EP3110094 - 1D MODULATION AND INTERFERENCE MANAGEMENT [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 08.12.2017 Database last updated on 17.07.2024 | |
Former | The application has been published Status updated on 25.11.2016 | Most recent event Tooltip | 08.12.2017 | Application deemed to be withdrawn | published on 10.01.2018 [2018/02] | Applicant(s) | For all designated states Sequans Communications S.A. Portes de la Defense 15-55 Boulevard Charles De Gaulle 92700 Colombes / FR | [2016/52] | Inventor(s) | 01 /
MUQUET, Bertrand 6 rue de Tourville 78100 Saint-Germain en Laye / FR | 02 /
ASSOULINE, Benny Em Hamoshavot Road 94 Petach Tikvah / IL | 03 /
TOLEDANO, Ron Em Hamoshavot Road 94 Petach Tikvah / IL | [2016/52] | Representative(s) | Morrall, Jonathan Ian McLachlan, et al Kilburn & Strode LLP Lacon London 84 Theobalds Road London WC1X 8NL / GB | [N/P] |
Former [2016/52] | Morrall, Jonathan Ian McLachlan, et al Kilburn & Strode LLP 20 Red Lion Street London WC1R 4PJ / GB | Application number, filing date | 15306017.3 | 26.06.2015 | [2016/52] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3110094 | Date: | 28.12.2016 | Language: | EN | [2016/52] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.12.2015 | Classification | IPC: | H04L25/03, H04L27/00, // H04B7/08, H04L1/00 | [2016/52] | CPC: |
H04L27/0008 (EP);
H04L1/0016 (EP);
H04L1/0023 (EP);
H04L25/03006 (EP);
H04B7/0857 (EP);
H04B7/0871 (EP);
H04L1/0003 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/52] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | 1D MODULATION UND INTERFERENZVERWALTUNG | [2016/52] | English: | 1D MODULATION AND INTERFERENCE MANAGEMENT | [2016/52] | French: | MODULATION 1D ET GESTION D'INTERFÉRENCE | [2016/52] | Examination procedure | 29.06.2017 | Application deemed to be withdrawn, date of legal effect [2018/02] | 14.08.2017 | Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time [2018/02] | Fees paid | Penalty fee | Additional fee for renewal fee | 30.06.2017 | 03   M06   Not yet paid |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XI]US2015173087 (LAMPINEN KARL MARKO JUHANI [FI], et al) [X] 1-4,8-11,13-16 * paragraph [0002] - paragraph [0011] * * paragraph [0031] - paragraph [0032]; figure 1 * * paragraph [0036] - paragraph [0051] * [I] 5-7,12; | [XI]US2014198677 (XU HAO [US], et al) [X] 1,2,8,9,13-16 * paragraph [0035] - paragraph [0036]; figure 1 * * paragraph [0045] - paragraph [0053] * * paragraph [0060] - paragraph [0067] * [I] 3-7,10-12; | [XI] - BIN LI ET AL, "Adaptive Signal Dimensioning for Multi-User MIMO Downlink", VEHICULAR TECHNOLOGY CONFERENCE FALL (VTC 2010-FALL), 2010 IEEE 72ND, IEEE, PISCATAWAY, NJ, USA, (20100906), ISBN 978-1-4244-3573-9, pages 1 - 5, XP031770094 [X] 1,2,8,9,13-16 * Sections I-IV * [I] 3-7,10-12 |