| EP2998509 - ENDWALL CONTOURING FOR AIRFOIL ROWS WITH VARYING AIRFOIL GEOMETRIES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.07.2023 Database last updated on 07.03.2026 | |
| Former | The patent has been granted Status updated on 29.07.2022 | ||
| Former | Grant of patent is intended Status updated on 13.03.2022 | ||
| Former | Examination is in progress Status updated on 31.08.2018 | ||
| Former | Request for examination was made Status updated on 01.11.2016 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Raytheon Technologies Corporation 10 Farm Springs Road Farmington, CT 06032 / US | [2021/12] |
| Former [2016/43] | For all designated states United Technologies Corporation 10 Farm Springs Road Farmington, CT 06032 / US | ||
| Former [2016/12] | For all designated states United Technologies Corporation One Financial Plaza Hartford, CT 06101 / US | Inventor(s) | 01 /
THOMAS, Flavien L. 143 Cherry Swamp Road Moodus, CT Connecticut 06469 / US | [2016/12] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
| Former [2022/35] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | ||
| Former [2016/12] | Leckey, David Herbert Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 15184513.8 | 09.09.2015 | [2016/12] | Priority number, date | US201462049391P | 12.09.2014 Original published format: US 201462049391 P | [2016/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2998509 | Date: | 23.03.2016 | Language: | EN | [2016/12] | Type: | B1 Patent specification | No.: | EP2998509 | Date: | 31.08.2022 | Language: | EN | [2022/35] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.02.2016 | Classification | IPC: | F01D5/14 | [2016/12] | CPC: |
F04D29/544 (EP,US);
F01D11/008 (US);
F01D5/02 (US);
F01D5/143 (EP,US);
F01D5/147 (US);
F01D9/041 (US);
F04D29/324 (EP,US);
F04D29/545 (EP,US);
F01D11/005 (EP,US);
F05D2220/32 (US);
F05D2230/60 (US);
F05D2240/12 (US);
F05D2240/24 (US);
F05D2240/55 (US);
F05D2240/80 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/44] |
| Former [2016/12] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ENDWANDKONTURIERUNG EINER SCHAUFELSTUFE MIT UNTERSCHIEDLICHEN SCHAUFELGEOMETRIEN | [2016/12] | English: | ENDWALL CONTOURING FOR AIRFOIL ROWS WITH VARYING AIRFOIL GEOMETRIES | [2016/12] | French: | PAROI D'EXTRÉMITÉ PROFILÉE POUR GRILLES D'AUBES AVEC GÉOMÉTRIES DIFFÉRENTES | [2016/12] | Examination procedure | 21.09.2016 | Examination requested [2016/44] | 11.01.2017 | Amendment by applicant (claims and/or description) | 11.05.2017 | Observations by third parties | 03.09.2018 | Despatch of a communication from the examining division (Time limit: M06) | 11.03.2019 | Reply to a communication from the examining division | 02.01.2020 | Despatch of a communication from the examining division (Time limit: M06) | 14.10.2020 | Reply to a communication from the examining division | 23.11.2020 | Despatch of a communication from the examining division (Time limit: M06) | 25.06.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 02.09.2021 | Reply to a communication from the examining division | 14.03.2022 | Communication of intention to grant the patent | 20.07.2022 | Fee for grant paid | 20.07.2022 | Fee for publishing/printing paid | 20.07.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | EP22192486.3 / EP4116543 | Opposition(s) | 01.06.2023 | No opposition filed within time limit [2023/32] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 02.09.2021 | Request for further processing filed | 02.09.2021 | Full payment received (date of receipt of payment) Request granted | 08.09.2021 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the examination report | 14.10.2020 | Request for further processing filed | 14.10.2020 | Full payment received (date of receipt of payment) Request granted | 21.10.2020 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 11.01.2017 | Request for further processing filed | 11.01.2017 | Full payment received (date of receipt of payment) Request granted | 27.01.2017 | Decision despatched | Fees paid | Renewal fee | 22.09.2017 | Renewal fee patent year 03 | 21.09.2018 | Renewal fee patent year 04 | 19.09.2019 | Renewal fee patent year 05 | 17.09.2020 | Renewal fee patent year 06 | 21.09.2021 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.09.2015 | AL | 31.08.2022 | AT | 31.08.2022 | BG | 31.08.2022 | CY | 31.08.2022 | CZ | 31.08.2022 | DK | 31.08.2022 | EE | 31.08.2022 | ES | 31.08.2022 | FI | 31.08.2022 | HR | 31.08.2022 | IT | 31.08.2022 | LT | 31.08.2022 | LV | 31.08.2022 | MC | 31.08.2022 | MK | 31.08.2022 | MT | 31.08.2022 | NL | 31.08.2022 | PL | 31.08.2022 | RO | 31.08.2022 | RS | 31.08.2022 | SE | 31.08.2022 | SI | 31.08.2022 | SK | 31.08.2022 | SM | 31.08.2022 | TR | 31.08.2022 | IE | 09.09.2022 | LU | 09.09.2022 | BE | 30.09.2022 | CH | 30.09.2022 | LI | 30.09.2022 | NO | 30.11.2022 | GR | 01.12.2022 | IS | 31.12.2022 | PT | 02.01.2023 | [2026/04] |
| Former [2024/41] | HU | 09.09.2015 | |
| AL | 31.08.2022 | ||
| AT | 31.08.2022 | ||
| BG | 31.08.2022 | ||
| CY | 31.08.2022 | ||
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| EE | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| IT | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| MC | 31.08.2022 | ||
| MK | 31.08.2022 | ||
| MT | 31.08.2022 | ||
| NL | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SI | 31.08.2022 | ||
| SK | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| IE | 09.09.2022 | ||
| LU | 09.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2024/34] | HU | 09.09.2015 | |
| AL | 31.08.2022 | ||
| AT | 31.08.2022 | ||
| BG | 31.08.2022 | ||
| CY | 31.08.2022 | ||
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| EE | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| IT | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| MC | 31.08.2022 | ||
| MK | 31.08.2022 | ||
| NL | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SI | 31.08.2022 | ||
| SK | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| IE | 09.09.2022 | ||
| LU | 09.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2024/27] | HU | 09.09.2015 | |
| AL | 31.08.2022 | ||
| AT | 31.08.2022 | ||
| CY | 31.08.2022 | ||
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| EE | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| IT | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| MC | 31.08.2022 | ||
| MK | 31.08.2022 | ||
| NL | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SI | 31.08.2022 | ||
| SK | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| IE | 09.09.2022 | ||
| LU | 09.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2024/26] | HU | 09.09.2015 | |
| AL | 31.08.2022 | ||
| AT | 31.08.2022 | ||
| CY | 31.08.2022 | ||
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| EE | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| IT | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| MC | 31.08.2022 | ||
| NL | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SI | 31.08.2022 | ||
| SK | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| IE | 09.09.2022 | ||
| LU | 09.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2024/21] | HU | 09.09.2015 | |
| AL | 31.08.2022 | ||
| AT | 31.08.2022 | ||
| CY | 31.08.2022 | ||
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| EE | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| MC | 31.08.2022 | ||
| NL | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SI | 31.08.2022 | ||
| SK | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| IE | 09.09.2022 | ||
| LU | 09.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2024/18] | HU | 09.09.2015 | |
| AL | 31.08.2022 | ||
| AT | 31.08.2022 | ||
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| EE | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| MC | 31.08.2022 | ||
| NL | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SI | 31.08.2022 | ||
| SK | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| IE | 09.09.2022 | ||
| LU | 09.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2023/42] | AL | 31.08.2022 | |
| AT | 31.08.2022 | ||
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| EE | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| MC | 31.08.2022 | ||
| NL | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SI | 31.08.2022 | ||
| SK | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| IE | 09.09.2022 | ||
| LU | 09.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2023/37] | AL | 31.08.2022 | |
| AT | 31.08.2022 | ||
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| EE | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| MC | 31.08.2022 | ||
| NL | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SI | 31.08.2022 | ||
| SK | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| IE | 09.09.2022 | ||
| LU | 09.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2023/35] | AL | 31.08.2022 | |
| AT | 31.08.2022 | ||
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| EE | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| MC | 31.08.2022 | ||
| NL | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SK | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| IE | 09.09.2022 | ||
| LU | 09.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2023/33] | AL | 31.08.2022 | |
| AT | 31.08.2022 | ||
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| EE | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| MC | 31.08.2022 | ||
| NL | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SK | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| IE | 09.09.2022 | ||
| LU | 09.09.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2023/30] | AL | 31.08.2022 | |
| AT | 31.08.2022 | ||
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| EE | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| MC | 31.08.2022 | ||
| NL | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SK | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| LU | 09.09.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2023/29] | AL | 31.08.2022 | |
| AT | 31.08.2022 | ||
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| EE | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| MC | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SK | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2023/25] | AT | 31.08.2022 | |
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| EE | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| MC | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SK | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2023/23] | AT | 31.08.2022 | |
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| EE | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SK | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2023/22] | AT | 31.08.2022 | |
| CZ | 31.08.2022 | ||
| DK | 31.08.2022 | ||
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RO | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| PT | 02.01.2023 | ||
| Former [2023/21] | DK | 31.08.2022 | |
| ES | 31.08.2022 | ||
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| Former [2023/20] | ES | 31.08.2022 | |
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| SM | 31.08.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| Former [2023/12] | ES | 31.08.2022 | |
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| IS | 31.12.2022 | ||
| Former [2023/11] | ES | 31.08.2022 | |
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| PL | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| Former [2023/10] | ES | 31.08.2022 | |
| FI | 31.08.2022 | ||
| HR | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| NO | 30.11.2022 | ||
| GR | 01.12.2022 | ||
| Former [2023/09] | ES | 31.08.2022 | |
| FI | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| LV | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| NO | 30.11.2022 | ||
| Former [2023/08] | ES | 31.08.2022 | |
| FI | 31.08.2022 | ||
| LT | 31.08.2022 | ||
| RS | 31.08.2022 | ||
| SE | 31.08.2022 | ||
| NO | 30.11.2022 | Documents cited: | Search | [XA] WO2014130332 (UNITED TECHNOLOGIES CORP et al.) [X] 1-3,6-15 * paragraphs [0057] - [0073] * * page +; figures 4A,4C,7 *[A] 4,5 | [X] US2014072432 (WOEHLER MARCUS et al.) [X] 1-15 * paragraphs [0013] - [0022] * * figures 1-3 * | [X] US2012099995 (DELVAUX JOHN MCCONNELL et al.) [X] 1,6-14 * the whole document * | [XA] WO2013186756 (AVIO SPA et al.) [X] 1-3,6-15 * pages 5-9 * * figures 1-12 *[A] 4,5 |