EP2942535 - APPARATUS AND METHODS FOR PROVIDING A THREADED FIXING IN A CRUSHABLE OR BRITTLE MATERIAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.04.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 21.05.2021 | ||
Former | Grant of patent is intended Status updated on 09.02.2021 | ||
Former | Examination is in progress Status updated on 27.02.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Avdel UK Limited 3 Europa Court Sheffield Business Park Sheffield S9 1XE / GB | [2021/25] |
Former [2015/46] | For all designated states Avdel UK Limited 3 Europa Court Sheffield Business Park Sheffield S9 1XE / GB | Inventor(s) | 01 /
Brewer, Jonathan Lee Avdel UK Ltd., Technology Department Avdel UK Ltd. 3 Europa Court Sheffield Business Park Shefield, S9 1XE / GB | [2015/46] | Representative(s) | SBD IPAdmin 270 Bath Road Slough, Berkshire SL1 4DX / GB | [2021/25] |
Former [2015/46] | Shaya, Darrin Maurice, et al Black & Decker Europe 210 Bath Road Slough, Berkshire SL1 3YD / GB | Application number, filing date | 15167016.3 | 08.05.2015 | [2015/46] | Priority number, date | GB20140008213 | 09.05.2014 Original published format: GB 201408213 | [2015/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2942535 | Date: | 11.11.2015 | Language: | EN | [2015/46] | Type: | B1 Patent specification | No.: | EP2942535 | Date: | 23.06.2021 | Language: | EN | [2021/25] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.09.2015 | Classification | IPC: | F16B37/12 | [2015/46] | CPC: |
F16B37/12 (EP,US);
F16B39/225 (US);
F16B37/048 (EP,US);
F16B11/006 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/03] |
Former [2015/46] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VORRICHTUNG UND VERFAHREN ZUR BEREITSTELLUNG EINER GEWINDEBEFESTIGUNG IN ZERBRECHLICHEN ODER SPRÖDEN STOFFEN | [2015/46] | English: | APPARATUS AND METHODS FOR PROVIDING A THREADED FIXING IN A CRUSHABLE OR BRITTLE MATERIAL | [2015/46] | French: | APPAREIL ET PROCEDES PERMETTANT DE FOURNIR UNE FIXATION FILETEE OU DANS UN MATERIAU ECRASABLE OU FRAGILE | [2015/46] | Examination procedure | 14.12.2015 | Amendment by applicant (claims and/or description) | 14.12.2015 | Examination requested [2016/03] | 20.04.2016 | Despatch of a communication from the examining division (Time limit: M04) | 01.06.2016 | Reply to a communication from the examining division | 16.02.2017 | Despatch of a communication from the examining division (Time limit: M04) | 08.05.2017 | Reply to a communication from the examining division | 14.12.2017 | Despatch of a communication from the examining division (Time limit: M06) | 12.06.2018 | Reply to a communication from the examining division | 20.07.2018 | Despatch of a communication from the examining division (Time limit: M04) | 06.11.2018 | Reply to a communication from the examining division | 17.12.2019 | Despatch of a communication from the examining division (Time limit: M04) | 13.03.2020 | Reply to a communication from the examining division | 10.02.2021 | Communication of intention to grant the patent | 11.05.2021 | Fee for grant paid | 11.05.2021 | Fee for publishing/printing paid | 11.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 24.03.2022 | No opposition filed within time limit [2022/22] | Fees paid | Renewal fee | 10.05.2017 | Renewal fee patent year 03 | 11.05.2018 | Renewal fee patent year 04 | 15.05.2019 | Renewal fee patent year 05 | 31.03.2020 | Renewal fee patent year 06 | 13.05.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.05.2015 | AL | 23.06.2021 | AT | 23.06.2021 | CY | 23.06.2021 | CZ | 23.06.2021 | DK | 23.06.2021 | EE | 23.06.2021 | ES | 23.06.2021 | FI | 23.06.2021 | HR | 23.06.2021 | IT | 23.06.2021 | LT | 23.06.2021 | LV | 23.06.2021 | MC | 23.06.2021 | MK | 23.06.2021 | MT | 23.06.2021 | NL | 23.06.2021 | PL | 23.06.2021 | RO | 23.06.2021 | RS | 23.06.2021 | SE | 23.06.2021 | SI | 23.06.2021 | SK | 23.06.2021 | SM | 23.06.2021 | TR | 23.06.2021 | BG | 23.09.2021 | NO | 23.09.2021 | GR | 24.09.2021 | IS | 23.10.2021 | PT | 25.10.2021 | [2024/41] |
Former [2024/29] | HU | 08.05.2015 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
MK | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
TR | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2024/22] | HU | 08.05.2015 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
MK | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2024/20] | HU | 08.05.2015 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2024/18] | HU | 08.05.2015 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2023/06] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/36] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
IT | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/29] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/26] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/21] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/10] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
EE | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/09] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
PT | 25.10.2021 | ||
Former [2022/08] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
ES | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2022/07] | AT | 23.06.2021 | |
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
NL | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/51] | FI | 23.06.2021 | |
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/49] | FI | 23.06.2021 | |
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
SE | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/47] | FI | 23.06.2021 | |
LT | 23.06.2021 | ||
BG | 23.09.2021 | ||
Former [2021/46] | FI | 23.06.2021 | |
LT | 23.06.2021 | Documents cited: | Search | [A]EP2584208 (WEBASTO SE [DE]) [A] 1-13* the whole document * | Examination | US2700172 | US2957196 |