EP3229417 - SDN AND CONFIGURATION METHOD THEREFOR, SDN-BASED DATA TRANSMISSION METHOD AND NETWORK CONTROLLER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.10.2020 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 01.11.2019 | ||
Former | Grant of patent is intended Status updated on 15.08.2019 | ||
Former | Examination is in progress Status updated on 21.12.2018 | ||
Former | Request for examination was made Status updated on 08.09.2017 | ||
Former | The international publication has been made Status updated on 05.07.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2017/41] | Inventor(s) | 01 /
ZHANG, Jinfang Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 02 /
ZHANG, Wei Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2017/41] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2017/41] | Application number, filing date | 14909324.7 | 29.12.2014 | [2017/41] | WO2014CN95368 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016106511 | Date: | 07.07.2016 | Language: | ZH | [2016/27] | Type: | A1 Application with search report | No.: | EP3229417 | Date: | 11.10.2017 | Language: | EN | [2017/41] | Type: | B1 Patent specification | No.: | EP3229417 | Date: | 04.12.2019 | Language: | EN | [2019/49] | Search report(s) | International search report - published on: | CN | 07.07.2016 | (Supplementary) European search report - dispatched on: | EP | 07.12.2017 | Classification | IPC: | H04L12/70, H04L12/715, H04L12/24, H04L29/06, H04L29/08, // H04L12/811, H04L12/851, H04L12/721 | [2018/02] | CPC: |
H04L45/38 (EP,US);
H04L47/41 (KR);
H04L69/04 (US);
H04L41/0803 (US);
H04L41/20 (US);
H04L45/64 (EP,US);
H04L47/2441 (EP,US);
H04L47/365 (KR);
H04L69/22 (KR);
|
Former IPC [2017/41] | H04L12/70 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/41] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SDN UND KONFIGURATIONSVERFAHREN DAFÜR, SDN-BASIERTES DATENÜBERTRAGUNGSVERFAHREN UND NETZWERKSTEUERGERÄT | [2017/41] | English: | SDN AND CONFIGURATION METHOD THEREFOR, SDN-BASED DATA TRANSMISSION METHOD AND NETWORK CONTROLLER | [2017/41] | French: | SDN ET SON PROCÉDÉ DE CONFIGURATION, PROCÉDÉ DE TRANSMISSION DE DONNÉES BASÉ SUR LE SDN ET ORGANE DE COMMANDE DE RÉSEAU | [2017/41] | Entry into regional phase | 03.07.2017 | Translation filed | 03.07.2017 | National basic fee paid | 03.07.2017 | Search fee paid | 03.07.2017 | Designation fee(s) paid | 03.07.2017 | Examination fee paid | Examination procedure | 03.07.2017 | Examination requested [2017/41] | 03.07.2017 | Date on which the examining division has become responsible | 05.06.2018 | Amendment by applicant (claims and/or description) | 20.12.2018 | Despatch of a communication from the examining division (Time limit: M04) | 25.02.2019 | Reply to a communication from the examining division | 16.08.2019 | Communication of intention to grant the patent | 24.10.2019 | Fee for grant paid | 24.10.2019 | Fee for publishing/printing paid | 24.10.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 07.09.2020 | No opposition filed within time limit [2020/46] | Fees paid | Renewal fee | 03.07.2017 | Renewal fee patent year 03 | 01.01.2018 | Renewal fee patent year 04 | 31.12.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.12.2014 | AL | 04.12.2019 | AT | 04.12.2019 | CY | 04.12.2019 | CZ | 04.12.2019 | DK | 04.12.2019 | EE | 04.12.2019 | ES | 04.12.2019 | FI | 04.12.2019 | HR | 04.12.2019 | IT | 04.12.2019 | LT | 04.12.2019 | LV | 04.12.2019 | MC | 04.12.2019 | MK | 04.12.2019 | MT | 04.12.2019 | NL | 04.12.2019 | PL | 04.12.2019 | RO | 04.12.2019 | RS | 04.12.2019 | SE | 04.12.2019 | SI | 04.12.2019 | SK | 04.12.2019 | SM | 04.12.2019 | TR | 04.12.2019 | IE | 29.12.2019 | LU | 29.12.2019 | BE | 31.12.2019 | CH | 31.12.2019 | LI | 31.12.2019 | FR | 04.02.2020 | BG | 04.03.2020 | NO | 04.03.2020 | GR | 05.03.2020 | IS | 04.04.2020 | PT | 29.04.2020 | [2022/31] |
Former [2022/27] | HU | 29.12.2014 | |
AL | 04.12.2019 | ||
AT | 04.12.2019 | ||
CY | 04.12.2019 | ||
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
MT | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
TR | 04.12.2019 | ||
IE | 29.12.2019 | ||
LU | 29.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
FR | 04.02.2020 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2021/34] | HU | 29.12.2014 | |
AL | 04.12.2019 | ||
AT | 04.12.2019 | ||
CY | 04.12.2019 | ||
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
MT | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 29.12.2019 | ||
LU | 29.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
FR | 04.02.2020 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2021/32] | HU | 29.12.2014 | |
AL | 04.12.2019 | ||
AT | 04.12.2019 | ||
CY | 04.12.2019 | ||
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 29.12.2019 | ||
LU | 29.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
FR | 04.02.2020 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2021/26] | AL | 04.12.2019 | |
AT | 04.12.2019 | ||
CY | 04.12.2019 | ||
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 29.12.2019 | ||
LU | 29.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
FR | 04.02.2020 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2021/10] | AL | 04.12.2019 | |
AT | 04.12.2019 | ||
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 29.12.2019 | ||
LU | 29.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
FR | 04.02.2020 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/51] | AL | 04.12.2019 | |
AT | 04.12.2019 | ||
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 29.12.2019 | ||
LU | 29.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
FR | 04.02.2020 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/49] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 29.12.2019 | ||
LU | 29.12.2019 | ||
FR | 04.02.2020 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/47] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 29.12.2019 | ||
LU | 29.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/46] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
IE | 29.12.2019 | ||
LU | 29.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/45] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/40] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/37] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
PT | 29.04.2020 | ||
Former [2020/36] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
PT | 29.04.2020 | ||
Former [2020/35] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/34] | AL | 04.12.2019 | |
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/32] | AL | 04.12.2019 | |
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/26] | FI | 04.12.2019 | |
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/23] | FI | 04.12.2019 | |
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/22] | FI | 04.12.2019 | |
LT | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
Former [2020/21] | NO | 04.03.2020 | Documents cited: | Search | [I]US2014169158 (MISHRA RAMESH [US], et al) [I] 1-15 * paragraph [0005]; figure 2 * * paragraph [0048] - paragraph [0049] * * paragraph [0029] - paragraph [0030] * * paragraph [0055]; figures 4A, 4B * * paragraph [0007] * * paragraph [0026] *; | [A] - DE POORTER E ET AL, "Non-intrusive aggregation in wireless sensor networks", AD HOC NETWORKS, ELSEVIER, AMSTERDAM, NL, vol. 9, no. 3, doi:10.1016/J.ADHOC.2010.07.017, ISSN 1570-8705, (20110501), pages 324 - 340, (20100810), XP027596326 [A] 1-15 * chapter 7; page 339, column 1 * * chapter 2.1 * * chapter 2.4; page 327, column 1; figure 2 * DOI: http://dx.doi.org/10.1016/j.adhoc.2010.07.017 | International search | [A]CN1938962 (UNIV SINGAPORE [SG]) [A] 1-41 * , the whole document *; | [A]CN101159893 (HUAWEI TECH CO LTD [CN]) [A] 1-41* the whole document *; | [A]CN101897156 (ERICSSON TELEFON AB L M) [A] 1-41 * , the whole document *; | [A]CN102461195 (VUBITES INDIA PRIVATE LTD) [A] 1-41 * , the whole document *; | [A]CN103634076 (SHANGHAI ELECTRICAL APPARATUS RES INST, et al) [A] 1-41 * , the whole document * | Examination | WO2014155617 | US2016014237 |