| EP3034635 - TANK BIOLEACHING OF COPPER SULFIDE ORES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.09.2019 Database last updated on 08.04.2026 | |
| Former | The patent has been granted Status updated on 28.09.2018 | ||
| Former | Grant of patent is intended Status updated on 29.05.2018 | ||
| Former | Examination is in progress Status updated on 08.09.2017 | ||
| Former | Request for examination was made Status updated on 06.01.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, HU, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Middle East Mine and Industry Company No. 8, Moaref Street Farhang Boulevard 1997744111 Tehran / IR | [2016/25] | Inventor(s) | 01 /
Aliasghar, Pourmand c/o No. 8, Moaref St., Farhang Blvd. 1997744111 Tehran / IR | [2016/25] | Representative(s) | Hamm&Wittkopp Patentanwälte PartmbB Jungfernstieg 38 20354 Hamburg / DE | [2018/44] |
| Former [2016/25] | Maiwald Patentanwalts GmbH Jungfernstieg 38 20354 Hamburg / DE | Application number, filing date | 15199787.1 | 14.12.2015 | [2016/25] | Priority number, date | IR20141393501400 | 15.12.2014 Original published format: IR 1393501400 | [2016/25] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3034635 | Date: | 22.06.2016 | Language: | EN | [2016/25] | Type: | B1 Patent specification | No.: | EP3034635 | Date: | 31.10.2018 | Language: | EN | [2018/44] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 12.05.2016 | Classification | IPC: | C22B3/18, C12N1/00, C22B15/00 | [2016/25] | CPC: |
C22B3/18 (EP);
C12N1/20 (EP);
C22B15/0071 (EP);
Y02P10/20 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/06] |
| Former [2016/25] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | TANKBIOLAUGUNG VON KUPFERSULFIDERZEN | [2016/25] | English: | TANK BIOLEACHING OF COPPER SULFIDE ORES | [2016/25] | French: | CUVE DE BIO-LIXIVIATION DE MINERAIS DE SULFURE DE CUIVRE | [2016/25] | Examination procedure | 14.12.2015 | Date on which the examining division has become responsible | 21.12.2016 | Amendment by applicant (claims and/or description) | 21.12.2016 | Examination requested [2017/06] | 22.05.2017 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the invitation to file a copy of earlier search results or a statement of non-availability not received in time | 08.09.2017 | Despatch of a communication from the examining division (Time limit: M04) | 15.01.2018 | Reply to a communication from the examining division | 30.05.2018 | Communication of intention to grant the patent | 20.09.2018 | Fee for grant paid | 20.09.2018 | Fee for publishing/printing paid | 20.09.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | EP18203528.7 / EP3578673 | Opposition(s) | 01.08.2019 | No opposition filed within time limit [2019/41] | Request for further processing for: | The application is deemed to be withdrawn due to failure to file a copy of earlier search results or a statement of non-availability | 20.07.2017 | Request for further processing filed | 20.07.2017 | Full payment received (date of receipt of payment) Request granted | 03.08.2017 | Decision despatched | Fees paid | Renewal fee | 23.11.2017 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.12.2015 | AL | 31.10.2018 | AT | 31.10.2018 | CY | 31.10.2018 | CZ | 31.10.2018 | DK | 31.10.2018 | EE | 31.10.2018 | ES | 31.10.2018 | FI | 31.10.2018 | HR | 31.10.2018 | IT | 31.10.2018 | LT | 31.10.2018 | LV | 31.10.2018 | MC | 31.10.2018 | MK | 31.10.2018 | NL | 31.10.2018 | PL | 31.10.2018 | RO | 31.10.2018 | RS | 31.10.2018 | SE | 31.10.2018 | SI | 31.10.2018 | SK | 31.10.2018 | SM | 31.10.2018 | TR | 31.10.2018 | IE | 14.12.2018 | LU | 14.12.2018 | MT | 14.12.2018 | BE | 31.12.2018 | CH | 31.12.2018 | LI | 31.12.2018 | BG | 31.01.2019 | NO | 31.01.2019 | GR | 01.02.2019 | IS | 28.02.2019 | PT | 01.03.2019 | [2020/31] |
| Former [2020/17] | AL | 31.10.2018 | |
| AT | 31.10.2018 | ||
| CZ | 31.10.2018 | ||
| DK | 31.10.2018 | ||
| EE | 31.10.2018 | ||
| ES | 31.10.2018 | ||
| FI | 31.10.2018 | ||
| HR | 31.10.2018 | ||
| IT | 31.10.2018 | ||
| LT | 31.10.2018 | ||
| LV | 31.10.2018 | ||
| MC | 31.10.2018 | ||
| NL | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| RO | 31.10.2018 | ||
| RS | 31.10.2018 | ||
| SE | 31.10.2018 | ||
| SI | 31.10.2018 | ||
| SK | 31.10.2018 | ||
| SM | 31.10.2018 | ||
| TR | 31.10.2018 | ||
| IE | 14.12.2018 | ||
| LU | 14.12.2018 | ||
| MT | 14.12.2018 | ||
| BE | 31.12.2018 | ||
| CH | 31.12.2018 | ||
| LI | 31.12.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| GR | 01.02.2019 | ||
| IS | 28.02.2019 | ||
| PT | 01.03.2019 | ||
| Former [2020/08] | AL | 31.10.2018 | |
| AT | 31.10.2018 | ||
| CZ | 31.10.2018 | ||
| DK | 31.10.2018 | ||
| EE | 31.10.2018 | ||
| ES | 31.10.2018 | ||
| FI | 31.10.2018 | ||
| HR | 31.10.2018 | ||
| IT | 31.10.2018 | ||
| LT | 31.10.2018 | ||
| LV | 31.10.2018 | ||
| MC | 31.10.2018 | ||
| NL | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| RO | 31.10.2018 | ||
| RS | 31.10.2018 | ||
| SE | 31.10.2018 | ||
| SI | 31.10.2018 | ||
| SK | 31.10.2018 | ||
| SM | 31.10.2018 | ||
| IE | 14.12.2018 | ||
| LU | 14.12.2018 | ||
| MT | 14.12.2018 | ||
| BE | 31.12.2018 | ||
| CH | 31.12.2018 | ||
| LI | 31.12.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| GR | 01.02.2019 | ||
| IS | 28.02.2019 | ||
| PT | 01.03.2019 | ||
| Former [2020/04] | AL | 31.10.2018 | |
| AT | 31.10.2018 | ||
| CZ | 31.10.2018 | ||
| DK | 31.10.2018 | ||
| EE | 31.10.2018 | ||
| ES | 31.10.2018 | ||
| FI | 31.10.2018 | ||
| HR | 31.10.2018 | ||
| IT | 31.10.2018 | ||
| LT | 31.10.2018 | ||
| LV | 31.10.2018 | ||
| MC | 31.10.2018 | ||
| NL | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| RO | 31.10.2018 | ||
| RS | 31.10.2018 | ||
| SE | 31.10.2018 | ||
| SI | 31.10.2018 | ||
| SK | 31.10.2018 | ||
| SM | 31.10.2018 | ||
| IE | 14.12.2018 | ||
| LU | 14.12.2018 | ||
| BE | 31.12.2018 | ||
| CH | 31.12.2018 | ||
| LI | 31.12.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| GR | 01.02.2019 | ||
| IS | 28.02.2019 | ||
| PT | 01.03.2019 | ||
| Former [2019/50] | AL | 31.10.2018 | |
| AT | 31.10.2018 | ||
| CZ | 31.10.2018 | ||
| DK | 31.10.2018 | ||
| EE | 31.10.2018 | ||
| ES | 31.10.2018 | ||
| FI | 31.10.2018 | ||
| HR | 31.10.2018 | ||
| IT | 31.10.2018 | ||
| LT | 31.10.2018 | ||
| LV | 31.10.2018 | ||
| MC | 31.10.2018 | ||
| NL | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| RO | 31.10.2018 | ||
| RS | 31.10.2018 | ||
| SE | 31.10.2018 | ||
| SI | 31.10.2018 | ||
| SK | 31.10.2018 | ||
| SM | 31.10.2018 | ||
| IE | 14.12.2018 | ||
| LU | 14.12.2018 | ||
| BE | 31.12.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| GR | 01.02.2019 | ||
| IS | 28.02.2019 | ||
| PT | 01.03.2019 | ||
| Former [2019/48] | AL | 31.10.2018 | |
| AT | 31.10.2018 | ||
| CZ | 31.10.2018 | ||
| DK | 31.10.2018 | ||
| EE | 31.10.2018 | ||
| ES | 31.10.2018 | ||
| FI | 31.10.2018 | ||
| HR | 31.10.2018 | ||
| IT | 31.10.2018 | ||
| LT | 31.10.2018 | ||
| LV | 31.10.2018 | ||
| MC | 31.10.2018 | ||
| NL | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| RO | 31.10.2018 | ||
| RS | 31.10.2018 | ||
| SE | 31.10.2018 | ||
| SK | 31.10.2018 | ||
| SM | 31.10.2018 | ||
| IE | 14.12.2018 | ||
| LU | 14.12.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| GR | 01.02.2019 | ||
| IS | 28.02.2019 | ||
| PT | 01.03.2019 | ||
| Former [2019/40] | AL | 31.10.2018 | |
| AT | 31.10.2018 | ||
| CZ | 31.10.2018 | ||
| DK | 31.10.2018 | ||
| EE | 31.10.2018 | ||
| ES | 31.10.2018 | ||
| FI | 31.10.2018 | ||
| HR | 31.10.2018 | ||
| IT | 31.10.2018 | ||
| LT | 31.10.2018 | ||
| LV | 31.10.2018 | ||
| MC | 31.10.2018 | ||
| NL | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| RO | 31.10.2018 | ||
| RS | 31.10.2018 | ||
| SE | 31.10.2018 | ||
| SK | 31.10.2018 | ||
| SM | 31.10.2018 | ||
| LU | 14.12.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| GR | 01.02.2019 | ||
| IS | 28.02.2019 | ||
| PT | 01.03.2019 | ||
| Former [2019/39] | AL | 31.10.2018 | |
| AT | 31.10.2018 | ||
| CZ | 31.10.2018 | ||
| DK | 31.10.2018 | ||
| EE | 31.10.2018 | ||
| ES | 31.10.2018 | ||
| FI | 31.10.2018 | ||
| HR | 31.10.2018 | ||
| IT | 31.10.2018 | ||
| LT | 31.10.2018 | ||
| LV | 31.10.2018 | ||
| NL | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| RO | 31.10.2018 | ||
| RS | 31.10.2018 | ||
| SE | 31.10.2018 | ||
| SK | 31.10.2018 | ||
| SM | 31.10.2018 | ||
| LU | 14.12.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| GR | 01.02.2019 | ||
| IS | 28.02.2019 | ||
| PT | 01.03.2019 | ||
| Former [2019/37] | AL | 31.10.2018 | |
| AT | 31.10.2018 | ||
| CZ | 31.10.2018 | ||
| DK | 31.10.2018 | ||
| EE | 31.10.2018 | ||
| ES | 31.10.2018 | ||
| FI | 31.10.2018 | ||
| HR | 31.10.2018 | ||
| IT | 31.10.2018 | ||
| LT | 31.10.2018 | ||
| LV | 31.10.2018 | ||
| NL | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| RO | 31.10.2018 | ||
| RS | 31.10.2018 | ||
| SE | 31.10.2018 | ||
| SM | 31.10.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| GR | 01.02.2019 | ||
| IS | 28.02.2019 | ||
| PT | 01.03.2019 | ||
| Former [2019/35] | AL | 31.10.2018 | |
| AT | 31.10.2018 | ||
| CZ | 31.10.2018 | ||
| DK | 31.10.2018 | ||
| ES | 31.10.2018 | ||
| FI | 31.10.2018 | ||
| HR | 31.10.2018 | ||
| IT | 31.10.2018 | ||
| LT | 31.10.2018 | ||
| LV | 31.10.2018 | ||
| NL | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| RS | 31.10.2018 | ||
| SE | 31.10.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| GR | 01.02.2019 | ||
| IS | 28.02.2019 | ||
| PT | 01.03.2019 | ||
| Former [2019/34] | AL | 31.10.2018 | |
| AT | 31.10.2018 | ||
| DK | 31.10.2018 | ||
| ES | 31.10.2018 | ||
| FI | 31.10.2018 | ||
| HR | 31.10.2018 | ||
| IT | 31.10.2018 | ||
| LT | 31.10.2018 | ||
| LV | 31.10.2018 | ||
| NL | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| RS | 31.10.2018 | ||
| SE | 31.10.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| GR | 01.02.2019 | ||
| IS | 28.02.2019 | ||
| PT | 01.03.2019 | ||
| Former [2019/26] | AL | 31.10.2018 | |
| AT | 31.10.2018 | ||
| ES | 31.10.2018 | ||
| FI | 31.10.2018 | ||
| HR | 31.10.2018 | ||
| LT | 31.10.2018 | ||
| LV | 31.10.2018 | ||
| NL | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| RS | 31.10.2018 | ||
| SE | 31.10.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| GR | 01.02.2019 | ||
| IS | 28.02.2019 | ||
| PT | 01.03.2019 | ||
| Former [2019/25] | AT | 31.10.2018 | |
| ES | 31.10.2018 | ||
| FI | 31.10.2018 | ||
| HR | 31.10.2018 | ||
| LT | 31.10.2018 | ||
| LV | 31.10.2018 | ||
| NL | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| RS | 31.10.2018 | ||
| SE | 31.10.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| GR | 01.02.2019 | ||
| IS | 28.02.2019 | ||
| Former [2019/24] | AT | 31.10.2018 | |
| ES | 31.10.2018 | ||
| FI | 31.10.2018 | ||
| HR | 31.10.2018 | ||
| LT | 31.10.2018 | ||
| LV | 31.10.2018 | ||
| NL | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| SE | 31.10.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| GR | 01.02.2019 | ||
| IS | 28.02.2019 | ||
| Former [2019/23] | AT | 31.10.2018 | |
| ES | 31.10.2018 | ||
| FI | 31.10.2018 | ||
| HR | 31.10.2018 | ||
| LT | 31.10.2018 | ||
| LV | 31.10.2018 | ||
| NL | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| IS | 28.02.2019 | ||
| Former [2019/22] | FI | 31.10.2018 | |
| LT | 31.10.2018 | ||
| PL | 31.10.2018 | ||
| BG | 31.01.2019 | ||
| NO | 31.01.2019 | ||
| IS | 28.02.2019 | ||
| Former [2019/21] | FI | 31.10.2018 | |
| LT | 31.10.2018 | ||
| NO | 31.01.2019 | ||
| IS | 28.02.2019 | ||
| Former [2019/20] | LT | 31.10.2018 | |
| NO | 31.01.2019 | Documents cited: | Search | [XI] US2004206208 (HUNTER COLIN JOHN et al.) | [XI] US2009061503 (HUNTER COLIN JOHN et al.) | [A] WO02066689 (PACIFIC ORE TECH AUSTRALIA LTD et al.) | by applicant | WO2005118894 | AU689599 | WO0118264 | WO0023629 | HAAVANLAMNI, L.; HYVRINEN O.; YLLO, E.; WEATHERSEED, M.: "HydroCopper@ - new method for treating copper concentrates", EXTRACTIVE METALLURGY OPERATORS' CONFERENCE, 2005 | KING, J.A.; DREISINGER, D.B.: "Proc. Copper '95, Cobre '95", 1995, MONTREAL: CIM, article "Autoclaving of copper concentrates", pages: 511 - 534 | MCCCORMICK W.R.: "Production of cobalt, nickel and copper at the Fredericktown Metal Refinery", PRESENTED TO THE MID AMERICA MINERALS CONFERENCE OF AIME, 1958 | BROCK; MADIGAN; MARTINKO; PARKER: "Biology of Microorganisms", pages: 333 | DEW, D.M.; MILLER, D.M.: "The BioNIC Process; Bioleaching of Mineral Sulfide Concentrates for Recovery of Nickel", IBS BIOMINE '97, pages M7.1.0 - M7.1.9 | BRIERLEY, C.L.; BRANS, R.: "Selection ofBacTech 's Thermophilic Bio-Oxidalion Process for Youanmi Mine", BIOMINE 94, CONFERENCE PROCEEDING PERTH, 1994 |