EP3171563 - FBMC SIGNAL TRANSMISSION METHOD, RECEIVING METHOD, TRANSMITTER AND RECEIVER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.09.2019 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 05.10.2018 | ||
Former | Grant of patent is intended Status updated on 23.05.2018 | ||
Former | Request for examination was made Status updated on 21.04.2017 | ||
Former | The international publication has been made Status updated on 15.02.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2017/21] | Inventor(s) | 01 /
QU, Daiming Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 02 /
JIANG, Tao Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 03 /
LI, Jun Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 04 /
CHEN, Lei Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2017/21] | Representative(s) | Goddar, Heinz J. Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | [2018/45] |
Former [2017/21] | Goddar, Heinz J. Boehmert & Boehmert Anwaltspartnerschaft mbB Patentanwälte Rechtsanwälte Pettenkoferstrasse 20-22 80336 München / DE | Application number, filing date | 14899710.9 | 13.08.2014 | [2017/21] | WO2014CN84289 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016023194 | Date: | 18.02.2016 | Language: | ZH | [2016/07] | Type: | A1 Application with search report | No.: | EP3171563 | Date: | 24.05.2017 | Language: | EN | [2017/21] | Type: | B1 Patent specification | No.: | EP3171563 | Date: | 07.11.2018 | Language: | EN | [2018/45] | Search report(s) | International search report - published on: | CN | 18.02.2016 | (Supplementary) European search report - dispatched on: | EP | 28.06.2017 | Classification | IPC: | H04L27/26, H04L27/34, H04L27/36, H04B1/12 | [2017/30] | CPC: |
H04L27/2698 (EP,KR,US);
H04L27/26416 (EP,KR,RU,US);
H04B1/123 (US);
H04L27/26025 (KR);
H04L27/2627 (US);
H04L27/2654 (EP,RU,US);
H04L27/34 (EP,KR,US);
H04L27/362 (US);
H04L27/365 (US);
H04L27/366 (US)
(-)
|
Former IPC [2017/21] | H04L27/34 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/21] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | FBMC-SIGNAL-ÜBERTRAGUNGSVERFAHREN, EMPFANGSVERFAHREN, SENDER UND EMPFÄNGER | [2017/21] | English: | FBMC SIGNAL TRANSMISSION METHOD, RECEIVING METHOD, TRANSMITTER AND RECEIVER | [2017/21] | French: | RÉCEPTEUR, TRANSMETTEUR, PROCÉDÉ DE RÉCEPTION ET PROCÉDÉ DE TRANSMISSION DE SIGNAL FBMC | [2017/21] | Entry into regional phase | 15.02.2017 | Translation filed | 15.02.2017 | National basic fee paid | 15.02.2017 | Search fee paid | 15.02.2017 | Designation fee(s) paid | 15.02.2017 | Examination fee paid | Examination procedure | 15.02.2017 | Amendment by applicant (claims and/or description) | 15.02.2017 | Examination requested [2017/21] | 15.02.2017 | Date on which the examining division has become responsible | 24.05.2018 | Communication of intention to grant the patent | 24.08.2018 | Fee for grant paid | 24.08.2018 | Fee for publishing/printing paid | 01.10.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 08.08.2019 | No opposition filed within time limit [2019/42] | Fees paid | Renewal fee | 15.02.2017 | Renewal fee patent year 03 | 22.08.2017 | Renewal fee patent year 04 | 13.08.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.08.2014 | AL | 07.11.2018 | AT | 07.11.2018 | CY | 07.11.2018 | CZ | 07.11.2018 | DK | 07.11.2018 | EE | 07.11.2018 | ES | 07.11.2018 | FI | 07.11.2018 | HR | 07.11.2018 | IT | 07.11.2018 | LT | 07.11.2018 | LV | 07.11.2018 | MC | 07.11.2018 | MK | 07.11.2018 | MT | 07.11.2018 | NL | 07.11.2018 | PL | 07.11.2018 | RO | 07.11.2018 | RS | 07.11.2018 | SE | 07.11.2018 | SI | 07.11.2018 | SK | 07.11.2018 | SM | 07.11.2018 | TR | 07.11.2018 | BG | 07.02.2019 | NO | 07.02.2019 | GR | 08.02.2019 | IS | 07.03.2019 | PT | 07.03.2019 | [2022/31] |
Former [2021/34] | HU | 13.08.2014 | |
AL | 07.11.2018 | ||
AT | 07.11.2018 | ||
CY | 07.11.2018 | ||
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
MT | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
RS | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
SM | 07.11.2018 | ||
TR | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2021/33] | HU | 13.08.2014 | |
AL | 07.11.2018 | ||
AT | 07.11.2018 | ||
CY | 07.11.2018 | ||
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
RS | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
SM | 07.11.2018 | ||
TR | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2021/26] | AL | 07.11.2018 | |
AT | 07.11.2018 | ||
CY | 07.11.2018 | ||
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
RS | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
SM | 07.11.2018 | ||
TR | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2020/25] | AL | 07.11.2018 | |
AT | 07.11.2018 | ||
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
RS | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
SM | 07.11.2018 | ||
TR | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2020/17] | AL | 07.11.2018 | |
AT | 07.11.2018 | ||
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
RS | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
SM | 07.11.2018 | ||
TR | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/50] | AL | 07.11.2018 | |
AT | 07.11.2018 | ||
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
RS | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
SM | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/40] | AL | 07.11.2018 | |
AT | 07.11.2018 | ||
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
RS | 07.11.2018 | ||
SE | 07.11.2018 | ||
SK | 07.11.2018 | ||
SM | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/37] | AL | 07.11.2018 | |
AT | 07.11.2018 | ||
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
RS | 07.11.2018 | ||
SE | 07.11.2018 | ||
SM | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/35] | AL | 07.11.2018 | |
AT | 07.11.2018 | ||
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RS | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/34] | AL | 07.11.2018 | |
AT | 07.11.2018 | ||
DK | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
RS | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/26] | AL | 07.11.2018 | |
AT | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
RS | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/25] | AT | 07.11.2018 | |
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
RS | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/24] | AT | 07.11.2018 | |
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/23] | AT | 07.11.2018 | |
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/22] | FI | 07.11.2018 | |
LT | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/21] | FI | 07.11.2018 | |
LT | 07.11.2018 | ||
NO | 07.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/20] | LT | 07.11.2018 | |
NO | 07.02.2019 | Documents cited: | Search | [A] - SCHELLMANN MALTE ET AL, "FBMC-based air interface for 5G mobile: Challenges and proposed solutions", 2014 9TH INTERNATIONAL CONFERENCE ON COGNITIVE RADIO ORIENTED WIRELESS NETWORKS AND COMMUNICATIONS (CROWNCOM), ICST, (20140602), doi:10.4108/ICST.CROWNCOM.2014.255708, pages 102 - 107, XP032616104 [A] 1-15 * figures 1, 2 * * sections I-III * DOI: http://dx.doi.org/10.4108/icst.crowncom.2014.255708 | [A] - ZAKARIA R ET AL, "On ISI cancellation in MIMO-ML detection using FBMC/QAM modulation", WIRELESS COMMUNICATION SYSTEMS (ISWCS), 2012 INTERNATIONAL SYMPOSIUM ON, IEEE, (20120828), doi:10.1109/ISWCS.2012.6328508, ISBN 978-1-4673-0761-1, pages 949 - 953, XP032263900 [A] 1-15 * sections I, II * DOI: http://dx.doi.org/10.1109/ISWCS.2012.6328508 | [A] - HOSSEINALI JAMAL ET AL, "Uplink resource allocation for cognitive radio systems: QAM-OFDM or OQAM-OFDM?", TELECOMMUNICATIONS (IST), 2012 SIXTH INTERNATIONAL SYMPOSIUM ON, IEEE, (20121106), doi:10.1109/ISTEL.2012.6482981, ISBN 978-1-4673-2072-6, pages 188 - 193, XP032346057 [A] 1-15 * sections I, II * DOI: http://dx.doi.org/10.1109/ISTEL.2012.6482981 | International search | [A]CN101272371 (SHANGHAI JUSHRI TECHNOLOGIES I [CN]) [A] 1-30 * , description, page 3, lines 4-14 *; | [A]US2011182332 (ERICSON DANIEL WAYNE [US], et al) [A] 1-30* , the whole document *; | [A]CN103825862 (UNIV HUAZHONG SCIENCE TECH) [A] 1-30 * , the whole document *; | [A]CN103888406 (UNIV HUAZHONG SCIENCE TECH) [A] 1-30 * , the whole document * |