EP3092415 - PANELS COMPRISING A MECHANICAL LOCKING DEVICE AND AN ASSEMBLED PRODUCT COMPRISING THE PANELS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.07.2020 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 05.07.2019 | ||
Former | Grant of patent is intended Status updated on 31.03.2019 | ||
Former | Examination is in progress Status updated on 29.06.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Välinge Innovation AB Prästavägen 513 263 65 Viken / SE | [2019/32] |
Former [2016/46] | For all designated states Välinge Innovation AB Prästavägen 513 263 65 Viken / SE | Inventor(s) | 01 /
DERELÖV, Peter Lärkvägen 4A 252 84 Helsingborg / SE | [2019/32] |
Former [2016/46] | 01 /
DERELÖV, Peter Lärkvägen 4A S-252 84 Helsingborg / SE | Representative(s) | HGF HGF BV Benoordenhoutseweg 46 2596 BC The Hague / NL | [N/P] |
Former [2019/32] | HGF B.V. Zuid-Hollandlaan 7 2596 AL Den Haag / NL | ||
Former [2016/46] | Engstrand, Ola Välinge Innovation AB Patent Department Prästavägen 513 263 65 Viken / SE | Application number, filing date | 14877862.4 | 17.12.2014 | [2016/46] | WO2014SE51521 | Priority number, date | SE20140050022 | 10.01.2014 Original published format: SE 1450022 | [2016/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015105449 | Date: | 16.07.2015 | Language: | EN | [2015/28] | Type: | A1 Application with search report | No.: | EP3092415 | Date: | 16.11.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.07.2015 takes the place of the publication of the European patent application. | [2016/46] | Type: | B1 Patent specification | No.: | EP3092415 | Date: | 07.08.2019 | Language: | EN | [2019/32] | Search report(s) | International search report - published on: | SE | 16.07.2015 | (Supplementary) European search report - dispatched on: | EP | 19.05.2017 | Classification | IPC: | F16B12/10, A47B47/00, F16B12/46, A47B47/04, A47B88/90, F16B12/24 | [2017/25] | CPC: |
F16B12/24 (EP,KR);
A47B47/042 (EP,KR);
F16B12/46 (EP,KR);
A47B2088/902 (EP,KR)
|
Former IPC [2016/46] | F16B12/10, A47B47/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/46] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | PLATTEN MIT MECHANISCHER VERRIEGELUNGSVORRICHTUNG UND MONTIERTES PRODUKT MIT DEN PLATTEN | [2016/46] | English: | PANELS COMPRISING A MECHANICAL LOCKING DEVICE AND AN ASSEMBLED PRODUCT COMPRISING THE PANELS | [2016/46] | French: | PANNEAUX COMPRENANT UN DISPOSITIF DE VERROUILLAGE MÉCANIQUE ET PRODUIT ASSEMBLÉ COMPRENANT CES PANNEAUX | [2019/18] |
Former [2016/46] | PANNEAUX COMPRENANT UN DISPOSITIF DE VERROUILLAGE MECANIQUE ET PRODUIT ASSEMBLE COMPRENANT CES PANNEAUX | Entry into regional phase | 08.07.2016 | National basic fee paid | 08.07.2016 | Search fee paid | 08.07.2016 | Designation fee(s) paid | 08.07.2016 | Examination fee paid | Examination procedure | 08.07.2016 | Examination requested [2016/46] | 12.12.2017 | Amendment by applicant (claims and/or description) | 28.06.2018 | Despatch of a communication from the examining division (Time limit: M04) | 06.11.2018 | Reply to a communication from the examining division | 12.03.2019 | Cancellation of oral proceeding that was planned for 10.04.2019 | 01.04.2019 | Communication of intention to grant the patent | 10.04.2019 | Date of oral proceedings (cancelled) | 27.06.2019 | Fee for grant paid | 27.06.2019 | Fee for publishing/printing paid | 27.06.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | EP19183663.4 / EP3594513 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/32] | Fees paid | Renewal fee | 13.12.2016 | Renewal fee patent year 03 | 12.12.2017 | Renewal fee patent year 04 | 20.12.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.12.2014 | AL | 07.08.2019 | CY | 07.08.2019 | MC | 07.08.2019 | MK | 07.08.2019 | MT | 07.08.2019 | RS | 07.08.2019 | SI | 07.08.2019 | SM | 07.08.2019 | BG | 07.11.2019 | GR | 08.11.2019 | IS | 07.12.2019 | IE | 17.12.2019 | LU | 17.12.2019 | [2022/31] |
Former [2021/34] | HU | 17.12.2014 | |
AL | 07.08.2019 | ||
CY | 07.08.2019 | ||
MC | 07.08.2019 | ||
MT | 07.08.2019 | ||
RS | 07.08.2019 | ||
SI | 07.08.2019 | ||
SM | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
IE | 17.12.2019 | ||
LU | 17.12.2019 | ||
Former [2021/32] | HU | 17.12.2014 | |
AL | 07.08.2019 | ||
CY | 07.08.2019 | ||
MC | 07.08.2019 | ||
RS | 07.08.2019 | ||
SI | 07.08.2019 | ||
SM | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
IE | 17.12.2019 | ||
LU | 17.12.2019 | ||
Former [2021/26] | AL | 07.08.2019 | |
CY | 07.08.2019 | ||
MC | 07.08.2019 | ||
RS | 07.08.2019 | ||
SI | 07.08.2019 | ||
SM | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
IE | 17.12.2019 | ||
LU | 17.12.2019 | ||
Former [2020/46] | AL | 07.08.2019 | |
MC | 07.08.2019 | ||
RS | 07.08.2019 | ||
SI | 07.08.2019 | ||
SM | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
IE | 17.12.2019 | ||
LU | 17.12.2019 | ||
Former [2020/39] | AL | 07.08.2019 | |
MC | 07.08.2019 | ||
RS | 07.08.2019 | ||
SI | 07.08.2019 | ||
SM | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2020/37] | AL | 07.08.2019 | |
RS | 07.08.2019 | ||
SI | 07.08.2019 | ||
SM | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2020/36] | AL | 07.08.2019 | |
RS | 07.08.2019 | ||
SM | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2020/28] | AL | 07.08.2019 | |
RS | 07.08.2019 | ||
SM | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 07.08.2019 | |
RS | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/15] | AL | 07.08.2019 | |
RS | 07.08.2019 | ||
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2020/12] | RS | 07.08.2019 | |
BG | 07.11.2019 | ||
GR | 08.11.2019 | ||
IS | 07.12.2019 | ||
Former [2020/10] | BG | 07.11.2019 | Documents cited: | Search | [X]US2012279161 (HAKANSSON NICLAS [SE], et al) [X] 1-14 * paragraph [0010] - paragraph [0042] * * claims 1-15 ** figures 2c, 2d, 6c * | International search | [A]US5658086 (BROKAW PAUL E [US], et al); | [A]WO2010070605 (UNILIN BVBA [BE], et al); | [A]WO2012154113 (VAELINGE FLOORING TECHNOLOGY AB [SE], et al) |