blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3035579

EP3035579 - APPARATUS, METHOD AND SYSTEM TO EXCHANGE ERROR INFORMATION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.02.2021
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  20.03.2020
FormerGrant of patent is intended
Status updated on  19.11.2019
FormerExamination is in progress
Status updated on  23.02.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Intel Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
[2016/25]
Inventor(s)01 / HAMO, Oshri Ben
Hail Ha'avir 21/4
Jerusalem, JM / IL
 [2016/25]
Representative(s)HGF
HGF Limited
1 City Walk
Leeds LS11 9DX / GB
[N/P]
Former [2020/17]HGF Limited
Fountain Precinct
Balm Green
Sheffield S1 2JA / GB
Former [2016/25]Hufton, David Alan
HGF Limited
Fountain Precinct
Balm Green
Sheffield S1 2JA / GB
Application number, filing date15193991.510.11.2015
[2016/25]
Priority number, dateUS20141457268616.12.2014         Original published format: US201414572686
[2016/25]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3035579
Date:22.06.2016
Language:EN
[2016/25]
Type: B1 Patent specification 
No.:EP3035579
Date:22.04.2020
Language:EN
[2020/17]
Search report(s)(Supplementary) European search report - dispatched on:EP26.04.2016
ClassificationIPC:H04L1/16
[2016/25]
CPC:
H04L1/1671 (EP,US); H04L1/0082 (CN); G06F11/0772 (US);
G06F11/073 (US); G06F11/0751 (US); G06F13/4282 (CN);
G06F15/7807 (CN); H04L1/0083 (CN); H04L1/0084 (CN);
G06F2213/0038 (CN); H04L67/568 (CN) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/25]
TitleGerman:VORRICHTUNG, VERFAHREN UND SYSTEM ZUM AUSTAUSCHEN VON FEHLERINFORMATION[2016/25]
English:APPARATUS, METHOD AND SYSTEM TO EXCHANGE ERROR INFORMATION[2016/25]
French:APPAREIL, PROCÉDÉ ET SYSTÈME POUR L'ECHANGE DES INFORMATIONS D'ERREUR[2016/25]
Examination procedure10.11.2015Examination requested  [2016/25]
22.12.2016Amendment by applicant (claims and/or description)
22.02.2018Despatch of a communication from the examining division (Time limit: M04)
03.07.2018Reply to a communication from the examining division
08.08.2018Despatch of a communication from the examining division (Time limit: M04)
17.12.2018Reply to a communication from the examining division
18.01.2019Despatch of a communication from the examining division (Time limit: M04)
24.04.2019Reply to a communication from the examining division
28.05.2019Despatch of a communication from the examining division (Time limit: M04)
03.10.2019Reply to a communication from the examining division
20.11.2019Communication of intention to grant the patent
12.03.2020Fee for grant paid
12.03.2020Fee for publishing/printing paid
12.03.2020Receipt of the translation of the claim(s)
Opposition(s)25.01.2021No opposition filed within time limit [2021/13]
Fees paidRenewal fee
13.11.2017Renewal fee patent year 03
14.11.2018Renewal fee patent year 04
14.11.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.11.2015
AL22.04.2020
AT22.04.2020
CY22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
MK22.04.2020
MT22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
TR22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
PT24.08.2020
GB10.11.2020
IE10.11.2020
LU10.11.2020
BE30.11.2020
CH30.11.2020
FR30.11.2020
LI30.11.2020
[2022/33]
Former [2022/32]HU10.11.2015
AL22.04.2020
AT22.04.2020
CY22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
MK22.04.2020
MT22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
TR22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
PT24.08.2020
GB10.11.2020
IE10.11.2020
LU10.11.2020
CH30.11.2020
FR30.11.2020
LI30.11.2020
Former [2022/27]HU10.11.2015
AL22.04.2020
AT22.04.2020
CY22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
MT22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
TR22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
PT24.08.2020
GB10.11.2020
IE10.11.2020
LU10.11.2020
CH30.11.2020
FR30.11.2020
LI30.11.2020
Former [2022/10]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
PT24.08.2020
GB10.11.2020
IE10.11.2020
LU10.11.2020
CH30.11.2020
FR30.11.2020
LI30.11.2020
Former [2021/49]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
GB10.11.2020
IE10.11.2020
LU10.11.2020
CH30.11.2020
FR30.11.2020
LI30.11.2020
Former [2021/48]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
IE10.11.2020
LU10.11.2020
CH30.11.2020
FR30.11.2020
LI30.11.2020
Former [2021/46]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
IE10.11.2020
LU10.11.2020
CH30.11.2020
LI30.11.2020
Former [2021/37]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
LU10.11.2020
CH30.11.2020
LI30.11.2020
Former [2021/33]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
LU10.11.2020
Former [2021/31]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/24]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/10]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/09]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
IT22.04.2020
LT22.04.2020
LV22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/08]AL22.04.2020
DK22.04.2020
ES22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/04]AL22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
RS22.04.2020
SE22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/01]FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
RS22.04.2020
SE22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/51]FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
RS22.04.2020
SE22.04.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/50]FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
SE22.04.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/48]FI22.04.2020
LT22.04.2020
SE22.04.2020
NO22.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/47]LT22.04.2020
NO22.07.2020
IS22.08.2020
Former [2020/46]IS22.08.2020
Documents cited:Search[A]EP2007051  (MITSUBISHI ELECTRIC CORP [JP]) [A] 1,7,10,14 * paragraph [0024] - paragraph [0030] ** paragraph [0040] - paragraph [0046] *;
 [X]EP2026534  (PANASONIC CORP [JP]) [X] 1-15 * paragraph [0032] * * paragraph [0049] *;
 [X]WO2009090255  (NXP BV [NL], et al) [X] 1-15 * page 1, line 12 - line 21 * * page 2, line 5 - line 27 * * page 6, line 18 - line 27 * * page 7, line 33 - page 8, line 27 * * page 9, line 7 - line 20 *;
 [X]US2010165931  (NIMBALKER AJIT [US], et al) [X] 1-15 * paragraph [0036] - paragraph [0045] * * paragraph [0050] - paragraph [0051] * * paragraph [0061] - paragraph [0063] *;
 [X]US2013176864  (QUAN ZHI [US], et al) [X] 1-15 * paragraph [0003] - paragraph [0005] * * paragraph [0027] - paragraph [0041] * * paragraph [0049] * * paragraph [0053] * * paragraph [0062] - paragraph [0066] * * paragraph [0071] * * paragraph [0083] * * paragraph [0089] *
ExaminationEP2391042
    - DESOLI ET AL, "An outlook on the evolution of mobile terminals: from monolithic to modular multiradio, multiapplication platforms", IEEE CIRCUITS AND SYSTEMS MAGAZINE, IEEE SERVICE CENTER, NEW YORK, NY, US, (20060101), vol. 6, no. 2, doi:10.1109/MCAS.2006.1648987, ISSN 1531-636X, pages 17 - 29, XP011142159

DOI:   http://dx.doi.org/10.1109/MCAS.2006.1648987
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.