blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2937519

EP2937519 - METHOD TO CONTROL ELECTRIC STARTER GENERATOR FOR GAS TURBINE ENGINES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.04.2020
Database last updated on 31.08.2024
FormerThe patent has been granted
Status updated on  10.05.2019
FormerGrant of patent is intended
Status updated on  18.12.2018
FormerExamination is in progress
Status updated on  30.06.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Rolls-Royce Corporation
450 South Meridian Street
Indianapolis, Indiana 46225-1103 / US
For all designated states
Rolls-Royce North American Technologies, Inc.
2059 S. Tibbs Avenue
Indianapolis, IN 46241 / US
[2015/44]
Inventor(s)01 / Smith, Alan W.
1520 Timber Ridge Drive
Columbus, IN 47201 / US
02 / Blackwelder, Mark J.
5705 Yorktown Trace
Plainfield, IN 46168 / US
 [2015/44]
Representative(s)HGF
1 City Walk
Leeds LS11 9DX / GB
[N/P]
Former [2019/24]HGF Limited
1 City Walk
Leeds LS11 9DX / GB
Former [2015/44]HGF Limited
Belgrave Hall
Belgrave Street
Leeds LS2 8DD / GB
Application number, filing date15165098.324.04.2015
[2015/44]
Priority number, dateUS201461984081P25.04.2014         Original published format: US 201461984081 P
[2015/44]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2937519
Date:28.10.2015
Language:EN
[2015/44]
Type: B1 Patent specification 
No.:EP2937519
Date:12.06.2019
Language:EN
[2019/24]
Search report(s)(Supplementary) European search report - dispatched on:EP21.09.2015
ClassificationIPC:F01D15/10, F01D19/02, F01D21/12, F02K3/06, F02C6/14, F02C7/14, F02C7/275, F02C9/28, G05B23/02
[2015/44]
CPC:
F01D15/10 (EP,US); F02C7/26 (US); F01D19/02 (EP,US);
F01D21/12 (EP,US); F02C6/14 (EP,US); F02C7/14 (EP,US);
F02C7/275 (EP,US); F02C9/28 (EP,US); F02K3/06 (EP,US);
G05B23/0232 (EP,US); G05B23/0286 (EP,US); F05D2220/32 (US);
F05D2220/76 (EP,US); F05D2230/72 (EP,US); F05D2260/80 (EP,US);
F05D2260/821 (EP,US); F05D2260/85 (EP,US); F05D2270/112 (EP,US);
F05D2270/303 (EP,US); F05D2270/71 (EP,US); Y02T50/60 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/23]
Former [2015/44]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR ANSTEUERUNG EINES ELEKTRISCHEN STARTERGENERATORS FÜR GASTURBINENMOTOREN[2015/44]
English:METHOD TO CONTROL ELECTRIC STARTER GENERATOR FOR GAS TURBINE ENGINES[2015/44]
French:PROCÉDÉ DE COMMANDE D'UN GÉNÉRATEUR DE DÉMARRAGE ÉLECTRIQUE POUR MOTEURS À TURBINE À GAZ[2015/44]
Examination procedure28.04.2016Amendment by applicant (claims and/or description)
28.04.2016Examination requested  [2016/23]
30.06.2017Despatch of a communication from the examining division (Time limit: M04)
06.11.2017Reply to a communication from the examining division
19.12.2018Communication of intention to grant the patent
28.03.2019Fee for grant paid
28.03.2019Fee for publishing/printing paid
28.03.2019Receipt of the translation of the claim(s)
Opposition(s)13.03.2020No opposition filed within time limit [2020/21]
Fees paidRenewal fee
27.04.2017Renewal fee patent year 03
27.04.2018Renewal fee patent year 04
29.04.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU24.04.2015
AL12.06.2019
AT12.06.2019
CY12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
MK12.06.2019
MT12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
[2022/32]
Former [2022/28]HU24.04.2015
AL12.06.2019
AT12.06.2019
CY12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
MT12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/52]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/36]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/24]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
IS24.02.2020
Former [2020/22]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/17]AL12.06.2019
AT12.06.2019
CZ12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/13]AL12.06.2019
AT12.06.2019
CZ12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/12]AL12.06.2019
AT12.06.2019
CZ12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
IT12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/11]AL12.06.2019
AT12.06.2019
CZ12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
Former [2020/10]AL12.06.2019
AT12.06.2019
CZ12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
Former [2020/09]AL12.06.2019
CZ12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2020/07]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2019/51]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2019/50]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RS12.06.2019
SE12.06.2019
NO12.09.2019
GR13.09.2019
Former [2019/49]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
SE12.06.2019
NO12.09.2019
Former [2019/48]FI12.06.2019
LT12.06.2019
SE12.06.2019
NO12.09.2019
Former [2019/47]FI12.06.2019
LT12.06.2019
NO12.09.2019
Documents cited:Search[A]US5748500  (QUENTIN GEORGE HEINZ [US], et al) [A] 1-11 * figures 1-3 * * column 1, line 5 - line 13 * * column 2, line 45 - line 67 * * column 4, line 52 - line 65 * * column 6, line 13 - line 30 *;
 [A]US6836086  (GOLDBERG GARY LESTER [US], et al) [A] 1-11 * figures 1-2 *;
 [A]US2010107648  (BULIN GUILLAUME [FR], et al) [A] 1-11 * figure 1 ** paragraph [0001] - paragraph [0007] *;
 [XA]US2013204506  (ERTZ TIMOTHY [US], et al) [X] 9 * figure 1 * * paragraph [0005] - paragraph [0006] * * paragraph [0019] * * paragraph [0031] - paragraph [0034] * [A] 1-8,10,11
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.