blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2960147

EP2960147 - WIRELESS COMMUNICATION SYSTEM AND METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.08.2020
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  13.09.2019
FormerGrant of patent is intended
Status updated on  17.07.2019
FormerExamination is in progress
Status updated on  09.11.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Rolls-Royce plc
Kings Place
90 York Way
London N1 9FX / GB
[2020/09]
Former [2016/01]For all designated states
Rolls-Royce plc
62 Buckingham Gate
London SW1E 6AT / GB
Inventor(s)01 / Edwards, Huw L
c/o Rolls-Royce plc
PO Box 31
Derby, Derbyshire DE24 8BJ / GB
02 / Ong, Max C Y
c/o Rolls-Royce plc
PO Box 31
Derby, Derbyshire DE24 8BJ / GB
03 / Thompson, Haydn A
c/o Rolls-Royce plc
PO Box 31
Derby, Derbyshire DE24 8BJ / GB
 [2016/01]
Representative(s)Rolls-Royce plc
Moor Lane (ML-9)
PO Box 31
Derby DE24 8BJ / GB
[N/P]
Former [2016/01]Rolls-Royce plc
Intellectual Property Dept SinA-48
PO Box 31
Derby DE24 8BJ / GB
Application number, filing date15170707.204.06.2015
[2016/01]
Priority number, dateGB2014001134126.06.2014         Original published format: GB 201411341
[2016/01]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2960147
Date:30.12.2015
Language:EN
[2015/53]
Type: B1 Patent specification 
No.:EP2960147
Date:16.10.2019
Language:EN
[2019/42]
Search report(s)(Supplementary) European search report - dispatched on:EP04.11.2015
ClassificationIPC:B63H5/125, G01B5/00, H04B7/02, H04B7/06, H04B7/12, H04J11/00, H04L1/04
[2016/01]
CPC:
H04B7/02 (EP); H04B1/1081 (US); G01M15/00 (EP,US);
H04L1/04 (EP,US); B63H2005/1256 (EP,US); B63H5/125 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/23]
Former [2016/01]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:DRAHTLOSES KOMMUNIKATIONSSYSTEM UND -VERFAHREN[2016/01]
English:WIRELESS COMMUNICATION SYSTEM AND METHOD[2016/01]
French:SYSTÈME ET PROCÉDÉ DE COMMUNICATION SANS FIL[2016/01]
Examination procedure27.04.2016Amendment by applicant (claims and/or description)
27.04.2016Examination requested  [2016/23]
09.11.2018Despatch of a communication from the examining division (Time limit: M04)
28.02.2019Reply to a communication from the examining division
18.07.2019Communication of intention to grant the patent
05.09.2019Fee for grant paid
05.09.2019Fee for publishing/printing paid
05.09.2019Receipt of the translation of the claim(s)
Opposition(s)17.07.2020No opposition filed within time limit [2020/39]
Fees paidRenewal fee
27.06.2017Renewal fee patent year 03
27.06.2018Renewal fee patent year 04
27.06.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.06.2015
AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MK16.10.2019
MT16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
TR16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
IE04.06.2020
LU04.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
[2022/32]
Former [2022/27]HU04.06.2015
AL16.10.2019
AT16.10.2019
CY16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
MT16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
TR16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
IE04.06.2020
LU04.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
Former [2021/24]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
IE04.06.2020
LU04.06.2020
BE30.06.2020
CH30.06.2020
LI30.06.2020
Former [2021/20]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
IE04.06.2020
LU04.06.2020
CH30.06.2020
LI30.06.2020
Former [2021/15]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
LU04.06.2020
Former [2021/12]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
MC16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/51]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SI16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/38]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
IT16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/37]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
SK16.10.2019
SM16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/36]AL16.10.2019
AT16.10.2019
CZ16.10.2019
DK16.10.2019
EE16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
IS16.02.2020
PT17.02.2020
Former [2020/35]AL16.10.2019
AT16.10.2019
CZ16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RO16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/32]AL16.10.2019
AT16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/25]AT16.10.2019
ES16.10.2019
FI16.10.2019
HR16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
RS16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/24]AT16.10.2019
ES16.10.2019
FI16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
IS24.02.2020
Former [2020/23]AT16.10.2019
ES16.10.2019
FI16.10.2019
LT16.10.2019
LV16.10.2019
NL16.10.2019
PL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
GR17.01.2020
PT17.02.2020
Former [2020/22]FI16.10.2019
LT16.10.2019
NL16.10.2019
SE16.10.2019
BG16.01.2020
NO16.01.2020
PT17.02.2020
Former [2020/21]NL16.10.2019
NO16.01.2020
Former [2020/20]NL16.10.2019
Documents cited:Search[Y]EP1971096  (SAMSUNG ELECTRONICS CO LTD [KR]) [Y] 1-13 * paragraphs [0001] - [0012] * * paragraphs [0053] - [055 ] - [0076] , [0111] *;
 [A]WO2012035948  (MITSUBISHI HEAVY IND LTD [JP], et al) [A] 1 * the whole document *;
 [XA]US2013233368  (DOWBEN PETER [US]) [X] 14,15 * paragraph [0021] *[A] 8-10;
 [Y]EP2720313  (ROLLS ROYCE PLC [GB]) [Y] 1-13 * paragraph [0031] * * paragraph [0034] - paragraph [0035] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.