| EP3100396 - PROCEDURES FOR MANAGING SECONDARY ENB (SENB) RADIO LINK FAILURE (S-RLF) IN DUAL CONNECTIVITY SCENARIOS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.03.2021 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 17.04.2020 | ||
| Former | Grant of patent is intended Status updated on 01.12.2019 | ||
| Former | Examination is in progress Status updated on 04.05.2018 | ||
| Former | Request for examination was made Status updated on 04.11.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2016/49] | Inventor(s) | 01 /
VAJAPEYAM, Madhavan Srinivasan 5775 Morehouse Drive San Diego, California 92121-1714 / US | 02 /
HORN, Gavin Bernard 5775 Morehouse Drive San Diego, California 92121-1714 / US | 03 /
DAMNJANOVIC, Jelena 5775 Morehouse Drive San Diego, California 92121-1714 / US | 04 /
GAAL, Peter 5775 Morehouse Drive San Diego, California 92121 / US | 05 /
DAMNJANOVIC, Aleksandar 5775 Morehouse Drive San Diego, California 92121 / US | [2016/49] | Representative(s) | Dunlop, Hugh Christopher, et al Maucher Jenkins Seventh Floor Offices Artillery House 11-19 Artillery Row London SW1P 1RT / GB | [N/P] |
| Former [2016/49] | Dunlop, Hugh Christopher, et al Maucher Jenkins 26 Caxton Street London SW1H 0RJ / GB | Application number, filing date | 15704656.6 | 30.01.2015 | [2016/49] | WO2015US13638 | Priority number, date | US201461934258P | 31.01.2014 Original published format: US 201461934258 P | US201514608688 | 29.01.2015 Original published format: US201514608688 | [2016/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015116877 | Date: | 06.08.2015 | Language: | EN | [2015/31] | Type: | A1 Application with search report | No.: | EP3100396 | Date: | 07.12.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.08.2015 takes the place of the publication of the European patent application. | [2016/49] | Type: | B1 Patent specification | No.: | EP3100396 | Date: | 20.05.2020 | Language: | EN | [2020/21] | Search report(s) | International search report - published on: | EP | 06.08.2015 | Classification | IPC: | H04L1/18, H04L1/20, H04L1/00, H04W76/19 | [2019/51] | CPC: |
H04L1/1887 (EP,KR,US);
H04W76/18 (KR,US);
H04L1/20 (EP,KR,US);
H04W24/04 (KR,US);
H04W24/10 (KR);
H04W36/08 (EP,KR,US);
|
| Former IPC [2016/49] | H04L1/20, H04W76/02, H04L1/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/49] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR VERWALTUNG VON SENB-FUNKVERBINDUNGSFEHLERN (S-RLF) IN DUALEN KONNEKTIVITÄTSSZENARIEN | [2016/49] | English: | PROCEDURES FOR MANAGING SECONDARY ENB (SENB) RADIO LINK FAILURE (S-RLF) IN DUAL CONNECTIVITY SCENARIOS | [2016/49] | French: | PROCÉDURES DE GESTION DE DÉFAILLANCE DE LIAISON RADIO (S-RLF) D'ENB SECONDAIRE (SENB) DANS DES SCÉNARIOS À CONNECTIVITÉ DOUBLE | [2016/49] | Entry into regional phase | 30.06.2016 | National basic fee paid | 30.06.2016 | Designation fee(s) paid | 30.06.2016 | Examination fee paid | Examination procedure | 30.06.2016 | Examination requested [2016/49] | 30.06.2016 | Date on which the examining division has become responsible | 17.03.2017 | Amendment by applicant (claims and/or description) | 08.05.2018 | Despatch of a communication from the examining division (Time limit: M04) | 11.09.2018 | Reply to a communication from the examining division | 02.12.2019 | Communication of intention to grant the patent | 09.04.2020 | Fee for grant paid | 09.04.2020 | Fee for publishing/printing paid | 09.04.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20173575.0 / EP3709549 | Opposition(s) | 23.02.2021 | No opposition filed within time limit [2021/17] | Fees paid | Renewal fee | 11.11.2016 | Renewal fee patent year 03 | 08.01.2018 | Renewal fee patent year 04 | 09.01.2019 | Renewal fee patent year 05 | 10.01.2020 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 20.05.2020 | AT | 20.05.2020 | CY | 20.05.2020 | CZ | 20.05.2020 | DK | 20.05.2020 | EE | 20.05.2020 | HR | 20.05.2020 | LT | 20.05.2020 | LV | 20.05.2020 | MC | 20.05.2020 | MK | 20.05.2020 | MT | 20.05.2020 | PL | 20.05.2020 | RO | 20.05.2020 | RS | 20.05.2020 | SE | 20.05.2020 | SI | 20.05.2020 | SK | 20.05.2020 | SM | 20.05.2020 | TR | 20.05.2020 | BG | 20.08.2020 | NO | 20.08.2020 | GR | 21.08.2020 | IS | 20.09.2020 | PT | 21.09.2020 | IE | 30.01.2021 | LU | 30.01.2021 | BE | 31.01.2021 | CH | 31.01.2021 | LI | 31.01.2021 | [2024/41] |
| Former [2024/29] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CY | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| MK | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| TR | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| IE | 30.01.2021 | ||
| LU | 30.01.2021 | ||
| BE | 31.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| Former [2024/22] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CY | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| MK | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| IE | 30.01.2021 | ||
| LU | 30.01.2021 | ||
| BE | 31.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| Former [2023/30] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CY | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| IE | 30.01.2021 | ||
| LU | 30.01.2021 | ||
| BE | 31.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| Former [2022/33] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| IE | 30.01.2021 | ||
| LU | 30.01.2021 | ||
| BE | 31.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| Former [2022/07] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| IE | 30.01.2021 | ||
| LU | 30.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| Former [2021/52] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| LU | 30.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| Former [2021/43] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| LU | 30.01.2021 | ||
| Former [2021/40] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| MC | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2021/24] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SI | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2021/10] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| PL | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SK | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2021/09] | AL | 20.05.2020 | |
| AT | 20.05.2020 | ||
| CZ | 20.05.2020 | ||
| DK | 20.05.2020 | ||
| EE | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2021/08] | AL | 20.05.2020 | |
| DK | 20.05.2020 | ||
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| RO | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| SM | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2021/04] | AL | 20.05.2020 | |
| HR | 20.05.2020 | ||
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2021/01] | HR | 20.05.2020 | |
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| BG | 20.08.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2020/51] | HR | 20.05.2020 | |
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| RS | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2020/50] | HR | 20.05.2020 | |
| LT | 20.05.2020 | ||
| LV | 20.05.2020 | ||
| SE | 20.05.2020 | ||
| NO | 20.08.2020 | ||
| GR | 21.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2020/48] | LT | 20.05.2020 | |
| SE | 20.05.2020 | ||
| NO | 20.08.2020 | ||
| IS | 20.09.2020 | ||
| PT | 21.09.2020 | ||
| Former [2020/47] | LT | 20.05.2020 | |
| NO | 20.08.2020 | ||
| IS | 20.09.2020 | ||
| Former [2020/46] | IS | 20.09.2020 | Cited in | International search | [XI] WO2010104334 (LG ELECTRONICS INC et al.) [X] 1-6,15,16,20,21,30 * paragraph [0048] - paragraph [0064] * * figures 6, 7 *[I] 7-9,17,18 | [XI] WO2012139798 (ERICSSON TELEFON AB L M et al.) [X] 1-4,15,16,30 * page 5, line 9 - page 24, line 6 * * figures 1-3 *[I] 7 | [A] WO2013009892 (INTERDIGITAL PATENT HOLDINGS et al.) [A] 1-30 * paragraph [0173] - paragraph [0175] * | [XAYI] CATT ET AL: "RLM considerations for dual connectivity", vol. RAN WG2, no. San Francisco, USA, 13 November 2013 (2013-11-13), XP050736857, Retrieved from the Internet | [Y] "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Control (RRC); Protocol specification (Release 12)", 3GPP STANDARD; 3GPP TS 36.331, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. V12.0.0, 7 January 2014 (2014-01-07), pages 1 - 349, XP050729407 [Y] 9,10,18,19,25-27 * section 5.3.5 * | [XAI] KYOCERA: "RLF issues in inter-eNB CA", vol. RAN WG2, no. San Francisco; 20131111 - 20131115, 13 November 2013 (2013-11-13), XP050737042, Retrieved from the Internet | [XAI] INTEL CORPORATION: "Radio link failure handling for dual connectivity", vol. RAN WG2, no. San Francisco, USA; 20131111 - 20131115, 13 November 2013 (2013-11-13), XP050737010, Retrieved from the Internet | Examination | WO2015022986 |