EP2963750 - COVER PART FOR ELECTRICAL INSTALLATION MATERIAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.08.2018 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 15.09.2017 | ||
Former | Grant of patent is intended Status updated on 09.05.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Niko NV Industriepark-West 40 9100 Sint-Niklaas / BE | [2016/01] | Inventor(s) | 01 /
VAN RANST, Jurgen Scaldisstraat 174 9040 Gent / BE | [2016/01] | Representative(s) | D'Halleweyn, Nele Veerle Trees Gertrudis Arnold & Siedsma Bezuidenhoutseweg 57 2594 AC The Hague / NL | [2016/01] | Application number, filing date | 15174106.3 | 26.06.2015 | [2016/01] | Priority number, date | BE20140000499 | 30.06.2014 Original published format: BE 201400499 | [2016/01] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2963750 | Date: | 06.01.2016 | Language: | EN | [2016/01] | Type: | B1 Patent specification | No.: | EP2963750 | Date: | 18.10.2017 | Language: | EN | [2017/42] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.08.2015 | Classification | IPC: | H02G3/14 | [2016/01] | CPC: |
H02G3/14 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/28] |
Former [2016/01] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | DECKELTEIL FÜR ELEKTRISCHES INSTALLATIONSMATERIAL | [2016/01] | English: | COVER PART FOR ELECTRICAL INSTALLATION MATERIAL | [2016/01] | French: | PIECE DE COUVERCLE POUR MATERIAU D'INSTALLATION ELECTRIQUE | [2016/01] | Examination procedure | 02.06.2016 | Amendment by applicant (claims and/or description) | 02.06.2016 | Examination requested [2016/28] | 10.05.2017 | Communication of intention to grant the patent | 06.09.2017 | Fee for grant paid | 06.09.2017 | Fee for publishing/printing paid | 06.09.2017 | Receipt of the translation of the claim(s) | Opposition(s) | 19.07.2018 | No opposition filed within time limit [2018/39] | Fees paid | Renewal fee | 27.06.2017 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 18.10.2017 | AT | 18.10.2017 | CY | 18.10.2017 | EE | 18.10.2017 | ES | 18.10.2017 | FI | 18.10.2017 | HR | 18.10.2017 | IT | 18.10.2017 | LT | 18.10.2017 | LV | 18.10.2017 | MC | 18.10.2017 | MK | 18.10.2017 | PT | 18.10.2017 | RO | 18.10.2017 | RS | 18.10.2017 | SI | 18.10.2017 | SM | 18.10.2017 | TR | 18.10.2017 | BG | 18.01.2018 | GR | 19.01.2018 | IS | 18.02.2018 | IE | 26.06.2018 | LU | 26.06.2018 | MT | 26.06.2018 | [2020/34] |
Former [2020/31] | AT | 18.10.2017 | |
CY | 18.10.2017 | ||
EE | 18.10.2017 | ||
ES | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
IT | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
MC | 18.10.2017 | ||
MK | 18.10.2017 | ||
PT | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SI | 18.10.2017 | ||
SM | 18.10.2017 | ||
TR | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
IE | 26.06.2018 | ||
LU | 26.06.2018 | ||
MT | 26.06.2018 | ||
Former [2020/28] | AT | 18.10.2017 | |
EE | 18.10.2017 | ||
ES | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
IT | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
MC | 18.10.2017 | ||
PT | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SI | 18.10.2017 | ||
SM | 18.10.2017 | ||
TR | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
IE | 26.06.2018 | ||
LU | 26.06.2018 | ||
MT | 26.06.2018 | ||
Former [2020/16] | AT | 18.10.2017 | |
EE | 18.10.2017 | ||
ES | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
IT | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
MC | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SI | 18.10.2017 | ||
SM | 18.10.2017 | ||
TR | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
IE | 26.06.2018 | ||
LU | 26.06.2018 | ||
MT | 26.06.2018 | ||
Former [2020/08] | AT | 18.10.2017 | |
EE | 18.10.2017 | ||
ES | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
IT | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
MC | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SI | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
IE | 26.06.2018 | ||
LU | 26.06.2018 | ||
MT | 26.06.2018 | ||
Former [2019/19] | AT | 18.10.2017 | |
EE | 18.10.2017 | ||
ES | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
IT | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
MC | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SI | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
IE | 26.06.2018 | ||
LU | 26.06.2018 | ||
Former [2019/17] | AT | 18.10.2017 | |
EE | 18.10.2017 | ||
ES | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
IT | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
MC | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SI | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
LU | 26.06.2018 | ||
Former [2019/15] | AT | 18.10.2017 | |
EE | 18.10.2017 | ||
ES | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
IT | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
MC | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SI | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
Former [2018/52] | AT | 18.10.2017 | |
EE | 18.10.2017 | ||
ES | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
IT | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SI | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
Former [2018/40] | AT | 18.10.2017 | |
EE | 18.10.2017 | ||
ES | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
IT | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
RO | 18.10.2017 | ||
RS | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
Former [2018/37] | AT | 18.10.2017 | |
EE | 18.10.2017 | ||
ES | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
RS | 18.10.2017 | ||
SM | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
Former [2018/24] | AT | 18.10.2017 | |
ES | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
LT | 18.10.2017 | ||
LV | 18.10.2017 | ||
RS | 18.10.2017 | ||
BG | 18.01.2018 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
Former [2018/23] | AT | 18.10.2017 | |
ES | 18.10.2017 | ||
FI | 18.10.2017 | ||
HR | 18.10.2017 | ||
LT | 18.10.2017 | ||
RS | 18.10.2017 | ||
GR | 19.01.2018 | ||
IS | 18.02.2018 | ||
Former [2018/22] | ES | 18.10.2017 | |
FI | 18.10.2017 | ||
LT | 18.10.2017 | Documents cited: | Search | [XA]WO2013182819 (LEGRAND FRANCE [FR], et al) [X] 1,2,8,10-15 * the whole document * [A] 3-6; | [X]EP2194626 (LEGRAND FRANCE [FR], et al) [X] 1,3,5,7,8,10-15 * the whole document *; | [X]US3987928 (MORI SHINJIRO) [X] 1,2,5,7,8,10,12-15 * column 2, line 66 - column 3, line 16; figures 1,3,6,7 *; | [A]EP2453541 (JUNG GMBH ALBRECHT [DE]) [A] 1,4,9 * figure 1 * |