EP3091674 - METHOD AND MTC DEVICE FOR PERFORMING RANDOM ACCESS PROCEDURE ACCORDING TO PLURALITY OF PARAMETER SETS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 24.05.2019 | ||
Former | Grant of patent is intended Status updated on 03.02.2019 | ||
Former | Examination is in progress Status updated on 01.06.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states LG Electronics Inc. 128, Yeoui-daero Yeongdeungpo-gu Seoul 150-721 / KR | [2016/45] | Inventor(s) | 01 /
HWANG, Daesung LG Electronics Inc. Seocho R&D Campus 19 Yangjae-daero 11-gil Seocho-gu Seoul 137-893 / KR | 02 /
AHN, Joonkui LG Electronics Inc. Seocho R&D Campus 19 Yangjae-daero 11-gil Seocho-gu Seoul 137-893 / KR | 03 /
YANG, Suckchel LG Electronics Inc. Seocho R&D Campus 19 Yangjae-daero 11-gil Seocho-gu Seoul 137-893 / KR | 04 /
YI, Yunjung LG Electronics Inc. Seocho R&D Campus 19 Yangjae-daero 11-gil Seocho-gu Seoul 137-893 / KR | [2016/45] | Representative(s) | Katérle, Axel Wuesthoff & Wuesthoff Patentanwälte PartG mbB Schweigerstraße 2 81541 München / DE | [2016/45] | Application number, filing date | 14876549.8 | 23.12.2014 | [2016/45] | WO2014KR12676 | Priority number, date | US201361922056P | 30.12.2013 Original published format: US 201361922056 P | [2016/45] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015102281 | Date: | 09.07.2015 | Language: | KO | [2015/27] | Type: | A1 Application with search report | No.: | EP3091674 | Date: | 09.11.2016 | Language: | EN | [2016/45] | Type: | B1 Patent specification | No.: | EP3091674 | Date: | 26.06.2019 | Language: | EN | [2019/26] | Search report(s) | International search report - published on: | KR | 09.07.2015 | (Supplementary) European search report - dispatched on: | EP | 21.07.2017 | Classification | IPC: | H04W74/08, H04W4/70 | [2019/04] | CPC: |
H04W74/0833 (EP,US);
H04W4/70 (EP,US)
|
Former IPC [2017/34] | H04W74/08 | ||
Former IPC [2016/45] | H04B7/26 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/45] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND MTC-VORRICHTUNG ZUR DURCHFÜHRUNG EINES DIREKTZUGRIFFSVERFAHRENS NACH MEHREREN PARAMETERMENGEN | [2016/45] | English: | METHOD AND MTC DEVICE FOR PERFORMING RANDOM ACCESS PROCEDURE ACCORDING TO PLURALITY OF PARAMETER SETS | [2016/45] | French: | PROCÉDÉ ET DISPOSITIF MTC D'EXÉCUTION D'UNE PROCÉDURE D'ACCÈS ALÉATOIRE CONFORMÉMENT À UNE PLURALITÉ D'ENSEMBLES DE PARAMÈTRES | [2016/45] | Entry into regional phase | 28.06.2016 | Translation filed | 28.06.2016 | National basic fee paid | 28.06.2016 | Search fee paid | 28.06.2016 | Designation fee(s) paid | 28.06.2016 | Examination fee paid | Examination procedure | 28.06.2016 | Examination requested [2016/45] | 06.02.2018 | Amendment by applicant (claims and/or description) | 31.05.2018 | Despatch of a communication from the examining division (Time limit: M06) | 16.11.2018 | Reply to a communication from the examining division | 04.02.2019 | Communication of intention to grant the patent | 16.05.2019 | Fee for grant paid | 16.05.2019 | Fee for publishing/printing paid | 16.05.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 23.12.2016 | Renewal fee patent year 03 | 21.12.2017 | Renewal fee patent year 04 | 19.12.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.12.2014 | AL | 26.06.2019 | AT | 26.06.2019 | CY | 26.06.2019 | CZ | 26.06.2019 | DK | 26.06.2019 | EE | 26.06.2019 | ES | 26.06.2019 | FI | 26.06.2019 | HR | 26.06.2019 | IT | 26.06.2019 | LT | 26.06.2019 | LV | 26.06.2019 | MC | 26.06.2019 | MK | 26.06.2019 | MT | 26.06.2019 | NL | 26.06.2019 | PL | 26.06.2019 | RO | 26.06.2019 | RS | 26.06.2019 | SE | 26.06.2019 | SI | 26.06.2019 | SK | 26.06.2019 | SM | 26.06.2019 | TR | 26.06.2019 | BG | 26.09.2019 | NO | 26.09.2019 | GR | 27.09.2019 | IS | 26.10.2019 | PT | 28.10.2019 | GB | 23.12.2019 | IE | 23.12.2019 | LU | 23.12.2019 | BE | 31.12.2019 | CH | 31.12.2019 | FR | 31.12.2019 | LI | 31.12.2019 | [2022/31] |
Former [2021/34] | HU | 23.12.2014 | |
AL | 26.06.2019 | ||
AT | 26.06.2019 | ||
CY | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
MC | 26.06.2019 | ||
MT | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
GB | 23.12.2019 | ||
IE | 23.12.2019 | ||
LU | 23.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
FR | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2021/32] | HU | 23.12.2014 | |
AL | 26.06.2019 | ||
AT | 26.06.2019 | ||
CY | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
MC | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
GB | 23.12.2019 | ||
IE | 23.12.2019 | ||
LU | 23.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
FR | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2021/26] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CY | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
MC | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
GB | 23.12.2019 | ||
IE | 23.12.2019 | ||
LU | 23.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
FR | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2020/51] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
MC | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
GB | 23.12.2019 | ||
IE | 23.12.2019 | ||
LU | 23.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
FR | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2020/48] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
MC | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
GB | 23.12.2019 | ||
IE | 23.12.2019 | ||
LU | 23.12.2019 | ||
FR | 31.12.2019 | ||
Former [2020/46] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
MC | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
IE | 23.12.2019 | ||
LU | 23.12.2019 | ||
Former [2020/39] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
MC | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
Former [2020/37] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SI | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
Former [2020/36] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
Former [2020/24] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
PL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
PT | 28.10.2019 | ||
IS | 24.02.2020 | ||
Former [2020/22] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
DK | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
Former [2020/17] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
TR | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
Former [2020/13] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SK | 26.06.2019 | ||
SM | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
Former [2020/12] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
IT | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SK | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
IS | 26.10.2019 | ||
PT | 28.10.2019 | ||
Former [2020/11] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
EE | 26.06.2019 | ||
ES | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
SK | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
PT | 28.10.2019 | ||
Former [2020/10] | AL | 26.06.2019 | |
AT | 26.06.2019 | ||
CZ | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RO | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
PT | 28.10.2019 | ||
Former [2020/09] | AL | 26.06.2019 | |
CZ | 26.06.2019 | ||
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
Former [2020/07] | AL | 26.06.2019 | |
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
NL | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
Former [2019/51] | AL | 26.06.2019 | |
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
BG | 26.09.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
Former [2019/50] | AL | 26.06.2019 | |
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
LT | 26.06.2019 | ||
LV | 26.06.2019 | ||
RS | 26.06.2019 | ||
SE | 26.06.2019 | ||
NO | 26.09.2019 | ||
GR | 27.09.2019 | ||
Former [2019/49] | AL | 26.06.2019 | |
FI | 26.06.2019 | ||
HR | 26.06.2019 | ||
LT | 26.06.2019 | ||
SE | 26.06.2019 | ||
NO | 26.09.2019 | ||
Former [2019/48] | FI | 26.06.2019 | |
LT | 26.06.2019 | ||
SE | 26.06.2019 | ||
NO | 26.09.2019 | ||
Former [2019/47] | FI | 26.06.2019 | |
LT | 26.06.2019 | ||
NO | 26.09.2019 | Documents cited: | Search | [XI] - MEDIATEK INC, "Discussion on PRACH and RACH procedure in coverage enhancement mode", vol. RAN WG1, no. San Francisco, USA; 20131111 - 20131115, (20131113), 3GPP DRAFT; R1-135424 DISCUSSION ON PRACH AND RACH PROCEDURE IN COVERAGE ENHANCEMENT MODE_F, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOP, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN/RAN1/Docs/, (20131113), XP050735102 [X] 1-4,6,7,10,11 * section 1 * * section 2.1, proposal #1 * * section 2.2, proposal #2 * * section 4 * [I] 5,8,9,12 | [XI] - HUAWEI ET AL, "Considerations on the random access of MTC UEs with coverage improvement", vol. RAN WG1, no. San Francisco, USA; 20131111 - 20131115, (20131113), 3GPP DRAFT; R1-135020, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN/RAN1/Docs/, (20131113), XP050734723 [X] 1-4,7,8,10,11 * section 1 * * figure 1 * * section 2.2.2, option 1 * * section 3 * [I] 5,6,9,12 | International search | [A]US2012099543 (YANG MI JEONG [KR], et al); | [X] - SHARP, "Discussion on PRACH coverage enhancement for MTC UE", 3GPP TSG RAN WG1 MEETING #75,R1-135342, SAN FRANCISCO, USA, (20131102), XP050750927 | [Y] - MEDIATEK INC., "Coverage report during random access and PRACH formats/configurations", 3GPP TSG-RAN WG1 #74B,R1-134442, GUANGZHOU, P. R. CHINA, (20130928), XP050717559 | [A] - HUAWEI ET AL., "Determining the repetition level during initial random access and non-initial random access", 3GPP TSG RAN WG1 MEETING #75,R1-135382, SAN FRANCISCO, USA, (20131101), XP050750625 | [A] - SHARP, "PRACH coverage enhancement for MTC UE", 3GPP TSG RAN WG1 MEETING #74BIS,R1-134472, GUANGZHOU, CHINA, (20130928), XP050717584 |