Extract from the Register of European Patents

EP About this file: EP3088425

EP3088425 - FLUORINATED MACROINITIATOR AND METHOD FOR PRODUCING SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.08.2021
Database last updated on 14.03.2026
FormerThe patent has been granted
Status updated on  28.08.2020
FormerGrant of patent is intended
Status updated on  14.05.2020
FormerExamination is in progress
Status updated on  02.03.2019
Most recent event   Tooltip22.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 24.08.2022  [2022/34]
Applicant(s)For all designated states
Unimatec Co., Ltd.
12-15, Shibadaimon 1-chome
Minato-ku
Tokyo 105-0012 / JP
[2016/44]
Inventor(s)01 / SAITO, Satoru
c/o UNIMATEC CO. LTD.
831-2 Kamisohda
Isohara-machi
Kitaibaraki-shi Ibaraki 319-1593 / JP
02 / SATO, Katsuyuki
c/o UNIMATEC CO. LTD.
831-2 Kamisohda
Isohara-machi
Kitaibaraki-shi Ibaraki 319-1593 / JP
03 / SONOI, Takehiro
c/o UNIMATEC CO. LTD.
831-2 Kamisohda
Isohara-machi
Kitaibaraki-shi Ibaraki 319-1593 / JP
 [2016/44]
Representative(s)Michalski Hüttermann & Partner Patentanwälte mbB
Kaistraße 16A
40221 Düsseldorf / DE
[N/P]
Former [2016/44]Michalski Hüttermann & Partner Patentanwälte mbB
Speditionstraße 21
40221 Düsseldorf / DE
Application number, filing date14874475.822.12.2014
[2016/44]
WO2014JP83923
Priority number, dateJP2013026728225.12.2013         Original published format: JP 2013267282
[2016/44]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015098847
Date:02.07.2015
Language:JA
[2015/26]
Type: A1 Application with search report 
No.:EP3088425
Date:02.11.2016
Language:EN
[2016/44]
Type: B1 Patent specification 
No.:EP3088425
Date:30.09.2020
Language:EN
[2020/40]
Search report(s)International search report - published on:JP02.07.2015
(Supplementary) European search report - dispatched on:EP03.08.2017
ClassificationIPC:C08F4/00, C08F2/38, C08F20/22, C08F4/04, C08F293/00
[2017/36]
CPC:
C08F2/38 (EP,US); C08F20/22 (EP,US); C08F293/005 (EP,US);
C08F4/00 (EP,US); C08F4/04 (EP,US); C08F2438/01 (EP,US);
C08F2438/03 (EP,US) (-)
Former IPC [2016/44]C08F4/00, C08F2/38, C08F20/22
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/44]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:FLUORIERTER MAKROINITIATOR UND VERFAHREN ZUR HERSTELLUNG DAVON[2016/44]
English:FLUORINATED MACROINITIATOR AND METHOD FOR PRODUCING SAME[2016/44]
French:MACRO-INITIATEUR FLUORÉ ET PROCÉDÉ POUR LE FABRIQUER[2016/44]
Entry into regional phase19.07.2016Translation filed 
19.07.2016National basic fee paid 
19.07.2016Search fee paid 
19.07.2016Designation fee(s) paid 
19.07.2016Examination fee paid 
Examination procedure19.07.2016Examination requested  [2016/44]
13.02.2018Amendment by applicant (claims and/or description)
06.03.2019Despatch of a communication from the examining division (Time limit: M04)
05.06.2019Reply to a communication from the examining division
15.05.2020Communication of intention to grant the patent
19.08.2020Fee for grant paid
19.08.2020Fee for publishing/printing paid
19.08.2020Receipt of the translation of the claim(s)
Opposition(s)01.07.2021No opposition filed within time limit [2021/36]
Fees paidRenewal fee
28.12.2016Renewal fee patent year 03
21.12.2017Renewal fee patent year 04
19.12.2018Renewal fee patent year 05
18.12.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.12.2014
AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
MK30.09.2020
MT30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
TR30.09.2020
IE22.12.2020
LU22.12.2020
BG30.12.2020
GB30.12.2020
NO30.12.2020
BE31.12.2020
CH31.12.2020
FR31.12.2020
GR31.12.2020
LI31.12.2020
IS30.01.2021
PT01.02.2021
[2022/34]
Former [2022/32]HU22.12.2014
AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
MK30.09.2020
MT30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
TR30.09.2020
IE22.12.2020
LU22.12.2020
BG30.12.2020
GB30.12.2020
NO30.12.2020
CH31.12.2020
FR31.12.2020
GR31.12.2020
LI31.12.2020
IS30.01.2021
PT01.02.2021
Former [2022/27]HU22.12.2014
AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
MT30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
TR30.09.2020
IE22.12.2020
LU22.12.2020
BG30.12.2020
GB30.12.2020
NO30.12.2020
CH31.12.2020
FR31.12.2020
GR31.12.2020
LI31.12.2020
IS30.01.2021
PT01.02.2021
Former [2022/23]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
IE22.12.2020
LU22.12.2020
BG30.12.2020
GB30.12.2020
NO30.12.2020
CH31.12.2020
FR31.12.2020
GR31.12.2020
LI31.12.2020
IS30.01.2021
PT01.02.2021
Former [2022/10]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
IE22.12.2020
LU22.12.2020
BG30.12.2020
GB30.12.2020
NO30.12.2020
CH31.12.2020
FR31.12.2020
GR31.12.2020
LI31.12.2020
PT01.02.2021
Former [2021/52]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
IE22.12.2020
LU22.12.2020
BG30.12.2020
GB30.12.2020
NO30.12.2020
CH31.12.2020
FR31.12.2020
GR31.12.2020
LI31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/49]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
IE22.12.2020
LU22.12.2020
BG30.12.2020
GB30.12.2020
NO30.12.2020
FR31.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/48]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
IE22.12.2020
LU22.12.2020
BG30.12.2020
NO30.12.2020
FR31.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/47]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
IE22.12.2020
LU22.12.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/46]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
IE22.12.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/40]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/37]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/28]AL30.09.2020
AT30.09.2020
CZ30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/25]AL30.09.2020
AT30.09.2020
CZ30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/24]AT30.09.2020
CZ30.09.2020
EE30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/23]CZ30.09.2020
EE30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/22]CZ30.09.2020
EE30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/21]FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/20]FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
Former [2021/10]FI30.09.2020
HR30.09.2020
LV30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
Former [2021/08]FI30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
Former [2021/07]FI30.09.2020
NO30.12.2020
Documents cited:Search[X] WO2013120055  (DU PONT et al.) [X] 1,3-5,7 * page 4, lines 20-23 * * page 7, line 13 - line 15 * * example 5 * * examples 5a, 5b *
 [X] WO2013120051  (DU PONT et al.) [X] 1,3-5,7 * page 4, line 20 - line 23 * * page 7, line 13 - line 15 *
 [X]   MICHAEL T. SHEEHAN ET AL: "High chi polymer development for DSA applications using RAFT technology", SPIE - INTERNATIONAL SOCIETY FOR OPTICAL ENGINEERING. PROCEEDINGS, vol. 8682, 29 March 2013 (2013-03-29), US, pages 868225, XP055393567, ISSN: 0277-786X, ISBN: 978-1-5106-0753-8, DOI: 10.1117/12.2018255 [X] 1,3-5,7 * the whole document *

DOI:   http://dx.doi.org/10.1117/12.2018255
International search[X] WO2013120055  (DU PONT et al.) [X]
 [X] WO2013120051  (DU PONT et al.) [X]
 [A] JP2013139563  (GOODYEAR TIRE & RUBBER et al.) [A]
 [A] JP2012236891  (HITACHI CHEMICAL CO LTD et al.) [A]
 [A] JP2013227505  (SUNTECH CO LTD et al.) [A]
 [A] WO2013027679  (ASAHI GLASS CO LTD et al.) [A]
 [A] JP2010512444   [A]
by applicantJP2004300313
 JP2006063132
 JP2008297522
 JP2009242550
 JP2010235784
 WO2011099540
   MOAD, G. ET AL., AUST. J. CHEM., vol. 58, 2005, pages 379 - 410
   MATYJASZEWSKI, K. ET AL., CHEM. REV., vol. 101, 2001, pages 2921 - 2990
   BENOIT, D. ET AL., J. AM. CHEM. SOC., vol. 121, 1999, pages 3904
   KOIRY, B. P. ET AL., J. FLUORINE CHEM., vol. 153, 2013, pages 137 - 142
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.