Extract from the Register of European Patents

EP About this file: EP3130018

EP3130018 - PROCESS AND DEVICE FOR APPLYING A SELF-ADHESIVE FILM ON A BATTERY CELL [Right-click to bookmark this link]
Former [2017/07]METHOD AND APPARATUS FOR APPLYING A SELF-ADHESIVE FILM TO AN ELECTRICAL ENERGY STORAGE CELL
[2020/03]
StatusNo opposition filed within time limit
Status updated on  12.03.2021
Database last updated on 10.03.2026
FormerThe patent has been granted
Status updated on  03.04.2020
FormerGrant of patent is intended
Status updated on  23.01.2020
FormerExamination is in progress
Status updated on  09.11.2018
FormerRequest for examination was made
Status updated on  13.01.2017
Most recent event   Tooltip19.12.2025Lapse of the patent in a contracting state
New state(s): TR
published on 21.01.2026  [2026/04]
Applicant(s)For all designated states
Bayerische Motoren Werke Aktiengesellschaft
Petuelring 130
80809 München / DE
[2017/07]
Inventor(s)01 / WÖHRLE, Thomas
Pfitznerstrasse 13
80807 München / DE
02 / OGIHARA, Hideki
Am Amperberg 6
85778 Haimhausen / DE
03 / ZEILINGER, Tobias
Hohenzollernstrasse 44
80801 München / DE
 [2017/07]
Representative(s)Diener, Reinhold Jürgen
Bayerische Motoren Werke AG
Patentabteilung AJ-5
80788 München / DE
[2017/07]
Application number, filing date15707301.612.02.2015
[2017/07]
WO2015EP52907
Priority number, dateDE20141020689010.04.2014         Original published format: DE102014206890
[2017/07]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2015154899
Date:15.10.2015
Language:DE
[2015/41]
Type: A1 Application with search report 
No.:EP3130018
Date:15.02.2017
Language:DE
The application published by WIPO in one of the EPO official languages on 15.10.2015 takes the place of the publication of the European patent application.
[2017/07]
Type: B1 Patent specification 
No.:EP3130018
Date:06.05.2020
Language:DE
[2020/19]
Search report(s)International search report - published on:EP15.10.2015
ClassificationIPC:H01M2/02, H01M10/04, H01M10/058
[2017/07]
CPC:
H01M10/058 (EP,KR,US); H01M50/116 (KR); H01M10/0583 (KR,US);
B29C63/04 (KR,US); H01M10/0525 (KR,US); H01M10/0587 (KR,US);
H01M50/103 (EP,KR,US); H01M50/119 (EP,KR,US); H01M50/122 (EP,KR,US);
H01M50/124 (KR,US); H01M50/133 (EP,KR,US); H01M50/20 (KR);
B29K2023/06 (KR,US); B29K2067/00 (KR,US); B29K2105/0097 (KR,US);
B29L2031/3468 (KR,US); H01M2220/20 (KR,US); Y02E60/10 (EP,KR);
Y02P70/50 (EP,KR) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/07]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUM AUFBRINGEN EINES SELBSTHAFTENDEN FILMS AUF EINE ELEKTRISCHE ENERGIESPEICHERZELLE[2020/03]
English:PROCESS AND DEVICE FOR APPLYING A SELF-ADHESIVE FILM ON A BATTERY CELL[2020/03]
French:PROCÉDÉ ET APPAREILLAGE POUR L'APPLICATION D'UNE COUCHE AUTOADHÉSIVE SUR UNE CELLULE DE STOCKAGE D'ENERGIE ÉLECTRIQUE[2020/03]
Former [2017/07]VERFAHREN UND VORRICHTUNG ZUM AUFBRINGEN EINEN SELBSTHAFTENDEN FILM AUF EINE ELEKTRISCHEN ENERGIESPEICHERZELLE
Former [2017/07]METHOD AND APPARATUS FOR APPLYING A SELF-ADHESIVE FILM TO AN ELECTRICAL ENERGY STORAGE CELL
Former [2017/07]PROCÉDÉ ET DISPOSITIF D'APPLICATION D'UN FILM AUTO-ADHÉSIF SUR UN ÉLÉMENT ACCUMULATEUR D'ÉNERGIE ÉLECTRIQUE
Entry into regional phase28.09.2016National basic fee paid 
28.09.2016Designation fee(s) paid 
28.09.2016Examination fee paid 
Examination procedure28.09.2016Examination requested  [2017/07]
28.09.2016Date on which the examining division has become responsible
05.04.2017Amendment by applicant (claims and/or description)
12.11.2018Despatch of a communication from the examining division (Time limit: M02)
16.01.2019Reply to a communication from the examining division
24.01.2020Communication of intention to grant the patent
25.03.2020Fee for grant paid
25.03.2020Fee for publishing/printing paid
25.03.2020Receipt of the translation of the claim(s)
Opposition(s)09.02.2021No opposition filed within time limit [2021/15]
Fees paidRenewal fee
27.02.2017Renewal fee patent year 03
27.02.2018Renewal fee patent year 04
27.02.2019Renewal fee patent year 05
24.02.2020Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.02.2015
AL06.05.2020
CY06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
MK06.05.2020
MT06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
TR06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
[2026/04]
Former [2024/41]HU12.02.2015
AL06.05.2020
CY06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
MK06.05.2020
MT06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2024/22]HU12.02.2015
AL06.05.2020
CY06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
MK06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2023/30]HU12.02.2015
AL06.05.2020
CY06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2023/27]HU12.02.2015
AL06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/41]AL06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/24]AL06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/10]AL06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/09]AL06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/08]AL06.05.2020
DK06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/04]AL06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
RS06.05.2020
SE06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/01]FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
RS06.05.2020
SE06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/51]FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
RS06.05.2020
SE06.05.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/50]FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
SE06.05.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/48]FI06.05.2020
LT06.05.2020
SE06.05.2020
NO06.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/47]LT06.05.2020
NO06.08.2020
IS06.09.2020
Former [2020/46]IS06.09.2020
Cited inInternational search[XI] GB2056401  (REED INTERNATIONAL LTD et al.) [X] 12 * vgl. insbesonders Figur 14 aber auch Figuren 1-13 und Ans prüche 1-12. *[I] 12
 [XY] DE102011084692  (ASKEY COMPUTER CORP et al.) [X] 1,13,14 * (vgl. Anspruch 1 und Figur 1 Schicht 32 sowie Spalte 2, Zeile 45 bis Spalte 3, Zeile 5). vgl insbesonders Zeilen 65-66 der Spalte 2 *[Y] 1-11,13,14
 [XY] WO2012120443  (PANACIS INC et al.) [X] 1,2,5,9,13,14 * vgl. Paragraphen [44] und [54], sowie Paragraphen [55] bis [63] und Ansprüche 1 bis 20. Vgl. Item 203 sowie Figur 4 und Absätzen [0042]-[004] *[Y] 1-11,13,14
 [XY] DE102008061011  (CONTI TEMIC MICROELECTRONIC et al.) [X] 1,2,5,9,13,14 * vgl. Ansprüche 1 und 2 sowie Absatz [0017]und Figure 1. *[Y] 1-11,13,14
 [Y] US2012202051  (ISEKI TORU et al.) [Y] 1-11,13,14 * vgl. insbesonders Absatz [0002] sowie Absätze [0055],[0088]-[0090] und Ansprüche 1-8 *
 [Y] US2011008672  (KIM DAEKYU et al.) [Y] 1-11,13,14 * Vgl. Fig. 2,3, Items 50, 51,52; vgl Absätze [0010]-[0018], [0045]-[0055], [0060]-[0077];vgl Ansprüche 1-25 *
 [Y] US2007154787  (JANG SEOK G et al.) [Y] 1-11,13,14 * Vgl. Figur 1, Item 120; vgl. Figure 2A, 2B Item 220; vgl. Figur 4; Item 420; vgl. Figure 6A, 6 B Items 620,621,622;vgl. Ansprüche 1-34 *
 [Y] US2012115025  (KIM SUNG-JONG et al.) [Y] 1-11,13,14 * vgl. Figuren 5,6 Item 120 sowie Figur 11, Item 100; Absätze [0066]-[0070], [0081]-[0085] und [0101]; Vgl. auch Ansprüche 1-21; *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.