| EP3089552 - DC LOW VOLTAGE POWER DISTRIBUTION UNIT AND SYSTEM FOR A POWER GRID [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.02.2022 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 26.02.2021 | ||
| Former | Grant of patent is intended Status updated on 09.11.2020 | ||
| Former | Examination is in progress Status updated on 11.07.2019 | ||
| Former | Request for examination was made Status updated on 12.05.2017 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states TE Connectivity Nederland B.V. Rietveldenweg 32 5222 AR 's Hertogenbosch / NL | [2016/44] | Inventor(s) | 01 /
Dendas, Freddy Turfstraat 152 3600 Genk / BE | 02 /
Vermeulen, Mark Schouts Wernertslaan 19 5673 RL Nuenen / NL | [2016/44] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2016/44] | Application number, filing date | 15165574.3 | 29.04.2015 | [2016/44] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3089552 | Date: | 02.11.2016 | Language: | EN | [2016/44] | Type: | B1 Patent specification | No.: | EP3089552 | Date: | 31.03.2021 | Language: | EN | [2021/13] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.11.2015 | Classification | IPC: | H05B45/37 | [2020/48] | CPC: |
H05B45/3725 (EP,US);
H05B45/37 (US);
H05B47/20 (EP);
H05B45/50 (EP,US)
|
| Former IPC [2016/44] | H05B33/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/24] |
| Former [2016/44] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERTEILUNGSEINHEIT UND -SYSTEM VON GLEICHSTROM-NIEDERSPANNUNGS-STROM UND SYSTEM FÜR STROMNETZ | [2016/44] | English: | DC LOW VOLTAGE POWER DISTRIBUTION UNIT AND SYSTEM FOR A POWER GRID | [2016/44] | French: | DISTRIBUTION DE PUISSANCE BASSE TENSION À COURANT CONTINU ET SYSTÈME POUR UN RÉSEAU ÉLECTRIQUE | [2016/44] | Examination procedure | 29.04.2015 | Date on which the examining division has become responsible | 02.05.2017 | Amendment by applicant (claims and/or description) | 02.05.2017 | Examination requested [2017/24] | 15.07.2019 | Despatch of a communication from the examining division (Time limit: M06) | 09.01.2020 | Reply to a communication from the examining division | 20.10.2020 | Cancellation of oral proceeding that was planned for 24.11.2020 | 10.11.2020 | Communication of intention to grant the patent | 24.11.2020 | Date of oral proceedings (cancelled) | 18.02.2021 | Fee for grant paid | 18.02.2021 | Fee for publishing/printing paid | 18.02.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 04.01.2022 | No opposition filed within time limit [2022/10] | Fees paid | Renewal fee | 27.04.2017 | Renewal fee patent year 03 | 11.04.2018 | Renewal fee patent year 04 | 15.04.2019 | Renewal fee patent year 05 | 31.03.2020 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.04.2015 | AL | 31.03.2021 | AT | 31.03.2021 | CY | 31.03.2021 | CZ | 31.03.2021 | DK | 31.03.2021 | EE | 31.03.2021 | ES | 31.03.2021 | FI | 31.03.2021 | GR | 31.03.2021 | HR | 31.03.2021 | IT | 31.03.2021 | LT | 31.03.2021 | LV | 31.03.2021 | MC | 31.03.2021 | MK | 31.03.2021 | MT | 31.03.2021 | NL | 31.03.2021 | PL | 31.03.2021 | RO | 31.03.2021 | RS | 31.03.2021 | SE | 31.03.2021 | SI | 31.03.2021 | SK | 31.03.2021 | SM | 31.03.2021 | TR | 31.03.2021 | IE | 29.04.2021 | LU | 29.04.2021 | BE | 30.04.2021 | CH | 30.04.2021 | LI | 30.04.2021 | BG | 30.06.2021 | NO | 30.06.2021 | IS | 31.07.2021 | PT | 02.08.2021 | [2026/04] |
| Former [2024/41] | HU | 29.04.2015 | |
| AL | 31.03.2021 | ||
| AT | 31.03.2021 | ||
| CY | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| GR | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| IT | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| MK | 31.03.2021 | ||
| MT | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 29.04.2021 | ||
| LU | 29.04.2021 | ||
| BE | 30.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2024/22] | HU | 29.04.2015 | |
| AL | 31.03.2021 | ||
| AT | 31.03.2021 | ||
| CY | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| GR | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| IT | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| MK | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 29.04.2021 | ||
| LU | 29.04.2021 | ||
| BE | 30.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2023/36] | HU | 29.04.2015 | |
| AL | 31.03.2021 | ||
| AT | 31.03.2021 | ||
| CY | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| GR | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| IT | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 29.04.2021 | ||
| LU | 29.04.2021 | ||
| BE | 30.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2023/30] | HU | 29.04.2015 | |
| AL | 31.03.2021 | ||
| AT | 31.03.2021 | ||
| CY | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| IT | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 29.04.2021 | ||
| LU | 29.04.2021 | ||
| BE | 30.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2023/29] | HU | 29.04.2015 | |
| AL | 31.03.2021 | ||
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| IT | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 29.04.2021 | ||
| LU | 29.04.2021 | ||
| BE | 30.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2022/36] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| IT | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 29.04.2021 | ||
| LU | 29.04.2021 | ||
| BE | 30.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2022/34] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 29.04.2021 | ||
| LU | 29.04.2021 | ||
| BE | 30.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2022/29] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SI | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 29.04.2021 | ||
| LU | 29.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2022/23] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 29.04.2021 | ||
| LU | 29.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2022/21] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| IE | 29.04.2021 | ||
| LU | 29.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| PT | 02.08.2021 | ||
| IS | 24.12.2021 | ||
| Former [2022/10] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| LU | 29.04.2021 | ||
| CH | 30.04.2021 | ||
| LI | 30.04.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| PT | 02.08.2021 | ||
| IS | 24.12.2021 | ||
| Former [2022/08] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| DK | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| LU | 29.04.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2022/07] | AL | 31.03.2021 | |
| AT | 31.03.2021 | ||
| CZ | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| MC | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| LU | 29.04.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2022/04] | AT | 31.03.2021 | |
| CZ | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| LU | 29.04.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2021/52] | AT | 31.03.2021 | |
| CZ | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| PL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2021/51] | AT | 31.03.2021 | |
| CZ | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| ES | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| IS | 31.07.2021 | ||
| PT | 02.08.2021 | ||
| Former [2021/50] | AT | 31.03.2021 | |
| CZ | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| RO | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SK | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| PT | 02.08.2021 | ||
| Former [2021/48] | AT | 31.03.2021 | |
| CZ | 31.03.2021 | ||
| EE | 31.03.2021 | ||
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| Former [2021/47] | AT | 31.03.2021 | |
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| NL | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| Former [2021/46] | AT | 31.03.2021 | |
| FI | 31.03.2021 | ||
| HR | 31.03.2021 | ||
| LT | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| SM | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| Former [2021/38] | FI | 31.03.2021 | |
| HR | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| SE | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| Former [2021/37] | FI | 31.03.2021 | |
| HR | 31.03.2021 | ||
| LV | 31.03.2021 | ||
| RS | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| Former [2021/36] | FI | 31.03.2021 | |
| HR | 31.03.2021 | ||
| BG | 30.06.2021 | ||
| NO | 30.06.2021 | ||
| Former [2021/35] | FI | 31.03.2021 | |
| HR | 31.03.2021 | ||
| NO | 30.06.2021 | ||
| Former [2021/33] | FI | 31.03.2021 | |
| NO | 30.06.2021 | Documents cited: | Search | [XYI] US2010244736 (BAXTER COLIN et al.) | [XYI] US2011018464 (LO HONHUNG et al.) | [XY] US2010280676 (PABON GUS CHARLES et al.) | [XYI] CN202941009 (SALICRU ENERGY TECHNOLOGY JIANGSU CO LTD et al.) | [XYI] CN2086003 (LIU XIAOLU et al.) [X] 1-4,8-12 * abstract * * page 1, paragraphs 1, 6-18 * * page 1, paragraph 25 - page 3, paragraph 42 * * page 4, paragraphs 45-51 *[Y] 5-7,14 [I] 13,15 | [XYI] EP2846611 (TRIDONIC GMBH & CO KG et al.) [X] 1-3 * the whole document *[Y] 5-7,14 [I] 4,8-13,15 | Examination | AU2013204215 | by applicant | "UL 1310", 26 August 2011 | "UL1012", 9 November 2010, article "Underwriter Laboratories (UL) Standard Power Units Other Than Class 2" | "UL1310", 26 August 2011, article "Underwriter Laboratories (UL) Standard for Class 2 Power Units" | "UL1310", 26 August 2011 |