EP2977021 - CATHETER WITH MULTIPLE IRRIGATED ELECTRODES AND A FORCE SENSOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.08.2019 Database last updated on 04.11.2024 | |
Former | The patent has been granted Status updated on 21.09.2018 | ||
Former | Grant of patent is intended Status updated on 14.09.2018 | ||
Former | Examination is in progress Status updated on 14.08.2018 | ||
Former | Grant of patent is intended Status updated on 05.04.2018 | ||
Former | Examination is in progress Status updated on 12.01.2018 | ||
Former | Grant of patent is intended Status updated on 12.09.2017 | ||
Former | Examination is in progress Status updated on 10.02.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Biosense Webster (Israel) Ltd. 4 Hatnufa Street 2066717 Yokneam / IL | [2016/04] | Inventor(s) | 01 /
GOVARI, Assaf Vitzo 1 3440001 Haifa / IL | 02 /
BEECKLER, Christopher Thomas 1312 Oakcrest Avenue Brea, CA California 92821 / US | 03 /
HETTEL, Rowan Olund 3535 Shaw Ranch Road Pasadena, CA California 91107 / US | [2016/04] | Representative(s) | Carpmaels & Ransford LLP One Southampton Row London WC1B 5HA / GB | [2016/04] | Application number, filing date | 15177934.5 | 22.07.2015 | [2016/04] | Priority number, date | US201414338018 | 22.07.2014 Original published format: US201414338018 | [2016/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2977021 | Date: | 27.01.2016 | Language: | EN | [2016/04] | Type: | B1 Patent specification | No.: | EP2977021 | Date: | 24.10.2018 | Language: | EN | [2018/43] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.11.2015 | Classification | IPC: | A61B18/14, A61B18/00, A61B90/00 | [2017/32] | CPC: |
A61B18/1492 (EP);
A61B2018/00029 (EP);
A61B2018/1467 (EP);
A61B2090/065 (EP);
A61B2218/002 (EP)
|
Former IPC [2016/04] | A61B18/14, A61B18/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/36] |
Former [2016/04] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | KATHETER MIT MEHREREN BEWÄSSERTEN ELEKTRODEN UND EINEM KRAFTSENSOR | [2016/04] | English: | CATHETER WITH MULTIPLE IRRIGATED ELECTRODES AND A FORCE SENSOR | [2016/04] | French: | CATHETER POURVU DE MULTIPLES ELECTRODES IRRIGUEES ET UN CAPTEUR DE FORCE | [2016/04] | Examination procedure | 27.07.2016 | Amendment by applicant (claims and/or description) | 27.07.2016 | Examination requested [2016/36] | 10.02.2017 | Despatch of a communication from the examining division (Time limit: M04) | 20.06.2017 | Reply to a communication from the examining division | 13.09.2017 | Communication of intention to grant the patent | 09.01.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 05.04.2018 | Communication of intention to grant the patent | 08.08.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 08.08.2018 | Fee for grant paid | 08.08.2018 | Fee for publishing/printing paid | 13.09.2018 | Information about intention to grant a patent | 13.09.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 25.07.2019 | No opposition filed within time limit [2019/40] | Fees paid | Renewal fee | 12.07.2017 | Renewal fee patent year 03 | 11.07.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.07.2015 | AL | 24.10.2018 | AT | 24.10.2018 | CY | 24.10.2018 | CZ | 24.10.2018 | DK | 24.10.2018 | EE | 24.10.2018 | FI | 24.10.2018 | HR | 24.10.2018 | LT | 24.10.2018 | LV | 24.10.2018 | MC | 24.10.2018 | MK | 24.10.2018 | MT | 24.10.2018 | PL | 24.10.2018 | RO | 24.10.2018 | RS | 24.10.2018 | SE | 24.10.2018 | SI | 24.10.2018 | SK | 24.10.2018 | SM | 24.10.2018 | TR | 24.10.2018 | BG | 24.01.2019 | NO | 24.01.2019 | GR | 25.01.2019 | IS | 24.02.2019 | PT | 24.02.2019 | LU | 22.07.2019 | [2022/31] |
Former [2021/34] | HU | 22.07.2015 | |
AL | 24.10.2018 | ||
AT | 24.10.2018 | ||
CY | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
MT | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
TR | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
LU | 22.07.2019 | ||
Former [2021/33] | HU | 22.07.2015 | |
AL | 24.10.2018 | ||
AT | 24.10.2018 | ||
CY | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
TR | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
LU | 22.07.2019 | ||
Former [2021/26] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CY | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
TR | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
LU | 22.07.2019 | ||
Former [2020/27] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
TR | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
LU | 22.07.2019 | ||
Former [2020/17] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
TR | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2020/14] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
MC | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/50] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SI | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/40] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SK | 24.10.2018 | ||
SM | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/37] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
EE | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
PL | 24.10.2018 | ||
RO | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
SM | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/35] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
CZ | 24.10.2018 | ||
DK | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
PL | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/34] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
DK | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
PL | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/26] | AL | 24.10.2018 | |
AT | 24.10.2018 | ||
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
PL | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
PT | 24.02.2019 | ||
Former [2019/25] | AT | 24.10.2018 | |
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
PL | 24.10.2018 | ||
RS | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
Former [2019/24] | AT | 24.10.2018 | |
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
PL | 24.10.2018 | ||
SE | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
GR | 25.01.2019 | ||
IS | 24.02.2019 | ||
Former [2019/23] | AT | 24.10.2018 | |
FI | 24.10.2018 | ||
HR | 24.10.2018 | ||
LT | 24.10.2018 | ||
LV | 24.10.2018 | ||
PL | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
IS | 24.02.2019 | ||
Former [2019/22] | FI | 24.10.2018 | |
LT | 24.10.2018 | ||
PL | 24.10.2018 | ||
BG | 24.01.2019 | ||
NO | 24.01.2019 | ||
IS | 24.02.2019 | ||
Former [2019/21] | FI | 24.10.2018 | |
LT | 24.10.2018 | ||
NO | 24.01.2019 | ||
IS | 24.02.2019 | ||
Former [2019/20] | LT | 24.10.2018 | |
NO | 24.01.2019 | Documents cited: | Search | [A]US2008249522 (PAPPONE CARLO [IT], et al) [A] 1-14* figures 8,9 *; | [Y]EP2550924 (BIOSENSE WEBSTER ISRAEL LTD [IL]) [Y] 1-14 * figures 1-11 * * paragraph [0030] * * paragraph [0038] * * paragraph [0052] * * paragraph [0068] *; | [Y]EP2641555 (BIOSENSE WEBSTER ISRAEL LTD [IL]) [Y] 1-14 * figure 2 *; | [A]EP2740432 (BIOSENSE WEBSTER ISRAEL LTD [IL]) [A] 1-14 * figure 5 * | by applicant | US2009093806 | US2010079158 | US2011130648 |