blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3156093

EP3156093 - PORTABLE CONTROL DEVICE FOR REGULATING A CONTINOUS OXYGEN FLOW [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 12.07.2024
FormerThe patent has been granted
Status updated on  06.03.2020
FormerGrant of patent is intended
Status updated on  03.11.2019
FormerExamination is in progress
Status updated on  27.05.2019
FormerRequest for examination was made
Status updated on  06.10.2017
FormerThe application has been published
Status updated on  20.03.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
LungFlex AB
Garvaren
341 60 Ljungby / SE
[2017/16]
Inventor(s)01 / Andersson, Pär
Kungsgatan 4A
341 30 Ljungby / SE
02 / Henriksson, Kjell
Ringvägen 20
330 10 Bredaryd / SE
03 / Hansson, Bengt
Herkulesgatan 27
341 33 Ljungby / SE
 [2017/16]
Representative(s)AWA Sweden AB
Östra Storgatan 7
553 21 Jönköping / SE
[2020/15]
Former [2017/16]Awapatent AB
Östra Storgatan 7
553 21 Jönköping / SE
Application number, filing date15189360.912.10.2015
[2017/16]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3156093
Date:19.04.2017
Language:EN
[2017/16]
Type: B1 Patent specification 
No.:EP3156093
Date:08.04.2020
Language:EN
[2020/15]
Search report(s)(Supplementary) European search report - dispatched on:EP22.03.2016
ClassificationIPC:A61M16/20, A61M16/06, A61M16/10, F16K31/528, F16K3/02
[2019/46]
CPC:
A61M16/20 (EP,US); A61M16/201 (US); A61M16/0003 (US);
A61M16/0677 (EP,US); A61M16/101 (EP,US); F16K3/0281 (EP,US);
F16K31/5286 (EP,US); A61M2016/003 (US); A61M2202/0208 (EP,US);
A61M2205/3334 (EP,US); A61M2205/58 (US); A61M2205/581 (EP,US);
A61M2205/583 (EP,US); A61M2209/088 (EP,US) (-)
Former IPC [2017/16]A61M16/20, A61M16/06, A61M16/10, F16K31/528, F16K3/32, F16K3/34
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/45]
Former [2017/16]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:TRAGBARE STEUERUNGSVORRICHTUNG ZUR REGELUNG EINES KONTINUIERLICHEN SAUERSTOFFSTROMS[2017/16]
English:PORTABLE CONTROL DEVICE FOR REGULATING A CONTINOUS OXYGEN FLOW[2017/16]
French:DISPOSITIF DE COMMANDE PORTABLE POUR RÉGULER UN FLUX D'OXYGÈNE CONTINU[2017/16]
Examination procedure12.10.2015Date on which the examining division has become responsible
28.09.2017Amendment by applicant (claims and/or description)
28.09.2017Examination requested  [2017/45]
31.05.2019Despatch of a communication from the examining division (Time limit: M04)
01.10.2019Reply to a communication from the examining division
04.11.2019Communication of intention to grant the patent
02.03.2020Fee for grant paid
02.03.2020Fee for publishing/printing paid
02.03.2020Receipt of the translation of the claim(s)
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
29.09.2017Renewal fee patent year 03
28.09.2018Renewal fee patent year 04
15.10.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.10.2015
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
EE08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MK08.04.2020
MT08.04.2020
RO08.04.2020
RS08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
IE12.10.2020
LU12.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
[2022/32]
Former [2022/28]HU12.10.2015
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
EE08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MT08.04.2020
RO08.04.2020
RS08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
IE12.10.2020
LU12.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
Former [2021/46]AL08.04.2020
AT08.04.2020
CZ08.04.2020
EE08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
RO08.04.2020
RS08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
IE12.10.2020
LU12.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
Former [2021/37]AL08.04.2020
AT08.04.2020
CZ08.04.2020
EE08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
RO08.04.2020
RS08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
LU12.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
Former [2021/36]AL08.04.2020
AT08.04.2020
CZ08.04.2020
EE08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
RO08.04.2020
RS08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
LU12.10.2020
BE31.10.2020
Former [2021/31]AL08.04.2020
AT08.04.2020
CZ08.04.2020
EE08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
RO08.04.2020
RS08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
LU12.10.2020
Former [2021/24]AL08.04.2020
AT08.04.2020
CZ08.04.2020
EE08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RO08.04.2020
RS08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/10]AL08.04.2020
AT08.04.2020
CZ08.04.2020
EE08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RO08.04.2020
RS08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/09]AL08.04.2020
AT08.04.2020
CZ08.04.2020
EE08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RO08.04.2020
RS08.04.2020
SM08.04.2020
BG08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/04]AL08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
BG08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/01]HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
BG08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/51]HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/50]HR08.04.2020
LT08.04.2020
LV08.04.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/49]LT08.04.2020
IS08.08.2020
PT17.08.2020
Former [2020/47]LT08.04.2020
IS08.08.2020
Former [2020/46]IS08.08.2020
Documents cited:Search[XI]US4241896  (VOEGE CLAYTON B [US]) [X] 1-7,13-15 * the whole document, and especially the figures 1-11 * [I] 11,12;
 [XI]US4366947  (VOEGE CLAYTON B) [X] 1-7,13,14 * the whole document, and especially column 1 lines 4-12, column 2 line 67 to column 4 line 29 and figures 1-4 * [I] 8-12,15;
 [XI]WO9711734  (NELLCOR PURITAN BENNETT INC [US], et al) [X] 1-4,13 * the whole document, and especially page 10 line 25 to page 11 line 7, page 14 line 30 to page 15 line 6, page 17 line 6 to page 25 line 11, and the figures * [I] 5-12,14,15;
 [XI]WO9713185  (PROTECTOR TECHNOLOGIES LIMITED [GB], et al) [X] 1-9,13-15 * the whole document, and especially page 1 lines 3-23, page 2 lines 11-20, page 7 line 14 to page 9 line 29, and the figure * [I] 10-12;
 [XI]EP1090655  (PROCLIN INTERNATIONAL B V [NL]) [X] 1-6,13,14 * the whole document, and especially figures 1-3 * [I] 15;
 [XI]US6394088  (FRYE MARK R [US], et al) [X] 1-4,13 * the whole document, and especially column 3 lines 46-55, column 9 line 5 to column 11 line 29, and figures 1-21 * [I] 5-12,14,15;
 [X]EP2732841  (FLOW METER SPA [IT]) [X] 1-6,13-15* the whole document, and especially column 6 lines 7-10 and figures 1-9 *;
 [XI]US2014182591  (BOONE RICHARD T [US], et al) [X] 1-5,13-15 * the whole document, and especially page 1 paragraphs [0002]-[0005] and [0026], page 2 paragraphs [0033] and [0035], and figures 1-13 * [I] 11,12
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.