.2020 | ||
TR | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2022/27] | HU | 07.11.2014 | |
AT | 08.01.2020 | ||
CY | 08.01.2020 | ||
CZ | 08.01.2020 | ||
DK | 08.01.2020 | ||
EE | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
MC | 08.01.2020 | ||
MT | 08.01.2020 | ||
PL | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SI | 08.01.2020 | ||
SK | 08.01.2020 | ||
SM | 08.01.2020 | ||
TR | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2021/31] | AT | 08.01.2020 | |
CZ | 08.01.2020 | ||
DK | 08.01.2020 | ||
EE | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
MC | 08.01.2020 | ||
PL | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SI | 08.01.2020 | ||
SK | 08.01.2020 | ||
SM | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2021/11] | AT | 08.01.2020 | |
CZ | 08.01.2020 | ||
DK | 08.01.2020 | ||
EE | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
PL | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SI | 08.01.2020 | ||
SK | 08.01.2020 | ||
SM | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2020/50] | CZ | 08.01.2020 | |
DK | 08.01.2020 | ||
EE | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SK | 08.01.2020 | ||
SM | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2020/49] | CZ | 08.01.2020 | |
DK | 08.01.2020 | ||
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SK | 08.01.2020 | ||
SM | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2020/48] | DK | 08.01.2020 | |
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
RO | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
SM | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2020/47] | DK | 08.01.2020 | |
FI | 08.01.2020 | ||
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2020/40] | FI | 08.01.2020 | |
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
IS | 08.05.2020 | ||
PT | 31.05.2020 | ||
Former [2020/39] | FI | 08.01.2020 | |
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
BG | 08.04.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
PT | 31.05.2020 | ||
Former [2020/38] | FI | 08.01.2020 | |
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
NO | 08.04.2020 | ||
GR | 09.04.2020 | ||
PT | 31.05.2020 | ||
Former [2020/37] | FI | 08.01.2020 | |
HR | 08.01.2020 | ||
LT | 08.01.2020 | ||
LV | 08.01.2020 | ||
RS | 08.01.2020 | ||
SE | 08.01.2020 | ||
NO | 08.04.2020 | ||
PT | 31.05.2020 | ||
Former [2020/36] | FI | 08.01.2020 | |
LT | 08.01.2020 | ||
RS | 08.01.2020 | ||
NO | 08.04.2020 | ||
PT | 31.05.2020 | ||
Former [2020/35] | FI | 08.01.2020 | |
LT | 08.01.2020 | ||
NO | 08.04.2020 | Documents cited: | Search | [XAYI]WO2005090873 (MENOVA ENGINEERING INC [CA], et al) [X] 1,2,9,10,12-15 * page 23, lines 13-19; figures 13, 1A, 5A, 9A * * page 34, lines 9-27 * [A] 11 [Y] 6,7 [I] 4,5,8; | [XAI]US2009101193 (HSIAO BOR-YUAN [TW]) [X] 1,3,12,14 * paragraph [0016] - paragraph [0022]; figure 2 * [A] 11 [I] 4,5,9,10; | [XA]US2012266941 (OZEKI SYU-U [JP], et al) [X] 1,4,12 * paragraph [0052] - paragraph [0057] * [A] 11; | [XAI]EP2275348 (HAMILTON SUNDSTRAND CORP [US]) [X] 1,12 * paragraph [0011] - paragraph [0015]; figures 6, 7 * [A] 11 [I] 2,4,5,13; | [Y]WO02079793 (SOLAR SYSTEMS PTY LTD [AU], et al) [Y] 6,7 * page 9, lines 26-27; figure 2 * | International search | [A]US4599995 (DANE JOHN A [US]); | [A]US6336452 (TIREY JR TOMMY LEE [US]); | [A]US2013081671 (HUI JOSEPH Y [US], et al); | [A]US4340031 (NIEDERMEYER WILLIAM P) | Examination | US2008047270 | by applicant | WO2005090873 |