Extract from the Register of European Patents

EP About this file: EP3100396

EP3100396 - PROCEDURES FOR MANAGING SECONDARY ENB (SENB) RADIO LINK FAILURE (S-RLF) IN DUAL CONNECTIVITY SCENARIOS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.03.2021
Database last updated on 26.03.2026
FormerThe patent has been granted
Status updated on  17.04.2020
FormerGrant of patent is intended
Status updated on  01.12.2019
FormerExamination is in progress
Status updated on  04.05.2018
FormerRequest for examination was made
Status updated on  04.11.2016
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
Qualcomm Incorporated
5775 Morehouse Drive
San Diego, CA 92121-1714 / US
[2016/49]
Inventor(s)01 / VAJAPEYAM, Madhavan Srinivasan
5775 Morehouse Drive
San Diego, California 92121-1714 / US
02 / HORN, Gavin Bernard
5775 Morehouse Drive
San Diego, California 92121-1714 / US
03 / DAMNJANOVIC, Jelena
5775 Morehouse Drive
San Diego, California 92121-1714 / US
04 / GAAL, Peter
5775 Morehouse Drive
San Diego, California 92121 / US
05 / DAMNJANOVIC, Aleksandar
5775 Morehouse Drive
San Diego, California 92121 / US
 [2016/49]
Representative(s)Dunlop, Hugh Christopher, et al
Maucher Jenkins
Seventh Floor Offices
Artillery House
11-19 Artillery Row
London SW1P 1RT / GB
[N/P]
Former [2016/49]Dunlop, Hugh Christopher, et al
Maucher Jenkins
26 Caxton Street
London SW1H 0RJ / GB
Application number, filing date15704656.630.01.2015
[2016/49]
WO2015US13638
Priority number, dateUS201461934258P31.01.2014         Original published format: US 201461934258 P
US20151460868829.01.2015         Original published format: US201514608688
[2016/49]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015116877
Date:06.08.2015
Language:EN
[2015/31]
Type: A1 Application with search report 
No.:EP3100396
Date:07.12.2016
Language:EN
The application published by WIPO in one of the EPO official languages on 06.08.2015 takes the place of the publication of the European patent application.
[2016/49]
Type: B1 Patent specification 
No.:EP3100396
Date:20.05.2020
Language:EN
[2020/21]
Search report(s)International search report - published on:EP06.08.2015
ClassificationIPC:H04L1/18, H04L1/20, H04L1/00, H04W76/19
[2019/51]
CPC:
H04L1/1887 (EP,KR,US); H04W76/18 (KR,US); H04L1/20 (EP,KR,US);
H04W24/04 (KR,US); H04W24/10 (KR); H04W36/08 (EP,KR,US);
H04W76/15 (EP,KR,US); H04W76/19 (EP,KR,US); H04L2001/0092 (EP,KR,US) (-)
Former IPC [2016/49]H04L1/20, H04W76/02, H04L1/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/49]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN ZUR VERWALTUNG VON SENB-FUNKVERBINDUNGSFEHLERN (S-RLF) IN DUALEN KONNEKTIVITÄTSSZENARIEN[2016/49]
English:PROCEDURES FOR MANAGING SECONDARY ENB (SENB) RADIO LINK FAILURE (S-RLF) IN DUAL CONNECTIVITY SCENARIOS[2016/49]
French:PROCÉDURES DE GESTION DE DÉFAILLANCE DE LIAISON RADIO (S-RLF) D'ENB SECONDAIRE (SENB) DANS DES SCÉNARIOS À CONNECTIVITÉ DOUBLE[2016/49]
Entry into regional phase30.06.2016National basic fee paid 
30.06.2016Designation fee(s) paid 
30.06.2016Examination fee paid 
Examination procedure30.06.2016Examination requested  [2016/49]
30.06.2016Date on which the examining division has become responsible
17.03.2017Amendment by applicant (claims and/or description)
08.05.2018Despatch of a communication from the examining division (Time limit: M04)
11.09.2018Reply to a communication from the examining division
02.12.2019Communication of intention to grant the patent
09.04.2020Fee for grant paid
09.04.2020Fee for publishing/printing paid
09.04.2020Receipt of the translation of the claim(s)
Divisional application(s)EP20173575.0  / EP3709549
Opposition(s)23.02.2021No opposition filed within time limit [2021/17]
Fees paidRenewal fee
11.11.2016Renewal fee patent year 03
08.01.2018Renewal fee patent year 04
09.01.2019Renewal fee patent year 05
10.01.2020Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL20.05.2020
AT20.05.2020
CY20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
MK20.05.2020
MT20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
TR20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
IE30.01.2021
LU30.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
[2024/41]
Former [2024/29]AL20.05.2020
AT20.05.2020
CY20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
MK20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
TR20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
IE30.01.2021
LU30.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
Former [2024/22]AL20.05.2020
AT20.05.2020
CY20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
MK20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
IE30.01.2021
LU30.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
Former [2023/30]AL20.05.2020
AT20.05.2020
CY20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
IE30.01.2021
LU30.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
Former [2022/33]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
IE30.01.2021
LU30.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
Former [2022/07]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
IE30.01.2021
LU30.01.2021
CH31.01.2021
LI31.01.2021
Former [2021/52]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
LU30.01.2021
CH31.01.2021
LI31.01.2021
Former [2021/43]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
LU30.01.2021
Former [2021/40]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/24]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/10]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/09]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/08]AL20.05.2020
DK20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/04]AL20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
RS20.05.2020
SE20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/01]HR20.05.2020
LT20.05.2020
LV20.05.2020
RS20.05.2020
SE20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/51]HR20.05.2020
LT20.05.2020
LV20.05.2020
RS20.05.2020
SE20.05.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/50]HR20.05.2020
LT20.05.2020
LV20.05.2020
SE20.05.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/48]LT20.05.2020
SE20.05.2020
NO20.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/47]LT20.05.2020
NO20.08.2020
IS20.09.2020
Former [2020/46]IS20.09.2020
Cited inInternational search[XI] WO2010104334  (LG ELECTRONICS INC et al.) [X] 1-6,15,16,20,21,30 * paragraph [0048] - paragraph [0064] * * figures 6, 7 *[I] 7-9,17,18
 [XI] WO2012139798  (ERICSSON TELEFON AB L M et al.) [X] 1-4,15,16,30 * page 5, line 9 - page 24, line 6 * * figures 1-3 *[I] 7
 [A] WO2013009892  (INTERDIGITAL PATENT HOLDINGS et al.) [A] 1-30 * paragraph [0173] - paragraph [0175] *
 [XAYI]   CATT ET AL: "RLM considerations for dual connectivity", vol. RAN WG2, no. San Francisco, USA, 13 November 2013 (2013-11-13), XP050736857, Retrieved from the Internet [retrieved on 20131113] [X] 1-8,15-17,20,21,24,28,30 * the whole document *[A] 11-14,22,23 [Y] 9,10,18,19,25-27 [I] 29
 [Y]   "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Control (RRC); Protocol specification (Release 12)", 3GPP STANDARD; 3GPP TS 36.331, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. V12.0.0, 7 January 2014 (2014-01-07), pages 1 - 349, XP050729407 [Y] 9,10,18,19,25-27 * section 5.3.5 *
 [XAI]   KYOCERA: "RLF issues in inter-eNB CA", vol. RAN WG2, no. San Francisco; 20131111 - 20131115, 13 November 2013 (2013-11-13), XP050737042, Retrieved from the Internet [retrieved on 20131113] [X] 1,15,16,24,28,30 * the whole document *[A] 8-14,17-19,22,23,25-27 [I] 2-7,20,21,29
 [XAI]   INTEL CORPORATION: "Radio link failure handling for dual connectivity", vol. RAN WG2, no. San Francisco, USA; 20131111 - 20131115, 13 November 2013 (2013-11-13), XP050737010, Retrieved from the Internet [retrieved on 20131113] [X] 1,15,16,24,28,30 * the whole document *[A] 8-14,17-19,22,23,25-27 [I] 2-7,20,21,29
ExaminationWO2015022986
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.