EP2980547 - VIBRATION MEASUREMENT DEVICE, MEASUREMENT SYSTEM, AND MEASUREMENT METHOD [Right-click to bookmark this link] | |||
Former [2016/05] | VIBRATION PICKUP DEVICE, VIBRATION MEASUREMENT DEVICE, MEASUREMENT SYSTEM, AND MEASUREMENT METHOD | ||
[2020/47] | Status | No opposition filed within time limit Status updated on 11.02.2022 Database last updated on 28.06.2024 | |
Former | The patent has been granted Status updated on 05.03.2021 | ||
Former | Grant of patent is intended Status updated on 22.11.2020 | ||
Former | Examination is in progress Status updated on 10.02.2020 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Kyocera Corporation 6, Takeda Tobadono-cho Fushimi-ku Kyoto-shi Kyoto 612-8501 / JP | [2016/05] | Inventor(s) | 01 /
INAGAKI, Tomohiro c/o Kyocera Corporation Head Office 6, Takeda Tobadono-cho Fushimi-ku Kyoto-shi Kyoto 612-8501 / JP | [2020/52] |
Former [2016/05] | 01 /
INAGAKI, Tomohiro c/o Kyocera Corporation Head Office 6 Takeda Tobadono-cho Fushimi-ku Kyoto-shi Kyoto, 612-8501 / JP | Representative(s) | SSM Sandmair Patentanwälte Rechtsanwalt Partnerschaft mbB Joseph-Wild-Straße 20 81829 München / DE | [2021/14] |
Former [2016/05] | Schwabe - Sandmair - Marx Patentanwälte Stuntzstraße 16 81677 München / DE | Application number, filing date | 15180108.1 | 22.10.2013 | [2016/05] | Priority number, date | JP20120235030 | 24.10.2012 Original published format: JP 2012235030 | JP20130042335 | 04.03.2013 Original published format: JP 2013042335 | JP20130042339 | 04.03.2013 Original published format: JP 2013042339 | [2016/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2980547 | Date: | 03.02.2016 | Language: | EN | [2016/05] | Type: | B1 Patent specification | No.: | EP2980547 | Date: | 07.04.2021 | Language: | EN | [2021/14] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.12.2015 | Classification | IPC: | G01H3/00, G01H17/00, H04R1/46, H04R25/00, H04R29/00 | [2016/05] | CPC: |
H04R29/00 (EP,US);
H04R1/46 (US);
G01H17/00 (EP,US);
H04M1/24 (US);
H04R25/30 (US);
H04R29/001 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/05] | Title | German: | SCHWINGUNGSMESSVORRICHTUNG, MESSSYSTEM UND MESSVERFAHREN | [2020/47] | English: | VIBRATION MEASUREMENT DEVICE, MEASUREMENT SYSTEM, AND MEASUREMENT METHOD | [2020/47] | French: | DISPOSITIF DE MESURE DE VIBRATIONS, SYSTÈME DE MESURE ET PROCÉDÉ DE MESURE | [2020/47] |
Former [2016/05] | SCHWINGUNGSAUFNAHMEVORRICHTUNG, SCHWINGUNGSMESSVORRICHTUNG, MESSSYSTEM UND MESSVERFAHREN | ||
Former [2016/05] | VIBRATION PICKUP DEVICE, VIBRATION MEASUREMENT DEVICE, MEASUREMENT SYSTEM, AND MEASUREMENT METHOD | ||
Former [2016/05] | DISPOSITIF DE CAPTURE DE VIBRATIONS, DISPOSITIF DE MESURE DE VIBRATIONS, SYSTÈME DE MESURE ET PROCÉDÉ DE MESURE | Examination procedure | 07.08.2015 | Examination requested [2016/05] | 01.08.2016 | Amendment by applicant (claims and/or description) | 13.02.2020 | Despatch of a communication from the examining division (Time limit: M02) | 07.04.2020 | Reply to a communication from the examining division | 23.11.2020 | Communication of intention to grant the patent | 24.02.2021 | Fee for grant paid | 24.02.2021 | Fee for publishing/printing paid | 24.02.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP13849013.1 / EP2914020 | Opposition(s) | 10.01.2022 | No opposition filed within time limit [2022/11] | Fees paid | Renewal fee | 26.10.2015 | Renewal fee patent year 03 | 21.10.2016 | Renewal fee patent year 04 | 25.10.2017 | Renewal fee patent year 05 | 24.10.2018 | Renewal fee patent year 06 | 25.10.2019 | Renewal fee patent year 07 | 14.10.2020 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.10.2013 | AL | 07.04.2021 | AT | 07.04.2021 | CY | 07.04.2021 | CZ | 07.04.2021 | DK | 07.04.2021 | EE | 07.04.2021 | ES | 07.04.2021 | FI | 07.04.2021 | HR | 07.04.2021 | IT | 07.04.2021 | LT | 07.04.2021 | LV | 07.04.2021 | MC | 07.04.2021 | MK | 07.04.2021 | NL | 07.04.2021 | PL | 07.04.2021 | RO | 07.04.2021 | RS | 07.04.2021 | SE | 07.04.2021 | SI | 07.04.2021 | SK | 07.04.2021 | SM | 07.04.2021 | BG | 07.07.2021 | NO | 07.07.2021 | GR | 08.07.2021 | IS | 07.08.2021 | PT | 09.08.2021 | GB | 22.10.2021 | IE | 22.10.2021 | LU | 22.10.2021 | BE | 31.10.2021 | CH | 31.10.2021 | FR | 31.10.2021 | LI | 31.10.2021 | [2024/22] |
Former [2023/30] | HU | 22.10.2013 | |
AL | 07.04.2021 | ||
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
GB | 22.10.2021 | ||
IE | 22.10.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2023/29] | HU | 22.10.2013 | |
AL | 07.04.2021 | ||
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
GB | 22.10.2021 | ||
IE | 22.10.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/48] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
GB | 22.10.2021 | ||
IE | 22.10.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/41] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
GB | 22.10.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/37] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
GB | 22.10.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
Former [2022/36] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
GB | 22.10.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
Former [2022/35] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
GB | 22.10.2021 | ||
LU | 22.10.2021 | ||
BE | 31.10.2021 | ||
Former [2022/33] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
BE | 31.10.2021 | ||
Former [2022/29] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/26] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/23] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/10] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/08] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/07] | AT | 07.04.2021 | |
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/52] | AT | 07.04.2021 | |
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/51] | AT | 07.04.2021 | |
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/50] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
Former [2021/49] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
Former [2021/47] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
LT | 07.04.2021 | ||
NL | 07.04.2021 | ||
BG | 07.07.2021 | ||
Former [2021/46] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
LT | 07.04.2021 | Documents cited: | Search | [Y]US4852150 (YAMAMOTO TADASHI [JP]) [Y] 2,3,6 * column 2, line 4 - line 20 *; | [A]US5624377 (DAVIS LARRY J [US]) [A] 1 * column 3, line 46 - column 6, line 32 ** figure 3 *; | [Y]US2008056518 (BURROWS MARK [US], et al) [Y] 4,5 * paragraph [0046] *; | [XY]CN101867863 (TELECOMM TRANSMISSION RES INST MINISTRY OF INDUSTRY AND INFORMATION TECHNOLOGY, et al) [X] 1 * paragraph [0049] - paragraph [0079] * * figures 7,8 * * abstract * [Y] 2-6 | by applicant | JP2005348193 |