EP3043048 - COMBUSTION GAS FEEDING AND IGNITION DEVICE FOR A GAS ENGINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.07.2019 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 17.08.2018 | ||
Former | Grant of patent is intended Status updated on 19.04.2018 | ||
Former | Examination is in progress Status updated on 03.03.2018 | ||
Former | Grant of patent is intended Status updated on 14.02.2018 | ||
Former | Examination is in progress Status updated on 31.03.2017 | ||
Former | Request for examination was made Status updated on 02.12.2016 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, HU, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Hoerbiger Wien GmbH Seestadtstrasse 25 1220 Wien / AT | [2018/42] |
Former [2016/35] | For all designated states Hoerbiger Kompressortechnik Holding GmbH Seestadtstraße 25, TC - 3. OG 1220 Wien / AT | ||
Former [2016/28] | For all designated states Hoerbiger Kompressortechnik Holding GmbH Donau-City-Strasse 1 1220 Wien / AT | Inventor(s) | 01 /
Könczöl, Martin Leopold Figl Strasse 6/18/5 2753 Markt Piesting / AT | 02 /
Kogler, Gerhard Zeidlergasse 9a 1230 Wien / AT | 03 /
Steinrück, Peter Lahn 195 4830 Hallstatt / AT | [2016/28] | Representative(s) | Patentanwälte Pinter & Weiss OG Prinz-Eugen-Straße 70 1040 Wien / AT | [2016/28] | Application number, filing date | 15201941.0 | 22.12.2015 | [2016/28] | Priority number, date | AT20150050006 | 07.01.2015 Original published format: AT 500062015 | [2016/28] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3043048 | Date: | 13.07.2016 | Language: | DE | [2016/28] | Type: | B1 Patent specification | No.: | EP3043048 | Date: | 19.09.2018 | Language: | DE | [2018/38] | Type: | B8 Corrected title page of specification | No.: | EP3043048 | Date: | 14.11.2018 | [2018/46] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.06.2016 | Classification | IPC: | F02D19/10, F02M43/04, F02M45/08, F02B19/12, F02M21/02 | [2016/28] | CPC: |
F02B19/108 (EP,CN,US);
F02B19/12 (EP,AT,US);
F02M21/0218 (CN);
F02B19/18 (AT);
F02B43/00 (EP,AT,US);
F02D19/0642 (EP,US);
F02M21/02 (AT);
F02M21/0245 (CN);
F02M21/0248 (EP,US);
F02M21/0251 (CN);
F02M21/0266 (CN);
F02M21/0275 (EP,AT,CN,US);
F02M21/0293 (CN);
F02M45/08 (EP,US);
F02M61/02 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/01] |
Former [2016/28] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BRENNGASZUFÜHRUNGS- UND ZÜNDVORRICHTUNG FÜR EINEN GASMOTOR | [2016/28] | English: | COMBUSTION GAS FEEDING AND IGNITION DEVICE FOR A GAS ENGINE | [2016/28] | French: | DISPOSITIF D'AMORÇAGE ET D'ALIMENTATION EN GAZ COMBUSTIBLE POUR UN MOTEUR A GAZ | [2018/10] |
Former [2016/28] | DISPOSITIF D'AMORÇAGE ET D'ALIMENTATION EN GAZ COMBUSTIBLE POUR UN MOTEUR À GAZ | Examination procedure | 22.12.2015 | Date on which the examining division has become responsible | 28.11.2016 | Amendment by applicant (claims and/or description) | 28.11.2016 | Examination requested [2017/01] | 29.03.2017 | Despatch of a communication from the examining division (Time limit: M04) | 26.07.2017 | Reply to a communication from the examining division | 15.02.2018 | Communication of intention to grant the patent | 27.02.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 20.04.2018 | Communication of intention to grant the patent | 06.08.2018 | Fee for grant paid | 06.08.2018 | Fee for publishing/printing paid | 06.08.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 20.06.2019 | No opposition filed within time limit [2019/35] | Fees paid | Renewal fee | 27.12.2017 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.12.2015 | AL | 19.09.2018 | CY | 19.09.2018 | CZ | 19.09.2018 | DK | 19.09.2018 | EE | 19.09.2018 | ES | 19.09.2018 | HR | 19.09.2018 | IT | 19.09.2018 | LT | 19.09.2018 | LV | 19.09.2018 | MC | 19.09.2018 | MK | 19.09.2018 | MT | 19.09.2018 | NL | 19.09.2018 | PL | 19.09.2018 | RO | 19.09.2018 | RS | 19.09.2018 | SE | 19.09.2018 | SI | 19.09.2018 | SK | 19.09.2018 | SM | 19.09.2018 | TR | 19.09.2018 | BG | 19.12.2018 | NO | 19.12.2018 | GR | 20.12.2018 | IE | 22.12.2018 | LU | 22.12.2018 | BE | 31.12.2018 | CH | 31.12.2018 | FR | 31.12.2018 | LI | 31.12.2018 | IS | 19.01.2019 | PT | 19.01.2019 | [2020/31] |
Former [2020/17] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
MT | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
TR | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IE | 22.12.2018 | ||
LU | 22.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
FR | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2020/08] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
MT | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IE | 22.12.2018 | ||
LU | 22.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
FR | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2020/04] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IE | 22.12.2018 | ||
LU | 22.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
FR | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/50] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IE | 22.12.2018 | ||
LU | 22.12.2018 | ||
BE | 31.12.2018 | ||
FR | 31.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/49] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IE | 22.12.2018 | ||
LU | 22.12.2018 | ||
FR | 31.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/48] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IE | 22.12.2018 | ||
LU | 22.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/40] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
LU | 22.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/39] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
LU | 22.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/34] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/26] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/23] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
EE | 19.09.2018 | ||
ES | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/22] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
PL | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/21] | AL | 19.09.2018 | |
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/20] | AL | 19.09.2018 | |
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
NL | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/12] | AL | 19.09.2018 | |
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/11] | HR | 19.09.2018 | |
LT | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/10] | LT | 19.09.2018 | |
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/08] | LT | 19.09.2018 | |
NO | 19.12.2018 | ||
Former [2019/07] | LT | 19.09.2018 | Documents cited: | Search | [A]JPH1026058 (MITSUBISHI HEAVY IND LTD) [A] 1* abstract *; | [Y]CA2743043 (WESTPORT POWER INC [CA]) [Y] 1-3,5,6,16,17 * paragraph [0074]; figures 1,6 *; | [Y]WO2012072881 (WAERTSILAE FINLAND OY [FI], et al) [Y] 1-3,5,6,16,17 * paragraphs [0026] - [0039]; figure 1 *; | [Y]US2014196686 (COLDREN DANA R [US], et al) [Y] 1-3,5,6,16,17 * paragraphs [0012] , [0013]; figures 3,4 *; | [Y]WO2014186893 (WESTPORT POWER INC [CA], et al) [Y] 1-3,5,6,16,17 * page 3, line 3 - page 4, line 31; figure - * | by applicant | US2799255 | EP0520659 | EP0778410 | DE102008006304 | WO2013045288 | DE102014000229 | US8800529 |