EP3142502 - ELECTRICALLY-POWERED HOOKAH [Right-click to bookmark this link] | |||
Former [2017/12] | ELECTRICALLY-POWERED HOOKAH APPARATUS, CAPSULE OF COMBUSTIBLE MATERIAL FOR USE THEREWITH AND METHOD FOR CONTROL THEREOF | ||
[2019/26] | Status | No opposition filed within time limit Status updated on 09.10.2020 Database last updated on 25.12.2024 | |
Former | The patent has been granted Status updated on 01.11.2019 | ||
Former | Grant of patent is intended Status updated on 16.06.2019 | ||
Former | Request for examination was made Status updated on 17.02.2017 | ||
Former | The international publication has been made Status updated on 09.12.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states AF Development Holding Limited Unit S317, Level 3 Emirates Financial Towers, Dubai International Financial Centre Dubai 79947 / AE | [2020/10] |
Former [2019/49] | For all designated states Kanben Services Inc. 62 11e Avenue Montréal, Québec H8Y 2P6 / CA | ||
Former [2017/12] | For all designated states Kanben Services Inc. 62 11e Avenue Montréal, Québec H8Y 2P6 / CA | Inventor(s) | 01 /
BENJAMIGNAN, Alexandre 62 11e avenue Roxboro, Québec H8Y 2P6 / CA | 02 /
KANAWATI, Elie 4562 Monaco Pierrefonds, Québec H9J 1J6 / CA | [2017/12] | Representative(s) | Adamson Jones Park View House 58 The Ropewalk Nottingham NG1 5DW / GB | [N/P] |
Former [2019/49] | Hocking, Adrian Niall Albright IP Limited County House Bayshill Road Cheltenham, Glos. GL50 3BA / GB | ||
Former [2017/12] | Lavoix Bayerstrasse 83 80335 München / DE | Application number, filing date | 14892091.1 | 11.12.2014 | [2017/12] | WO2014CA51198 | Priority number, date | US201461991728P | 12.05.2014 Original published format: US 201461991728 P | [2017/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015172224 | Date: | 19.11.2015 | Language: | EN | [2015/46] | Type: | A1 Application with search report | No.: | EP3142502 | Date: | 22.03.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.11.2015 takes the place of the publication of the European patent application. | [2017/12] | Type: | B1 Patent specification | No.: | EP3142502 | Date: | 04.12.2019 | Language: | EN | [2019/49] | Search report(s) | International search report - published on: | CA | 19.11.2015 | (Supplementary) European search report - dispatched on: | EP | 25.01.2018 | Classification | IPC: | A24F1/30, B23P17/00, A24F47/00, H01M10/42, H01M10/48, H05B1/02 | [2018/09] | CPC: |
A24F1/30 (EP,US);
H01M10/425 (US);
H01M10/486 (EP,US);
H05B1/0244 (US);
A24F40/40 (US);
H01M2220/30 (US);
|
Former IPC [2017/12] | A24F1/30, B23P17/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ELEKTRISCH BETRIEBENE WASSERPFEIFE | [2019/26] | English: | ELECTRICALLY-POWERED HOOKAH | [2019/26] | French: | HOUKA À ALIMENTATION ÉLECTRIQUE | [2019/26] |
Former [2017/12] | ELEKTRISCH BETRIEBENEN WASSERPFEIFENVORRICHTUNG, KAPSEL MIT BRENNBAREM MATERIAL ZUR VERWENDUNG DAMIT UND VERFAHREN ZUR STEUERUNG DAVON | ||
Former [2017/12] | ELECTRICALLY-POWERED HOOKAH APPARATUS, CAPSULE OF COMBUSTIBLE MATERIAL FOR USE THEREWITH AND METHOD FOR CONTROL THEREOF | ||
Former [2017/12] | APPAREIL HOUKA À ALIMENTATION ÉLECTRIQUE, CAPSULE DE MATÉRIAU COMBUSTIBLE DESTINÉE À ÊTRE UTILISÉE AVEC LEDIT APPAREIL ET PROCÉDÉ DE COMMANDE ASSOCIÉ | Entry into regional phase | 08.12.2016 | National basic fee paid | 08.12.2016 | Search fee paid | 08.12.2016 | Designation fee(s) paid | 08.12.2016 | Examination fee paid | Examination procedure | 08.12.2016 | Examination requested [2017/12] | 08.12.2016 | Date on which the examining division has become responsible | 01.10.2018 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 03.12.2018 | Amendment by applicant (claims and/or description) | 17.06.2019 | Communication of intention to grant the patent | 24.10.2019 | Fee for grant paid | 24.10.2019 | Fee for publishing/printing paid | 24.10.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 07.09.2020 | No opposition filed within time limit [2020/46] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 03.12.2018 | Request for further processing filed | 03.12.2018 | Full payment received (date of receipt of payment) Request granted | 13.12.2018 | Decision despatched | The application is deemed to be withdrawn due to failure to indicate the wish to proceed further with the application | 03.12.2018 | Request for further processing filed | 03.12.2018 | Full payment received (date of receipt of payment) Request granted | 13.12.2018 | Decision despatched | Fees paid | Renewal fee | 08.12.2016 | Renewal fee patent year 03 | 28.12.2017 | Renewal fee patent year 04 | 14.12.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.12.2014 | AL | 04.12.2019 | AT | 04.12.2019 | CY | 04.12.2019 | CZ | 04.12.2019 | DK | 04.12.2019 | EE | 04.12.2019 | FI | 04.12.2019 | HR | 04.12.2019 | IT | 04.12.2019 | LT | 04.12.2019 | LV | 04.12.2019 | MC | 04.12.2019 | MK | 04.12.2019 | MT | 04.12.2019 | NL | 04.12.2019 | RO | 04.12.2019 | RS | 04.12.2019 | SE | 04.12.2019 | SI | 04.12.2019 | SK | 04.12.2019 | SM | 04.12.2019 | IE | 11.12.2019 | LU | 11.12.2019 | BE | 31.12.2019 | CH | 31.12.2019 | LI | 31.12.2019 | BG | 04.03.2020 | NO | 04.03.2020 | GR | 05.03.2020 | IS | 04.04.2020 | PT | 29.04.2020 | [2022/31] |
Former [2021/34] | HU | 11.12.2014 | |
AL | 04.12.2019 | ||
AT | 04.12.2019 | ||
CY | 04.12.2019 | ||
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
MT | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 11.12.2019 | ||
LU | 11.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2021/32] | HU | 11.12.2014 | |
AL | 04.12.2019 | ||
AT | 04.12.2019 | ||
CY | 04.12.2019 | ||
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 11.12.2019 | ||
LU | 11.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2021/26] | AL | 04.12.2019 | |
AT | 04.12.2019 | ||
CY | 04.12.2019 | ||
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 11.12.2019 | ||
LU | 11.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2021/10] | AL | 04.12.2019 | |
AT | 04.12.2019 | ||
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 11.12.2019 | ||
LU | 11.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/51] | AL | 04.12.2019 | |
AT | 04.12.2019 | ||
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 11.12.2019 | ||
LU | 11.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/47] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 11.12.2019 | ||
LU | 11.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/46] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 11.12.2019 | ||
LU | 11.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/45] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/40] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/37] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
PT | 29.04.2020 | ||
Former [2020/36] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
PT | 29.04.2020 | ||
Former [2020/35] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/32] | AL | 04.12.2019 | |
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/26] | FI | 04.12.2019 | |
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/23] | FI | 04.12.2019 | |
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/22] | FI | 04.12.2019 | |
LT | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
Former [2020/21] | NO | 04.03.2020 | Documents cited: | Search | [IAY]US3918464 (KOLODZIEJ KENNETH W); | [Y]US2006086364 (LIU CHUN-LIANG [TW]); | [A]US2010126516 (YOMTOV AMIR [US], et al); | [A]US2010263681 (ZHAO LUBIN [US]) | International search | [Y]US3918464 (KOLODZIEJ KENNETH W); | [A]US2006086364 (LIU CHUN-LIANG [TW]); | [Y]US2008060663 (HAMADE BASSAM [US], et al); | [Y]CA2599199 (AL DHEFAF FOR TOBACCO & MOLASS [JO]); | [A]US2009084391 (KRUPP TRENT [US]); | [Y]CN201336930Y (HEJIAN YAN [CN]); | [A]EP2292108 (NOUVELLE GENERAL TRADING & CONTRACTING CO W L L [KW]); | [A]CN202276825U (SHIMIN CHEN); | [A]WO2014012216 (SHENZHEN KANGER TECHNOLOGY CO LTD [CN], et al); | [Y]US2014069446 (HADDAD FIRAS F [US]); | [A]RU142147U |