blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2905841

EP2905841 - Device for connecting a main superconducting cable to a plurality of superconducting cables [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.10.2017
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  18.11.2016
FormerGrant of patent is intended
Status updated on  11.11.2016
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
Nexans
4, Allée de l'Arche
92400 Courbevoie / FR
[2017/30]
Former [2015/33]For all designated states
Nexans
8, rue du Général Foy
75008 Paris / FR
Inventor(s)01 / Lallouet, Nicolas
98 Les Fontinettes
La barrière du Bois
62132 Fiennes / FR
 [2015/33]
Representative(s)Gauer, Pierre, et al
Ipsilon
Le Centralis
63, avenue du Général Leclerc
92340 Bourg-la-Reine / FR
[2016/51]
Former [2015/33]Gauer, Pierre, et al
Ipsilon Feray Lenne Conseil
Le Centralis
63, Avenue du Général Leclerc
92340 Bourg-la-Reine / FR
Application number, filing date15150315.807.01.2015
[2015/33]
Priority number, dateFR2014005086905.02.2014         Original published format: FR 1450869
[2015/33]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP2905841
Date:12.08.2015
Language:FR
[2015/33]
Type: B1 Patent specification 
No.:EP2905841
Date:21.12.2016
Language:FR
[2016/51]
Search report(s)(Supplementary) European search report - dispatched on:EP04.03.2015
ClassificationIPC:H01R4/68, H02G15/34
[2015/33]
CPC:
H01R4/68 (EP); H02G15/34 (EP); Y02E40/60 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/12]
Former [2015/33]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Gerät zum Anschliessen von einem supraleitendem Hauptkabel zu einer Mehrzahl von supraleitenden Kabeln[2015/33]
English:Device for connecting a main superconducting cable to a plurality of superconducting cables[2015/33]
French:Dispositif de connexion d'un cable supraconducteur principal à une pluralité de câbles supraconducteurs secondaires[2015/33]
Examination procedure12.02.2016Examination requested  [2016/12]
11.08.2016Communication of intention to grant the patent
09.11.2016Fee for grant paid
09.11.2016Fee for publishing/printing paid
09.11.2016Receipt of the translation of the claim(s)
Opposition(s)22.09.2017No opposition filed within time limit [2017/48]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.01.2015
AL21.12.2016
AT21.12.2016
CY21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
MK21.12.2016
MT21.12.2016
NL21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SI21.12.2016
SK21.12.2016
SM21.12.2016
TR21.12.2016
IE07.01.2017
LU07.01.2017
BE31.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
[2020/34]
Former [2020/15]HU07.01.2015
AT21.12.2016
CY21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
MK21.12.2016
MT21.12.2016
NL21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SI21.12.2016
SK21.12.2016
SM21.12.2016
TR21.12.2016
IE07.01.2017
LU07.01.2017
BE31.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2019/52]HU07.01.2015
AT21.12.2016
CY21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
MK21.12.2016
MT21.12.2016
NL21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SI21.12.2016
SK21.12.2016
SM21.12.2016
IE07.01.2017
LU07.01.2017
BE31.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2019/47]HU07.01.2015
AT21.12.2016
CY21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
MT21.12.2016
NL21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SI21.12.2016
SK21.12.2016
SM21.12.2016
IE07.01.2017
LU07.01.2017
BE31.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2019/31]HU07.01.2015
AT21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
MT21.12.2016
NL21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SI21.12.2016
SK21.12.2016
SM21.12.2016
IE07.01.2017
LU07.01.2017
BE31.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2018/43]AT21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
MT21.12.2016
NL21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SI21.12.2016
SK21.12.2016
SM21.12.2016
IE07.01.2017
LU07.01.2017
BE31.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2018/13]AT21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
NL21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SI21.12.2016
SK21.12.2016
SM21.12.2016
IE07.01.2017
LU07.01.2017
BE31.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2018/01]AT21.12.2016
CZ21.12.2016
DK21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
NL21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SK21.12.2016
SM21.12.2016
LU07.01.2017
BE31.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2017/42]AT21.12.2016
CZ21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
MC21.12.2016
NL21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SK21.12.2016
SM21.12.2016
BE31.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2017/41]AT21.12.2016
CZ21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
NL21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SK21.12.2016
SM21.12.2016
BE31.01.2017
BG21.03.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
PT21.04.2017
Former [2017/37]AT21.12.2016
CZ21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
IT21.12.2016
LT21.12.2016
LV21.12.2016
NL21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SK21.12.2016
SM21.12.2016
BE31.01.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
Former [2017/36]CZ21.12.2016
EE21.12.2016
ES21.12.2016
FI21.12.2016
HR21.12.2016
LT21.12.2016
LV21.12.2016
NL21.12.2016
PL21.12.2016
RO21.12.2016
RS21.12.2016
SE21.12.2016
SK21.12.2016
BE31.01.2017
NO21.03.2017
GR22.03.2017
IS21.04.2017
Former [2017/34]CZ21.12.2016
FI21.12.2016
HR21.12.2016
LT21.12.2016
LV21.12.2016
NL21.12.2016
RS21.12.2016
SE21.12.2016
BE31.01.2017
NO21.03.2017
GR22.03.2017
Former [2017/31]FI21.12.2016
HR21.12.2016
LT21.12.2016
LV21.12.2016
NL21.12.2016
RS21.12.2016
SE21.12.2016
BE31.01.2017
NO21.03.2017
GR22.03.2017
Former [2017/28]FI21.12.2016
HR21.12.2016
LT21.12.2016
LV21.12.2016
RS21.12.2016
SE21.12.2016
BE31.01.2017
NO21.03.2017
GR22.03.2017
Former [2017/12]LV21.12.2016
Documents cited:Search[A]EP1560292  (SUMITOMO ELECTRIC INDUSTRIES [JP], et al) [A] 1-9 * paragraph [0038] - paragraph [0054]; figures 1,3,4 *;
 [A]JP2011193607  (SUMITOMO ELECTRIC INDUSTRIES) [A] 1-9 * abstract *;
 [A]EP2523290  (NEXANS [FR]) [A] 1-9 * paragraph [0017] - paragraph [0028]; figures 1,2,3,4 *;
 [T]EP2830160  (NEXANS [FR]) [T] * paragraphs [0001] , [0011] - paragraph [0021]; figures 1-3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.