EP3064885 - Gas powered gun with velocity regulator [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.11.2018 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 24.11.2017 | ||
Former | Grant of patent is intended Status updated on 20.07.2017 | ||
Former | Request for examination was made Status updated on 10.03.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states FX Airguns AB Västerängsvägen 10 542 35 Mariestad / SE | [2016/36] | Inventor(s) | 01 /
Axelsson, Fredrik Rösslingen Bygget 1 542 93 Mariestad / SE | [2016/36] | Representative(s) | AWA Sweden AB P.O. Box 11394 404 28 Göteborg / SE | [N/P] |
Former [2016/36] | Awapatent AB P.O. Box 11394 404 28 Göteborg / SE | Application number, filing date | 15157145.2 | 02.03.2015 | [2016/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3064885 | Date: | 07.09.2016 | Language: | EN | [2016/36] | Type: | B1 Patent specification | No.: | EP3064885 | Date: | 27.12.2017 | Language: | EN | [2017/52] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 27.08.2015 | Classification | IPC: | F41B11/723, // F41B11/62 | [2016/36] | CPC: |
F41B11/723 (EP,US);
F41B11/62 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/15] |
Former [2016/36] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Gaswaffe mit Geschwindigkeitsregler | [2016/36] | English: | Gas powered gun with velocity regulator | [2016/36] | French: | Arme à gaz avec régulateur de vitesse | [2016/36] | Examination procedure | 02.03.2015 | Date on which the examining division has become responsible | 01.03.2017 | Examination requested [2017/15] | 21.07.2017 | Communication of intention to grant the patent | 16.11.2017 | Fee for grant paid | 16.11.2017 | Fee for publishing/printing paid | 16.11.2017 | Receipt of the translation of the claim(s) | Opposition(s) | 28.09.2018 | No opposition filed within time limit [2018/49] | Fees paid | Renewal fee | 17.02.2017 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.03.2015 | AL | 27.12.2017 | AT | 27.12.2017 | CY | 27.12.2017 | CZ | 27.12.2017 | DK | 27.12.2017 | EE | 27.12.2017 | ES | 27.12.2017 | FI | 27.12.2017 | HR | 27.12.2017 | IT | 27.12.2017 | LT | 27.12.2017 | LV | 27.12.2017 | MC | 27.12.2017 | MK | 27.12.2017 | NL | 27.12.2017 | PL | 27.12.2017 | PT | 27.12.2017 | RO | 27.12.2017 | RS | 27.12.2017 | SI | 27.12.2017 | SK | 27.12.2017 | SM | 27.12.2017 | TR | 27.12.2017 | IE | 02.03.2018 | LU | 02.03.2018 | MT | 02.03.2018 | BG | 27.03.2018 | NO | 27.03.2018 | GR | 28.03.2018 | BE | 31.03.2018 | CH | 31.03.2018 | LI | 31.03.2018 | IS | 27.04.2018 | [2020/34] |
Former [2020/31] | HU | 02.03.2015 | |
AT | 27.12.2017 | ||
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
MK | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
IE | 02.03.2018 | ||
LU | 02.03.2018 | ||
MT | 02.03.2018 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
BE | 31.03.2018 | ||
CH | 31.03.2018 | ||
LI | 31.03.2018 | ||
IS | 27.04.2018 | ||
Former [2020/30] | HU | 02.03.2015 | |
AT | 27.12.2017 | ||
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
IE | 02.03.2018 | ||
LU | 02.03.2018 | ||
MT | 02.03.2018 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
BE | 31.03.2018 | ||
CH | 31.03.2018 | ||
LI | 31.03.2018 | ||
IS | 27.04.2018 | ||
Former [2020/28] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
IE | 02.03.2018 | ||
LU | 02.03.2018 | ||
MT | 02.03.2018 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
BE | 31.03.2018 | ||
CH | 31.03.2018 | ||
LI | 31.03.2018 | ||
IS | 27.04.2018 | ||
Former [2020/16] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
IE | 02.03.2018 | ||
LU | 02.03.2018 | ||
MT | 02.03.2018 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
BE | 31.03.2018 | ||
CH | 31.03.2018 | ||
LI | 31.03.2018 | ||
IS | 27.04.2018 | ||
Former [2020/08] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
IE | 02.03.2018 | ||
LU | 02.03.2018 | ||
MT | 02.03.2018 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
BE | 31.03.2018 | ||
CH | 31.03.2018 | ||
LI | 31.03.2018 | ||
IS | 27.04.2018 | ||
Former [2019/12] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
IE | 02.03.2018 | ||
LU | 02.03.2018 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
BE | 31.03.2018 | ||
CH | 31.03.2018 | ||
LI | 31.03.2018 | ||
IS | 27.04.2018 | ||
Former [2019/09] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
IE | 02.03.2018 | ||
LU | 02.03.2018 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2019/04] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
LU | 02.03.2018 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/52] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/51] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/40] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/39] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/38] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/37] | CY | 27.12.2017 | |
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/34] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
RS | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/25] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
RS | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/23] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
RS | 27.12.2017 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/22] | FI | 27.12.2017 | |
LT | 27.12.2017 | ||
NO | 27.03.2018 | Documents cited: | Search | [A]US2003106545 (VERINI NICHOLAS A [US]) [A] 1-10 * paragraphs [0050] - [0054]; figures 8, 8A *; | [A]DE202006018601U (UMAREX GMBH & CO KG [DE]) [A] 1-10 * paragraph [0112]; figures 5-8 *; | [A]DE20214533U (J G ANSCHUETZ GMBH & CO KG [DE]) [A] 1-10 * page 2; figure 4 * |