| EP3223272 - INFORMATION PROCESSING DEVICE, INFORMATION PROCESSING METHOD, AND INFORMATION PROCESSING PROGRAM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.04.2021 Database last updated on 09.04.2026 | |
| Former | The patent has been granted Status updated on 22.05.2020 | ||
| Former | Grant of patent is intended Status updated on 20.04.2020 | ||
| Former | Examination is in progress Status updated on 10.04.2020 | ||
| Former | Grant of patent is intended Status updated on 23.01.2020 | ||
| Former | Examination is in progress Status updated on 05.10.2018 | ||
| Former | Request for examination was made Status updated on 25.08.2017 | ||
| Former | The international publication has been made Status updated on 18.05.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Rakuten, Inc. 1-14-1, Tamagawa Setagaya-ku Tokyo 158-0094 / JP | [2017/39] | Inventor(s) | 01 /
MASUKO, Soh c/o Rakuten Inc. 4-12-3 Higashishinagawa Shinagawa-ku Tokyo 140-0002 / JP | 02 /
HIRANO, Hiromi c/o Rakuten Inc. 4-12-3 Higashishinagawa Shinagawa-ku Tokyo 140-0002 / JP | 03 /
OGAWA, Naoki c/o THE UNIVERSITY OF ELECTRO-COMMUNICATIONS 1-5-1 Chofugaoka Chofu-shi Tokyo 182-8585 / JP | 04 /
ONAI, Rikio c/o THE UNIVERSITY OF ELECTRO-COMMUNICATIONS 1-5-1 Chofugaoka Chofu-shi Tokyo 182-8585 / JP | 05 /
OKABE, Makoto c/o THE UNIVERSITY OF ELECTRO-COMMUNICATIONS 1-5-1 Chofugaoka Chofu-shi Tokyo 182-8585 / JP | [2017/39] | Representative(s) | EIP Fairfax House 15 Fulwood Place London WC1V 6HU / GB | [N/P] |
| Former [2020/26] | EIP EIP Europe LLP Fairfax House 15 Fulwood Place London WC1V 6HU / GB | ||
| Former [2017/39] | EIP Fairfax House 15 Fulwood Place London WC1V 6HU / GB | Application number, filing date | 14906449.5 | 21.11.2014 | [2017/39] | WO2014JP80932 | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016079868 | Date: | 26.05.2016 | Language: | JA | [2016/21] | Type: | A1 Application with search report | No.: | EP3223272 | Date: | 27.09.2017 | Language: | EN | [2017/39] | Type: | B1 Patent specification | No.: | EP3223272 | Date: | 24.06.2020 | Language: | EN | [2020/26] | Search report(s) | International search report - published on: | JP | 26.05.2016 | (Supplementary) European search report - dispatched on: | EP | 10.01.2018 | Classification | IPC: | G09G5/00, G09G5/26, G09G5/32, G09G5/36, G09G5/377, G09G3/20 | [2017/39] | CPC: |
G09G3/20 (EP,US);
G06T3/403 (US);
G06V20/62 (US);
G06V30/413 (US);
G09G5/00 (EP,US);
G09G5/26 (EP,US);
G09G5/32 (EP,US);
G09G5/36 (EP,US);
G09G5/377 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | INFORMATIONSVERARBEITUNGSVORRICHTUNG, INFORMATIONSVERARBEITUNGSVERFAHREN UND INFORMATIONSVERARBEITUNGSPROGRAMM | [2017/39] | English: | INFORMATION PROCESSING DEVICE, INFORMATION PROCESSING METHOD, AND INFORMATION PROCESSING PROGRAM | [2017/39] | French: | DISPOSITIF, PROCÉDÉ, ET PROGRAMME DE TRAITEMENT D'INFORMATIONS | [2017/39] | Entry into regional phase | 17.05.2017 | Translation filed | 21.06.2017 | National basic fee paid | 21.06.2017 | Search fee paid | 21.06.2017 | Designation fee(s) paid | 21.06.2017 | Examination fee paid | Examination procedure | 17.05.2017 | Date on which the examining division has become responsible | 21.06.2017 | Examination requested [2017/39] | 25.07.2018 | Amendment by applicant (claims and/or description) | 05.10.2018 | Despatch of a communication from the examining division (Time limit: M02) | 12.12.2018 | Reply to a communication from the examining division | 25.11.2019 | Date of oral proceedings | 16.01.2020 | Minutes of oral proceedings despatched | 24.01.2020 | Communication of intention to grant the patent | 07.04.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 07.04.2020 | Fee for grant paid | 07.04.2020 | Fee for publishing/printing paid | 29.04.2020 | Communication of intention to grant the patent | 18.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 25.03.2021 | No opposition filed within time limit [2021/22] | Fees paid | Renewal fee | 21.06.2017 | Renewal fee patent year 03 | 29.11.2017 | Renewal fee patent year 04 | 29.11.2018 | Renewal fee patent year 05 | 28.11.2019 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.11.2014 | AL | 24.06.2020 | AT | 24.06.2020 | CY | 24.06.2020 | CZ | 24.06.2020 | DK | 24.06.2020 | EE | 24.06.2020 | FI | 24.06.2020 | HR | 24.06.2020 | IT | 24.06.2020 | LT | 24.06.2020 | LV | 24.06.2020 | MC | 24.06.2020 | MK | 24.06.2020 | MT | 24.06.2020 | NL | 24.06.2020 | PL | 24.06.2020 | RO | 24.06.2020 | RS | 24.06.2020 | SE | 24.06.2020 | SI | 24.06.2020 | SK | 24.06.2020 | SM | 24.06.2020 | TR | 24.06.2020 | BG | 24.09.2020 | NO | 24.09.2020 | GR | 25.09.2020 | IS | 24.10.2020 | PT | 26.10.2020 | GB | 21.11.2020 | IE | 21.11.2020 | LU | 21.11.2020 | BE | 30.11.2020 | CH | 30.11.2020 | LI | 30.11.2020 | [2022/33] |
| Former [2022/32] | HU | 21.11.2014 | |
| AL | 24.06.2020 | ||
| AT | 24.06.2020 | ||
| CY | 24.06.2020 | ||
| CZ | 24.06.2020 | ||
| DK | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| MK | 24.06.2020 | ||
| MT | 24.06.2020 | ||
| NL | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| SI | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| TR | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| GB | 21.11.2020 | ||
| IE | 21.11.2020 | ||
| LU | 21.11.2020 | ||
| CH | 30.11.2020 | ||
| LI | 30.11.2020 | ||
| Former [2022/27] | HU | 21.11.2014 | |
| AL | 24.06.2020 | ||
| AT | 24.06.2020 | ||
| CY | 24.06.2020 | ||
| CZ | 24.06.2020 | ||
| DK | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| MT | 24.06.2020 | ||
| NL | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| SI | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| TR | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| GB | 21.11.2020 | ||
| IE | 21.11.2020 | ||
| LU | 21.11.2020 | ||
| CH | 30.11.2020 | ||
| LI | 30.11.2020 | ||
| Former [2022/23] | AL | 24.06.2020 | |
| AT | 24.06.2020 | ||
| CZ | 24.06.2020 | ||
| DK | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| NL | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| SI | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| GB | 21.11.2020 | ||
| IE | 21.11.2020 | ||
| LU | 21.11.2020 | ||
| CH | 30.11.2020 | ||
| LI | 30.11.2020 | ||
| Former [2022/10] | AL | 24.06.2020 | |
| AT | 24.06.2020 | ||
| CZ | 24.06.2020 | ||
| DK | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| NL | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| SI | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| PT | 26.10.2020 | ||
| GB | 21.11.2020 | ||
| IE | 21.11.2020 | ||
| LU | 21.11.2020 | ||
| CH | 30.11.2020 | ||
| LI | 30.11.2020 | ||
| Former [2021/49] | AL | 24.06.2020 | |
| AT | 24.06.2020 | ||
| CZ | 24.06.2020 | ||
| DK | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| NL | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| SI | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| GB | 21.11.2020 | ||
| IE | 21.11.2020 | ||
| LU | 21.11.2020 | ||
| CH | 30.11.2020 | ||
| LI | 30.11.2020 | ||
| Former [2021/46] | AL | 24.06.2020 | |
| AT | 24.06.2020 | ||
| CZ | 24.06.2020 | ||
| DK | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| NL | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| SI | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| IE | 21.11.2020 | ||
| LU | 21.11.2020 | ||
| CH | 30.11.2020 | ||
| LI | 30.11.2020 | ||
| Former [2021/37] | AL | 24.06.2020 | |
| AT | 24.06.2020 | ||
| CZ | 24.06.2020 | ||
| DK | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| NL | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| SI | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| LU | 21.11.2020 | ||
| CH | 30.11.2020 | ||
| LI | 30.11.2020 | ||
| Former [2021/36] | AL | 24.06.2020 | |
| AT | 24.06.2020 | ||
| CZ | 24.06.2020 | ||
| DK | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| NL | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| SI | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| LU | 21.11.2020 | ||
| Former [2021/33] | AL | 24.06.2020 | |
| AT | 24.06.2020 | ||
| CZ | 24.06.2020 | ||
| DK | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| NL | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| LU | 21.11.2020 | ||
| Former [2021/31] | AL | 24.06.2020 | |
| AT | 24.06.2020 | ||
| CZ | 24.06.2020 | ||
| DK | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| MC | 24.06.2020 | ||
| NL | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| Former [2021/21] | AL | 24.06.2020 | |
| AT | 24.06.2020 | ||
| CZ | 24.06.2020 | ||
| DK | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| NL | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| Former [2021/10] | AL | 24.06.2020 | |
| AT | 24.06.2020 | ||
| CZ | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| NL | 24.06.2020 | ||
| PL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| SK | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| IS | 24.10.2020 | ||
| PT | 26.10.2020 | ||
| Former [2021/09] | AL | 24.06.2020 | |
| AT | 24.06.2020 | ||
| CZ | 24.06.2020 | ||
| EE | 24.06.2020 | ||
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| IT | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| NL | 24.06.2020 | ||
| RO | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| SM | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| PT | 26.10.2020 | ||
| Former [2021/04] | AL | 24.06.2020 | |
| FI | 24.06.2020 | ||
| HR | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| NL | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| Former [2021/01] | FI | 24.06.2020 | |
| HR | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| BG | 24.09.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| Former [2020/51] | FI | 24.06.2020 | |
| HR | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| RS | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| Former [2020/50] | FI | 24.06.2020 | |
| HR | 24.06.2020 | ||
| LT | 24.06.2020 | ||
| LV | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| NO | 24.09.2020 | ||
| GR | 25.09.2020 | ||
| Former [2020/48] | FI | 24.06.2020 | |
| LT | 24.06.2020 | ||
| SE | 24.06.2020 | ||
| NO | 24.09.2020 | ||
| Former [2020/47] | LT | 24.06.2020 | |
| NO | 24.09.2020 | Documents cited: | Search | [XY] US2007292113 (TSOU MENG-NAN et al.) [X] 1-3,8-10 * paragraph [0001] - paragraph [0031]; figures 1-5 *[Y] 4,5 | [Y] EP2728571 (SAMSUNG ELECTRONICS CO LTD et al.) [Y] 4 * Time sharing display between different content by alternately displaying first and second content / image - quasi-continuous display - see Fig. 8-11 . This is alternative to dividing display and displaying both truely continuously as shown in Fig. 7. Application is transparent display but applies to any display.; paragraph [0074] - paragraph [0090]; figures 8-10 * | [Y] EP1600939 (FUJITSU LTD et al.) [Y] 5 * paragraphs [0017] , [0057] * | International search | [A] JP2012226476 (SHARP KK et al.) [A] 1-9 * , entire text; fig. 1 to 25 & CN 102752618 A * | [A] JP2012073397 (GEO TECHNICAL LAB CO LTD et al.) [A] 1-9 * , entire text; fig. 1 to 15 (Family: none) * | [A] JP2011137908 (SEIKO EPSON CORP et al.) [A] 1-9 * , entire text; fig. 1 to 15 (Family: none) * | [A] JP2005159850 (SEIKO EPSON CORP et al.) [A] 1-9 * , entire text; fig. 1 to 4 (Family: none) * | [A] JP2000295527 (MATSUSHITA ELECTRIC INDUSTRIAL CO LTD et al.) [A] 1-9 * , entire text; fig. 1 to 31 (Family: none) * | [A] JPH11219242 (HITACHI LTD et al.) [A] 1-9 * , entire text; fig. 1 to 7 (Family: none) * | [A] JPH10224709 (TOSHIBA CORP et al.) [A] 1-9 * , entire text; fig. 1 to 20 (Family: none) * |