EP3016319 - METHOD AND APPARATUS FOR DYNAMICALLY DISPLAYING DEVICE LIST [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.11.2019 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 23.11.2018 | ||
Former | Grant of patent is intended Status updated on 19.08.2018 | ||
Former | Examination is in progress Status updated on 10.02.2017 | ||
Former | Request for examination was made Status updated on 11.11.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Xiaomi Inc. Floor 13, Rainbow City Shopping Mall II of China Resources No. 68 Qinghe Middle Street, Haidian District Beijing 100085 / CN | [2016/18] | Inventor(s) | 01 /
LI, Feiyun Xiaomi Inc Rainbow City Shopping Mall II of China Resources No.68 Qinghe Middle Street 100085 Haidian District / CN | 02 /
WANG, Yang Xiaomi Inc Rainbow City Shopping Mall II of China Resources No.68 Qinghe Middle Street 100085 Haidian District / CN | 03 /
FU, Qiang Xiaomi Inc Rainbow City Shopping Mall II of China Resources No.68 Qinghe Middle Street 100085 Haidian District / CN | [2016/18] | Representative(s) | Reeve, Nicholas Edward Reddie & Grose LLP The White Chapel Building 10 Whitechapel High Street London E1 8QS / GB | [2018/52] |
Former [2016/18] | Reeve, Nicholas Edward Reddie & Grose LLP 16 Theobalds Road London WC1X 8PL / GB | Application number, filing date | 15191974.3 | 28.10.2015 | [2016/18] | Priority number, date | CN201410593513 | 29.10.2014 Original published format: CN201410593513 | [2016/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3016319 | Date: | 04.05.2016 | Language: | EN | [2016/18] | Type: | B1 Patent specification | No.: | EP3016319 | Date: | 26.12.2018 | Language: | EN | [2018/52] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.03.2016 | Classification | IPC: | H04L12/28 | [2016/18] | CPC: |
H04L12/2809 (EP,MX);
G06F3/0481 (RU);
G06F3/0482 (CN,RU);
G06F3/04883 (CN);
G06F9/46 (RU);
G09G5/00 (RU);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/50] |
Former [2016/18] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN UND VORRICHTUNG ZUR DYNAMISCHEN ANZEIGE EINER GERÄTELISTE | [2018/36] | English: | METHOD AND APPARATUS FOR DYNAMICALLY DISPLAYING DEVICE LIST | [2016/18] | French: | PROCÉDÉ ET APPAREIL POUR AFFICHAGE DYNAMIQUE DE LISTE DE DISPOSITIF | [2018/36] |
Former [2016/18] | VERFAHREN UND VORRICHTUNG ZUR DYNAMISCHEN ANZEIGE EINER VORRICHTUNGSLISTE | ||
Former [2016/18] | PROCÉDÉ ET APPAREIL POUR DISPOSITIF D'AFFICHAGE DYNAMIQUE DE LISTE | Examination procedure | 28.10.2015 | Date on which the examining division has become responsible | 04.11.2016 | Amendment by applicant (claims and/or description) | 04.11.2016 | Examination requested [2016/50] | 08.02.2017 | Despatch of a communication from the examining division (Time limit: M04) | 08.06.2017 | Reply to a communication from the examining division | 21.08.2017 | Despatch of a communication from the examining division (Time limit: M04) | 12.12.2017 | Reply to a communication from the examining division | 27.02.2018 | Despatch of a communication from the examining division (Time limit: M04) | 30.05.2018 | Reply to a communication from the examining division | 20.08.2018 | Communication of intention to grant the patent | 13.11.2018 | Fee for grant paid | 13.11.2018 | Fee for publishing/printing paid | 13.11.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 27.09.2019 | No opposition filed within time limit [2019/49] | Fees paid | Renewal fee | 25.10.2017 | Renewal fee patent year 03 | 24.10.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.10.2015 | AL | 26.12.2018 | AT | 26.12.2018 | CY | 26.12.2018 | CZ | 26.12.2018 | DK | 26.12.2018 | EE | 26.12.2018 | ES | 26.12.2018 | FI | 26.12.2018 | HR | 26.12.2018 | IT | 26.12.2018 | LT | 26.12.2018 | LV | 26.12.2018 | MC | 26.12.2018 | MK | 26.12.2018 | MT | 26.12.2018 | NL | 26.12.2018 | PL | 26.12.2018 | RO | 26.12.2018 | RS | 26.12.2018 | SE | 26.12.2018 | SI | 26.12.2018 | SK | 26.12.2018 | SM | 26.12.2018 | TR | 26.12.2018 | BG | 26.03.2019 | NO | 26.03.2019 | GR | 27.03.2019 | IS | 26.04.2019 | PT | 26.04.2019 | [2022/31] |
Former [2021/34] | HU | 28.10.2015 | |
AL | 26.12.2018 | ||
AT | 26.12.2018 | ||
CY | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
MT | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2021/32] | HU | 28.10.2015 | |
AL | 26.12.2018 | ||
AT | 26.12.2018 | ||
CY | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2021/26] | AL | 26.12.2018 | |
AT | 26.12.2018 | ||
CY | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2020/29] | AL | 26.12.2018 | |
AT | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2020/17] | AL | 26.12.2018 | |
AT | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
TR | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2020/13] | AL | 26.12.2018 | |
AT | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/48] | AL | 26.12.2018 | |
AT | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/46] | AL | 26.12.2018 | |
AT | 26.12.2018 | ||
CZ | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/39] | AL | 26.12.2018 | |
CZ | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/37] | AL | 26.12.2018 | |
CZ | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/35] | AL | 26.12.2018 | |
CZ | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/34] | AL | 26.12.2018 | |
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/33] | AL | 26.12.2018 | |
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/30] | AL | 26.12.2018 | |
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/26] | AL | 26.12.2018 | |
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/25] | FI | 26.12.2018 | |
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
RS | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/24] | FI | 26.12.2018 | |
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/23] | FI | 26.12.2018 | |
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
Former [2019/22] | FI | 26.12.2018 | |
LT | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
Former [2019/21] | FI | 26.12.2018 | |
LT | 26.12.2018 | ||
NO | 26.03.2019 | ||
Former [2019/20] | LT | 26.12.2018 | |
NO | 26.03.2019 | Documents cited: | Search | [XI]WO2011053008 (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1-4,11-15 * paragraph [0001] * * paragraph [0005] - paragraph [0048]; figures 1,3-7; claims 1-8 * [I] 5-10; | [XI]US2013113822 (PUTREVU SRIHARSHA [US], et al) [X] 1,4,6,11,14,15 * paragraph [0003] - paragraph [0049] * * paragraph [0060] - paragraph [0082]; figures 1-15; claims 1-11 *[I] 5,7-10; | [XI]US2014005809 (FREI RANDALL W [US], et al) [X] 1-8,10-15 * paragraph [0067] - paragraph [0083] * * paragraph [0171] - paragraph [0191] * * paragraph [0210] - paragraph [0276] * * paragraph [0294] - paragraph [0304]; figures 4c,4d,6a-6c,11; claims 1-10 * [I] 9 |