EP3034280 - A METALLIC-COMPOSITE JOINT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.12.2020 Database last updated on 15.11.2024 | |
Former | The patent has been granted Status updated on 10.01.2020 | ||
Former | Grant of patent is intended Status updated on 28.08.2019 | ||
Former | Examination is in progress Status updated on 08.03.2019 | ||
Former | Request for examination was made Status updated on 18.11.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Airbus Operations Limited Pegasus House Aerospace Avenue Filton Bristol BS34 7PA / GB | [2016/25] | Inventor(s) | 01 /
KORYA, Chetan c/o Airbus Operations Limited Pegasus House Aerospace Avenue Filton Bristol, BS34 7PA / GB | 02 /
BRAKES, David c/o Airbus Operations Limited Pegasus House Aerospace Avenue Filton Bristol, BS34 7PA / GB | [2016/25] | Representative(s) | Abel & Imray LLP Westpoint Building James Street West Bath BA1 2DA / GB | [N/P] |
Former [2020/07] | Abel & Imray Westpoint Building James Street West Bath BA1 2DA / GB | ||
Former [2016/25] | Teesdale, Emily Catherine, et al Abel & Imray 20 Red Lion Street London WC1R 4PQ / GB | Application number, filing date | 15200714.2 | 17.12.2015 | [2016/25] | Priority number, date | GB20140022842 | 19.12.2014 Original published format: GB 201422842 | [2016/25] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3034280 | Date: | 22.06.2016 | Language: | EN | [2016/25] | Type: | B1 Patent specification | No.: | EP3034280 | Date: | 12.02.2020 | Language: | EN | [2020/07] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.05.2016 | Classification | IPC: | B29C65/56, B29C65/64 | [2016/25] | CPC: |
F16B19/06 (EP,GB,US);
B29C65/562 (EP,GB,US);
B21J15/147 (GB);
B21J15/36 (GB);
B29C65/564 (EP,GB,US);
B29C65/64 (EP,US);
B29C65/7855 (GB);
B29C66/02242 (EP,US);
B29C66/1122 (EP,US);
B29C66/45 (EP,US);
B29C66/721 (EP,US);
B29C66/73751 (EP,US);
B29C66/74 (GB);
B29C66/742 (EP,GB,US);
B29C70/028 (EP,US);
B29C70/78 (EP,US);
F16B17/008 (EP,US);
F16B5/04 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/51] |
Former [2016/25] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERBINDUNG METALL-VERBUNDSTOFF | [2016/25] | English: | A METALLIC-COMPOSITE JOINT | [2016/25] | French: | ASSEMBLAGE MÉTAL-COMPOSITE | [2016/25] | Examination procedure | 17.12.2015 | Date on which the examining division has become responsible | 11.11.2016 | Amendment by applicant (claims and/or description) | 11.11.2016 | Examination requested [2016/51] | 13.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 08.04.2019 | Reply to a communication from the examining division | 29.08.2019 | Communication of intention to grant the patent | 06.01.2020 | Fee for grant paid | 06.01.2020 | Fee for publishing/printing paid | 06.01.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 13.11.2020 | No opposition filed within time limit [2021/03] | Fees paid | Renewal fee | 21.12.2017 | Renewal fee patent year 03 | 19.12.2018 | Renewal fee patent year 04 | 23.12.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.12.2015 | AL | 12.02.2020 | AT | 12.02.2020 | CY | 12.02.2020 | CZ | 12.02.2020 | DK | 12.02.2020 | EE | 12.02.2020 | ES | 12.02.2020 | FI | 12.02.2020 | HR | 12.02.2020 | IT | 12.02.2020 | LT | 12.02.2020 | LV | 12.02.2020 | MC | 12.02.2020 | MK | 12.02.2020 | MT | 12.02.2020 | NL | 12.02.2020 | PL | 12.02.2020 | RO | 12.02.2020 | RS | 12.02.2020 | SE | 12.02.2020 | SI | 12.02.2020 | SK | 12.02.2020 | SM | 12.02.2020 | TR | 12.02.2020 | BG | 12.05.2020 | NO | 12.05.2020 | GR | 13.05.2020 | IS | 12.06.2020 | PT | 05.07.2020 | [2022/31] |
Former [2022/30] | HU | 17.12.2015 | |
AL | 12.02.2020 | ||
AT | 12.02.2020 | ||
CY | 12.02.2020 | ||
CZ | 12.02.2020 | ||
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
IT | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
MT | 12.02.2020 | ||
NL | 12.02.2020 | ||
PL | 12.02.2020 | ||
RO | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SI | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
TR | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2022/27] | HU | 17.12.2015 | |
AT | 12.02.2020 | ||
CY | 12.02.2020 | ||
CZ | 12.02.2020 | ||
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
IT | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
MT | 12.02.2020 | ||
NL | 12.02.2020 | ||
PL | 12.02.2020 | ||
RO | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SI | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
TR | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2021/40] | AT | 12.02.2020 | |
CZ | 12.02.2020 | ||
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
IT | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
NL | 12.02.2020 | ||
PL | 12.02.2020 | ||
RO | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SI | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2021/10] | AT | 12.02.2020 | |
CZ | 12.02.2020 | ||
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
IT | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
PL | 12.02.2020 | ||
RO | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SI | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2020/50] | CZ | 12.02.2020 | |
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
RO | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2020/49] | CZ | 12.02.2020 | |
DK | 12.02.2020 | ||
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
RO | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2020/48] | DK | 12.02.2020 | |
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
RO | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2020/47] | DK | 12.02.2020 | |
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
Former [2020/45] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
Former [2020/40] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
Former [2020/39] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
Former [2020/38] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
Former [2020/37] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
RS | 12.02.2020 | ||
SE | 12.02.2020 | ||
NO | 12.05.2020 | ||
Former [2020/35] | FI | 12.02.2020 | |
NO | 12.05.2020 | Documents cited: | Search | [X]US3438302 (SANDOR RAYMOND P) [X] 13-15 * column 4, line 45 - column 6, line 6; figures 1-4 *; | [X]US2005220533 (PRICHARD ALAN K [US]) [X] 10-14 * paragraph [0020] - paragraph [0031]; figures 1-6 *; | [IA]WO2010122325 (AIRBUS OPERATIONS LTD [GB], et al) [I] 1-9 * page 8, line 19 - page 10, line 8; figures 9-13 * [A] 10-15; | [A]GB2507128 (BAE SYSTEMS PLC [GB]) [A] 1-12 * figures 1-25 *; | [A]GB2508142 (BAE SYSTEMS PLC [GB]) [A] 1-15* figures 1-10 * |