blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3026515

EP3026515 - PROGRAMMABLE CONTROLLER SYSTEM [Right-click to bookmark this link]
Former [2016/22]PROGRAMMABLE CONTROLLER SYSTEM AND CONTROLLER THEREFOR
[2020/48]
StatusNo opposition filed within time limit
Status updated on  11.02.2022
Database last updated on 22.08.2024
FormerThe patent has been granted
Status updated on  05.03.2021
FormerGrant of patent is intended
Status updated on  12.11.2020
FormerExamination is in progress
Status updated on  13.08.2019
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Fuji Electric Co., Ltd.
1-1 Tanabeshinden
Kawasaki-ku
Kawasaki-shi, Kanagawa 210-9530 / JP
[2016/22]
Inventor(s)01 / YUO, Yukiteru
c/o Fuji Electric Co., Ltd.
1-1 Tanabeshinden
Kawasaki-ku
Kawasaki-shi, Kanagawa 210-9530 / JP
 [2016/22]
Representative(s)MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB
Paul-Heyse-Strasse 29
80336 München / DE
[2016/22]
Application number, filing date14883915.227.02.2014
[2016/22]
WO2014JP54831
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015128981
Date:03.09.2015
Language:JA
[2015/35]
Type: A1 Application with search report 
No.:EP3026515
Date:01.06.2016
Language:EN
[2016/22]
Type: B1 Patent specification 
No.:EP3026515
Date:07.04.2021
Language:EN
[2021/14]
Search report(s)International search report - published on:JP03.09.2015
(Supplementary) European search report - dispatched on:EP20.03.2017
ClassificationIPC:G05B19/05, G05B19/418, G06F13/40, H04J3/06
[2017/16]
CPC:
G05B19/052 (EP,KR); G05B19/4185 (EP); H04J3/0652 (EP);
G05B2219/15126 (EP,KR); Y02P90/02 (EP); Y02P90/80 (EP)
Former IPC [2016/22]G05B19/05
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/22]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:PROGRAMMIERBARES STEUERUNGSSYSTEM[2020/48]
English:PROGRAMMABLE CONTROLLER SYSTEM[2020/48]
French:SYSTÈME D'AUTOMATE PROGRAMMABLE[2020/48]
Former [2016/22]PROGRAMMIERBARES STEUERUNGSSYSTEM UND STEUERUNG DAFÜR
Former [2016/22]PROGRAMMABLE CONTROLLER SYSTEM AND CONTROLLER THEREFOR
Former [2016/22]SYSTÈME D'AUTOMATE PROGRAMMABLE ET AUTOMATE CORRESPONDANT
Entry into regional phase25.02.2016Translation filed 
25.02.2016National basic fee paid 
25.02.2016Search fee paid 
25.02.2016Designation fee(s) paid 
25.02.2016Examination fee paid 
Examination procedure25.02.2016Examination requested  [2016/22]
06.10.2017Amendment by applicant (claims and/or description)
19.08.2019Despatch of a communication from the examining division (Time limit: M04)
27.12.2019Reply to a communication from the examining division
13.11.2020Communication of intention to grant the patent
15.02.2021Fee for grant paid
15.02.2021Fee for publishing/printing paid
15.02.2021Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  19.08.2019
Opposition(s)10.01.2022No opposition filed within time limit [2022/11]
Fees paidRenewal fee
25.02.2016Renewal fee patent year 03
28.02.2017Renewal fee patent year 04
28.02.2018Renewal fee patent year 05
28.02.2019Renewal fee patent year 06
02.03.2020Renewal fee patent year 07
01.03.2021Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.02.2014
AL07.04.2021
AT07.04.2021
CY07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
MK07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
[2024/22]
Former [2024/20]HU27.02.2014
AL07.04.2021
AT07.04.2021
CY07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2024/18]HU27.02.2014
AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/44]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
MC07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/36]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
IT07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/29]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SI07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/26]AL07.04.2021
AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/23]AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/10]AT07.04.2021
CZ07.04.2021
DK07.04.2021
EE07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
PT09.08.2021
IS22.12.2021
Former [2022/09]AT07.04.2021
CZ07.04.2021
DK07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RO07.04.2021
RS07.04.2021
SE07.04.2021
SK07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/08]AT07.04.2021
CZ07.04.2021
DK07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RS07.04.2021
SE07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2022/07]AT07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RS07.04.2021
SE07.04.2021
SM07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/52]AT07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
PL07.04.2021
RS07.04.2021
SE07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/51]AT07.04.2021
ES07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
RS07.04.2021
SE07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
IS07.08.2021
PT09.08.2021
Former [2021/50]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
SE07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
PT09.08.2021
Former [2021/49]AT07.04.2021
FI07.04.2021
HR07.04.2021
LT07.04.2021
LV07.04.2021
NL07.04.2021
SE07.04.2021
BG07.07.2021
NO07.07.2021
GR08.07.2021
Former [2021/47]AT07.04.2021
FI07.04.2021
LT07.04.2021
NL07.04.2021
BG07.07.2021
Former [2021/46]AT07.04.2021
FI07.04.2021
LT07.04.2021
Documents cited:Search[A]US5988846  (FLAMM HEINZ [CH], et al) [A] 1-16* the whole document *;
 [X]US2008195882  (FUEHRER THOMAS [DE], et al) [X] 1-16 * the whole document *;
 [X]US2010049891  (HARTWICH FLORIAN [DE], et al) [X] 13-16 * the whole document *;
 [A]US2011264241  (PETTIGREW WILLIAM ROBERT [US], et al) [A] 1-16 * the whole document *
International search[YA]JPH09135260  (TOYO ELECTRIC MFG CO LTD) [Y] 13 * , paragraphs [0008] to [0009], [0018]; fig. 1 to 2, 7 (Family: none) * [A] 1-12, 14-16;
 [YA]JP2009059373  (CANON KK) [Y] 13 * , paragraphs [0027] to [0030]; fig. 3 (Family: none) * [A] 1-12, 14-16;
 [A]JP2012068856  (FUJI ELECTRIC CO LTD) [A] 1-16* , entire text; all drawings (Family: none) *;
 [A]  - NAOKI NYUI et al., "MICREX-SX SPH3000 MG ' with Built-in High-Speed and Large-Capacity Network", Fuji Electric Journal, (20130930), vol. 86, no. 3, pages 225 - 227, XP008182242 [A] 1-16
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.