| EP3108774 - COOKING VESSEL FOR AN OVEN CAVITY OF A COOKING OVEN [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.11.2021 Database last updated on 18.03.2026 | |
| Former | The patent has been granted Status updated on 11.12.2020 | ||
| Former | Grant of patent is intended Status updated on 02.09.2020 | ||
| Former | Examination is in progress Status updated on 16.02.2019 | ||
| Former | Request for examination was made Status updated on 07.07.2017 | ||
| Former | The application has been published Status updated on 25.11.2016 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Electrolux Appliances Aktiebolag S:t Göransgatan 143 105 45 Stockholm / SE | [2016/52] | Inventor(s) | 01 /
FARALDI, Paolo Electrolux Italia S.p.A. - Forli Factory Viale Bologna, 298 47122 Forli / IT | 02 /
FURLANETTO, Riccardo Electrolux Professional S.p.A. Viale Treviso, 15 33170 Pordenone / IT | 03 /
CARNEVALI, Marco Electrolux Italia S.p.A. - Forli Factory Viale Bologna, 298 47122 Forli / IT | [2016/52] | Representative(s) | Electrolux Group Patents AB Electrolux Group Patents S:t Göransgatan 143 105 45 Stockholm / SE | [N/P] |
| Former [2016/52] | Electrolux Group Patents AB Electrolux Group Patents 105 45 Stockholm / SE | Application number, filing date | 15173492.8 | 24.06.2015 | [2016/52] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3108774 | Date: | 28.12.2016 | Language: | EN | [2016/52] | Type: | B1 Patent specification | No.: | EP3108774 | Date: | 13.01.2021 | Language: | EN | [2021/02] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.12.2015 | Classification | IPC: | A47J27/08, A47J27/04, A47J27/16, F24C15/22, F24C15/32 | [2016/52] | CPC: |
A47J27/04 (EP,US);
A23L5/13 (US);
A47J27/08 (EP,US);
A47J27/0802 (US);
A47J27/0804 (EP,US);
A47J27/16 (EP,US);
A47J36/04 (US);
F24C15/327 (EP,US);
A23V2002/00 (US);
A47J2027/043 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/32] |
| Former [2016/52] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | KOCHGEFÄSS FÜR EINEN OFENINNENRAUM EINES BACKOFENS | [2016/52] | English: | COOKING VESSEL FOR AN OVEN CAVITY OF A COOKING OVEN | [2016/52] | French: | RECIPIENT DE CUISSON POUR LA CAVITE D'UN FOUR DE CUISSON | [2016/52] | Examination procedure | 24.06.2015 | Date on which the examining division has become responsible | 13.06.2017 | Amendment by applicant (claims and/or description) | 28.06.2017 | Examination requested [2017/32] | 20.02.2019 | Despatch of a communication from the examining division (Time limit: M06) | 26.07.2019 | Reply to a communication from the examining division | 09.10.2019 | Despatch of a communication from the examining division (Time limit: M04) | 03.02.2020 | Reply to a communication from the examining division | 03.09.2020 | Communication of intention to grant the patent | 02.12.2020 | Fee for grant paid | 02.12.2020 | Fee for publishing/printing paid | 02.12.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 14.10.2021 | No opposition filed within time limit [2021/51] | Fees paid | Renewal fee | 30.06.2017 | Renewal fee patent year 03 | 02.07.2018 | Renewal fee patent year 04 | 01.07.2019 | Renewal fee patent year 05 | 30.06.2020 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.06.2015 | AL | 13.01.2021 | AT | 13.01.2021 | CY | 13.01.2021 | CZ | 13.01.2021 | DK | 13.01.2021 | EE | 13.01.2021 | ES | 13.01.2021 | FI | 13.01.2021 | HR | 13.01.2021 | LT | 13.01.2021 | LV | 13.01.2021 | MC | 13.01.2021 | MK | 13.01.2021 | MT | 13.01.2021 | NL | 13.01.2021 | PL | 13.01.2021 | RO | 13.01.2021 | RS | 13.01.2021 | SE | 13.01.2021 | SI | 13.01.2021 | SK | 13.01.2021 | SM | 13.01.2021 | TR | 13.01.2021 | BG | 13.04.2021 | NO | 13.04.2021 | GR | 14.04.2021 | IS | 13.05.2021 | PT | 13.05.2021 | GB | 24.06.2021 | IE | 24.06.2021 | LU | 24.06.2021 | BE | 30.06.2021 | [2026/04] |
| Former [2024/41] | HU | 24.06.2015 | |
| AL | 13.01.2021 | ||
| AT | 13.01.2021 | ||
| CY | 13.01.2021 | ||
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| ES | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| MC | 13.01.2021 | ||
| MK | 13.01.2021 | ||
| MT | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RO | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SI | 13.01.2021 | ||
| SK | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| IS | 13.05.2021 | ||
| PT | 13.05.2021 | ||
| GB | 24.06.2021 | ||
| IE | 24.06.2021 | ||
| LU | 24.06.2021 | ||
| BE | 30.06.2021 | ||
| Former [2024/22] | HU | 24.06.2015 | |
| AL | 13.01.2021 | ||
| AT | 13.01.2021 | ||
| CY | 13.01.2021 | ||
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| ES | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| MC | 13.01.2021 | ||
| MK | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RO | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SI | 13.01.2021 | ||
| SK | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| IS | 13.05.2021 | ||
| PT | 13.05.2021 | ||
| GB | 24.06.2021 | ||
| IE | 24.06.2021 | ||
| LU | 24.06.2021 | ||
| BE | 30.06.2021 | ||
| Former [2023/30] | HU | 24.06.2015 | |
| AL | 13.01.2021 | ||
| AT | 13.01.2021 | ||
| CY | 13.01.2021 | ||
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| ES | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| MC | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RO | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SI | 13.01.2021 | ||
| SK | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| IS | 13.05.2021 | ||
| PT | 13.05.2021 | ||
| GB | 24.06.2021 | ||
| IE | 24.06.2021 | ||
| LU | 24.06.2021 | ||
| BE | 30.06.2021 | ||
| Former [2023/29] | HU | 24.06.2015 | |
| AL | 13.01.2021 | ||
| AT | 13.01.2021 | ||
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| ES | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| MC | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RO | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SI | 13.01.2021 | ||
| SK | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| IS | 13.05.2021 | ||
| PT | 13.05.2021 | ||
| GB | 24.06.2021 | ||
| IE | 24.06.2021 | ||
| LU | 24.06.2021 | ||
| BE | 30.06.2021 | ||
| Former [2022/34] | AL | 13.01.2021 | |
| AT | 13.01.2021 | ||
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| ES | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| MC | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RO | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SI | 13.01.2021 | ||
| SK | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| IS | 13.05.2021 | ||
| PT | 13.05.2021 | ||
| GB | 24.06.2021 | ||
| IE | 24.06.2021 | ||
| LU | 24.06.2021 | ||
| BE | 30.06.2021 | ||
| Former [2022/23] | AL | 13.01.2021 | |
| AT | 13.01.2021 | ||
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| ES | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| MC | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RO | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SI | 13.01.2021 | ||
| SK | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| IS | 13.05.2021 | ||
| PT | 13.05.2021 | ||
| GB | 24.06.2021 | ||
| IE | 24.06.2021 | ||
| LU | 24.06.2021 | ||
| Former [2022/22] | AL | 13.01.2021 | |
| AT | 13.01.2021 | ||
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| ES | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| MC | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RO | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SI | 13.01.2021 | ||
| SK | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| PT | 13.05.2021 | ||
| GB | 24.06.2021 | ||
| IE | 24.06.2021 | ||
| LU | 24.06.2021 | ||
| Former [2022/21] | AL | 13.01.2021 | |
| AT | 13.01.2021 | ||
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| ES | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| MC | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RO | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SI | 13.01.2021 | ||
| SK | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| PT | 13.05.2021 | ||
| IE | 24.06.2021 | ||
| LU | 24.06.2021 | ||
| Former [2022/18] | AL | 13.01.2021 | |
| AT | 13.01.2021 | ||
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| ES | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| MC | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RO | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SI | 13.01.2021 | ||
| SK | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| PT | 13.05.2021 | ||
| LU | 24.06.2021 | ||
| Former [2022/13] | AL | 13.01.2021 | |
| AT | 13.01.2021 | ||
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| ES | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| MC | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RO | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SI | 13.01.2021 | ||
| SK | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| PT | 13.05.2021 | ||
| Former [2022/10] | AL | 13.01.2021 | |
| AT | 13.01.2021 | ||
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| ES | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| MC | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RO | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SK | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| PT | 13.05.2021 | ||
| Former [2022/07] | AL | 13.01.2021 | |
| AT | 13.01.2021 | ||
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| ES | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| MC | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RO | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SK | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| IS | 13.05.2021 | ||
| PT | 13.05.2021 | ||
| Former [2021/51] | AT | 13.01.2021 | |
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| ES | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RO | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SK | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| IS | 13.05.2021 | ||
| PT | 13.05.2021 | ||
| Former [2021/50] | AT | 13.01.2021 | |
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RO | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SK | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| IS | 13.05.2021 | ||
| PT | 13.05.2021 | ||
| Former [2021/49] | AT | 13.01.2021 | |
| CZ | 13.01.2021 | ||
| DK | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| IS | 13.05.2021 | ||
| PT | 13.05.2021 | ||
| Former [2021/48] | AT | 13.01.2021 | |
| CZ | 13.01.2021 | ||
| EE | 13.01.2021 | ||
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| IS | 13.05.2021 | ||
| PT | 13.05.2021 | ||
| Former [2021/46] | AT | 13.01.2021 | |
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| SM | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| IS | 13.05.2021 | ||
| PT | 13.05.2021 | ||
| Former [2021/42] | AT | 13.01.2021 | |
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| IS | 13.05.2021 | ||
| PT | 13.05.2021 | ||
| Former [2021/39] | AT | 13.01.2021 | |
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| PL | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| PT | 13.05.2021 | ||
| Former [2021/38] | AT | 13.01.2021 | |
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| SE | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| PT | 13.05.2021 | ||
| Former [2021/37] | AT | 13.01.2021 | |
| FI | 13.01.2021 | ||
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| LV | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| RS | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| PT | 13.05.2021 | ||
| Former [2021/36] | FI | 13.01.2021 | |
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| BG | 13.04.2021 | ||
| NO | 13.04.2021 | ||
| GR | 14.04.2021 | ||
| PT | 13.05.2021 | ||
| Former [2021/35] | FI | 13.01.2021 | |
| HR | 13.01.2021 | ||
| LT | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| NO | 13.04.2021 | ||
| PT | 13.05.2021 | ||
| Former [2021/34] | FI | 13.01.2021 | |
| LT | 13.01.2021 | ||
| NL | 13.01.2021 | ||
| NO | 13.04.2021 | ||
| PT | 13.05.2021 | ||
| Former [2021/33] | FI | 13.01.2021 | |
| LT | 13.01.2021 | ||
| NO | 13.04.2021 | ||
| PT | 13.05.2021 | Documents cited: | Search | [A] EP0434047 (MATSUSHITA ELECTRIC INDUSTRIAL CO LTD et al.) [A] 1-15 * figures 2,3 * | [XI] EP2468150 (BSH BOSCH SIEMENS HAUSGERAETE et al.) [X] 1,7,11 * paragraph [0043] - paragraph [0046]; figure 1 *[I] 2-6,8-10,12-15 |