| EP3072742 - INTERIOR AIRCRAFT LED LIGHT UNIT AND METHOD OF CALIBRATING AN INTERIOR AIRCRAFT LED LIGHT UNIT [Right-click to bookmark this link] | |||
| Former [2016/39] | Interior Aircraft LED Light Unit and Method of Calibrating an Interior Aircraft LED Light Unit | ||
| [2019/42] | Status | No opposition filed within time limit Status updated on 22.01.2021 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 14.02.2020 | ||
| Former | Grant of patent is intended Status updated on 19.09.2019 | ||
| Former | Examination is in progress Status updated on 19.10.2018 | ||
| Former | Request for examination was made Status updated on 07.04.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Goodrich Lighting Systems GmbH Bertramstrasse 8 59557 Lippstadt / DE | [2016/39] | Inventor(s) | 01 /
Schoen, Christian An der Wildbachbrücke 1 55124 Mainz / DE | 02 /
Voelkel, Stefan Gartenstrasse 24 57271 Hilchenbach / DE | [2016/39] | Representative(s) | Schmitt-Nilson Schraud Waibel Wohlfrom Patentanwälte Partnerschaft mbB Pelkovenstraße 143 80992 München / DE | [2020/12] |
| Former [2016/39] | Klunker . Schmitt-Nilson . Hirsch Patentanwälte Destouchesstraße 68 80796 München / DE | Application number, filing date | 15161048.2 | 26.03.2015 | [2016/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3072742 | Date: | 28.09.2016 | Language: | EN | [2016/39] | Type: | B1 Patent specification | No.: | EP3072742 | Date: | 18.03.2020 | Language: | EN | [2020/12] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.09.2015 | Classification | IPC: | B60Q3/20, B64D11/00, // F21Y115/10 | [2019/37] | CPC: |
G09F13/044 (EP,US);
B64D11/00 (US);
B60Q3/43 (EP,US);
B60Q3/44 (EP,US);
B60Q3/46 (EP,US);
F21V3/049 (US);
G01M11/0285 (US);
G09F13/04 (EP,US);
H10H20/84 (US);
B64D2011/0038 (EP,US);
B64D2011/0053 (EP,US);
B64D2045/007 (EP,US);
B64D2203/00 (EP,US);
F21Y2115/10 (EP,US);
G09F2013/05 (EP,US);
G09F2013/222 (EP,US)
(-)
|
| Former IPC [2016/39] | B60Q3/02, B64D11/00, F21Y115/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/19] |
| Former [2016/39] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | FLUGZEUGINNENRAUM-LED-BELEUCHTUNGSEINHEIT UND VERFAHREN ZUR KALIBRIERUNG EINER FLUGZEUGINNENRAUM-LED-BELEUCHTUNGSEINHEIT | [2016/39] | English: | INTERIOR AIRCRAFT LED LIGHT UNIT AND METHOD OF CALIBRATING AN INTERIOR AIRCRAFT LED LIGHT UNIT | [2019/42] | French: | UNITÉ D'ÉCLAIRAGE À DEL INTÉRIEURE D'AÉRONEF ET PROCÉDÉ D'ÉTALONNAGE D'UNE TELLE UNITÉ | [2016/39] |
| Former [2016/39] | Interior Aircraft LED Light Unit and Method of Calibrating an Interior Aircraft LED Light Unit | Examination procedure | 26.03.2015 | Date on which the examining division has become responsible | 28.03.2017 | Amendment by applicant (claims and/or description) | 28.03.2017 | Examination requested [2017/19] | 23.10.2018 | Despatch of a communication from the examining division (Time limit: M06) | 02.05.2019 | Reply to a communication from the examining division | 20.09.2019 | Communication of intention to grant the patent | 27.01.2020 | Fee for grant paid | 27.01.2020 | Fee for publishing/printing paid | 29.01.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 21.12.2020 | No opposition filed within time limit [2021/08] | Fees paid | Renewal fee | 23.03.2017 | Renewal fee patent year 03 | 23.03.2018 | Renewal fee patent year 04 | 22.03.2019 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.03.2015 | AL | 18.03.2020 | AT | 18.03.2020 | CY | 18.03.2020 | CZ | 18.03.2020 | DK | 18.03.2020 | EE | 18.03.2020 | ES | 18.03.2020 | FI | 18.03.2020 | HR | 18.03.2020 | IT | 18.03.2020 | LT | 18.03.2020 | LV | 18.03.2020 | MC | 18.03.2020 | MK | 18.03.2020 | MT | 18.03.2020 | NL | 18.03.2020 | PL | 18.03.2020 | RO | 18.03.2020 | RS | 18.03.2020 | SE | 18.03.2020 | SI | 18.03.2020 | SK | 18.03.2020 | SM | 18.03.2020 | TR | 18.03.2020 | IE | 26.03.2020 | LU | 26.03.2020 | BE | 31.03.2020 | CH | 31.03.2020 | LI | 31.03.2020 | BG | 18.06.2020 | NO | 18.06.2020 | GR | 19.06.2020 | IS | 18.07.2020 | PT | 12.08.2020 | [2022/31] |
| Former [2022/30] | HU | 26.03.2015 | |
| AL | 18.03.2020 | ||
| AT | 18.03.2020 | ||
| CY | 18.03.2020 | ||
| CZ | 18.03.2020 | ||
| DK | 18.03.2020 | ||
| EE | 18.03.2020 | ||
| ES | 18.03.2020 | ||
| FI | 18.03.2020 | ||
| HR | 18.03.2020 | ||
| IT | 18.03.2020 | ||
| LT | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| MC | 18.03.2020 | ||
| MT | 18.03.2020 | ||
| NL | 18.03.2020 | ||
| PL | 18.03.2020 | ||
| RO | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| SI | 18.03.2020 | ||
| SK | 18.03.2020 | ||
| SM | 18.03.2020 | ||
| TR | 18.03.2020 | ||
| IE | 26.03.2020 | ||
| LU | 26.03.2020 | ||
| BE | 31.03.2020 | ||
| CH | 31.03.2020 | ||
| LI | 31.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| IS | 18.07.2020 | ||
| PT | 12.08.2020 | ||
| Former [2022/27] | HU | 26.03.2015 | |
| AT | 18.03.2020 | ||
| CY | 18.03.2020 | ||
| CZ | 18.03.2020 | ||
| DK | 18.03.2020 | ||
| EE | 18.03.2020 | ||
| ES | 18.03.2020 | ||
| FI | 18.03.2020 | ||
| HR | 18.03.2020 | ||
| IT | 18.03.2020 | ||
| LT | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| MC | 18.03.2020 | ||
| MT | 18.03.2020 | ||
| NL | 18.03.2020 | ||
| PL | 18.03.2020 | ||
| RO | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| SI | 18.03.2020 | ||
| SK | 18.03.2020 | ||
| SM | 18.03.2020 | ||
| TR | 18.03.2020 | ||
| IE | 26.03.2020 | ||
| LU | 26.03.2020 | ||
| BE | 31.03.2020 | ||
| CH | 31.03.2020 | ||
| LI | 31.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| IS | 18.07.2020 | ||
| PT | 12.08.2020 | ||
| Former [2021/24] | AT | 18.03.2020 | |
| CZ | 18.03.2020 | ||
| DK | 18.03.2020 | ||
| EE | 18.03.2020 | ||
| ES | 18.03.2020 | ||
| FI | 18.03.2020 | ||
| HR | 18.03.2020 | ||
| IT | 18.03.2020 | ||
| LT | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| MC | 18.03.2020 | ||
| NL | 18.03.2020 | ||
| PL | 18.03.2020 | ||
| RO | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| SI | 18.03.2020 | ||
| SK | 18.03.2020 | ||
| SM | 18.03.2020 | ||
| IE | 26.03.2020 | ||
| LU | 26.03.2020 | ||
| BE | 31.03.2020 | ||
| CH | 31.03.2020 | ||
| LI | 31.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| IS | 18.07.2020 | ||
| PT | 12.08.2020 | ||
| Former [2021/10] | AT | 18.03.2020 | |
| CZ | 18.03.2020 | ||
| DK | 18.03.2020 | ||
| EE | 18.03.2020 | ||
| ES | 18.03.2020 | ||
| FI | 18.03.2020 | ||
| HR | 18.03.2020 | ||
| IT | 18.03.2020 | ||
| LT | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| MC | 18.03.2020 | ||
| NL | 18.03.2020 | ||
| PL | 18.03.2020 | ||
| RO | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| SK | 18.03.2020 | ||
| SM | 18.03.2020 | ||
| IE | 26.03.2020 | ||
| LU | 26.03.2020 | ||
| BE | 31.03.2020 | ||
| CH | 31.03.2020 | ||
| LI | 31.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| IS | 18.07.2020 | ||
| PT | 12.08.2020 | ||
| Former [2021/09] | AT | 18.03.2020 | |
| CZ | 18.03.2020 | ||
| DK | 18.03.2020 | ||
| EE | 18.03.2020 | ||
| ES | 18.03.2020 | ||
| FI | 18.03.2020 | ||
| HR | 18.03.2020 | ||
| IT | 18.03.2020 | ||
| LT | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| MC | 18.03.2020 | ||
| NL | 18.03.2020 | ||
| RO | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| SK | 18.03.2020 | ||
| SM | 18.03.2020 | ||
| IE | 26.03.2020 | ||
| LU | 26.03.2020 | ||
| CH | 31.03.2020 | ||
| LI | 31.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| IS | 18.07.2020 | ||
| PT | 12.08.2020 | ||
| Former [2021/08] | CZ | 18.03.2020 | |
| DK | 18.03.2020 | ||
| EE | 18.03.2020 | ||
| ES | 18.03.2020 | ||
| FI | 18.03.2020 | ||
| HR | 18.03.2020 | ||
| LT | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| MC | 18.03.2020 | ||
| NL | 18.03.2020 | ||
| RO | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| SK | 18.03.2020 | ||
| SM | 18.03.2020 | ||
| IE | 26.03.2020 | ||
| LU | 26.03.2020 | ||
| CH | 31.03.2020 | ||
| LI | 31.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| IS | 18.07.2020 | ||
| PT | 12.08.2020 | ||
| Former [2021/07] | CZ | 18.03.2020 | |
| DK | 18.03.2020 | ||
| EE | 18.03.2020 | ||
| FI | 18.03.2020 | ||
| HR | 18.03.2020 | ||
| LT | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| MC | 18.03.2020 | ||
| NL | 18.03.2020 | ||
| RO | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| SK | 18.03.2020 | ||
| SM | 18.03.2020 | ||
| IE | 26.03.2020 | ||
| LU | 26.03.2020 | ||
| CH | 31.03.2020 | ||
| LI | 31.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| IS | 18.07.2020 | ||
| PT | 12.08.2020 | ||
| Former [2021/04] | CZ | 18.03.2020 | |
| EE | 18.03.2020 | ||
| FI | 18.03.2020 | ||
| HR | 18.03.2020 | ||
| LT | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| MC | 18.03.2020 | ||
| NL | 18.03.2020 | ||
| RO | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| SK | 18.03.2020 | ||
| SM | 18.03.2020 | ||
| LU | 26.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| IS | 18.07.2020 | ||
| PT | 12.08.2020 | ||
| Former [2020/50] | CZ | 18.03.2020 | |
| EE | 18.03.2020 | ||
| FI | 18.03.2020 | ||
| HR | 18.03.2020 | ||
| LT | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| NL | 18.03.2020 | ||
| RO | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| SK | 18.03.2020 | ||
| SM | 18.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| IS | 18.07.2020 | ||
| PT | 12.08.2020 | ||
| Former [2020/49] | CZ | 18.03.2020 | |
| FI | 18.03.2020 | ||
| HR | 18.03.2020 | ||
| LT | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| NL | 18.03.2020 | ||
| RO | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| SK | 18.03.2020 | ||
| SM | 18.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| IS | 18.07.2020 | ||
| PT | 12.08.2020 | ||
| Former [2020/48] | FI | 18.03.2020 | |
| HR | 18.03.2020 | ||
| LT | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| NL | 18.03.2020 | ||
| RO | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| SM | 18.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| IS | 18.07.2020 | ||
| PT | 12.08.2020 | ||
| Former [2020/47] | FI | 18.03.2020 | |
| HR | 18.03.2020 | ||
| LT | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| NL | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| IS | 18.07.2020 | ||
| Former [2020/46] | FI | 18.03.2020 | |
| HR | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| NL | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| IS | 18.07.2020 | ||
| Former [2020/45] | FI | 18.03.2020 | |
| HR | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| NL | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| Former [2020/39] | FI | 18.03.2020 | |
| HR | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| BG | 18.06.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| Former [2020/38] | FI | 18.03.2020 | |
| HR | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| NO | 18.06.2020 | ||
| GR | 19.06.2020 | ||
| Former [2020/37] | FI | 18.03.2020 | |
| HR | 18.03.2020 | ||
| LV | 18.03.2020 | ||
| RS | 18.03.2020 | ||
| SE | 18.03.2020 | ||
| NO | 18.06.2020 | ||
| Former [2020/35] | FI | 18.03.2020 | |
| NO | 18.06.2020 | Documents cited: | Search | [Y] WO2009059097 (BE AEROSPACE INC et al.) [Y] 1-15 * paragraph [0026] - paragraph [0028] * * figures 3,4 * | [Y] US6623142 (LIPPMANN RAY et al.) [Y] 1-15 * column 2, line 52 - line 59 * * column 3, line 23 - line 30 * * column 4, line 23 - line 65 * * figure 1b * | [A] WO2012167107 (BE AEROSPACE INC et al.) [A] 1-15 * figure 26D * | [A] US2013038241 (JOHANNESSEN ERIC et al.) [A] 1-15 | [A] GB2365108 (DESIGNED ARCHITECTURAL LIGHTIN et al.) [A] 1 * the whole document * | [A] US5282091 (GRABOWSKI GERARD et al.) [A] 1-15 * the whole document * | Examination | WO2014147505 |