EP3266238 - ADAPTIVE SECTOR CONFIGURATION OF AN ADAPTIVE ANTENNA SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.09.2021 Database last updated on 29.10.2024 | |
Former | The patent has been granted Status updated on 25.09.2020 | ||
Former | Grant of patent is intended Status updated on 18.09.2020 | ||
Former | Examination is in progress Status updated on 13.07.2020 | ||
Former | Grant of patent is intended Status updated on 17.05.2020 | ||
Former | Examination is in progress Status updated on 19.10.2018 | ||
Former | Request for examination was made Status updated on 08.12.2017 | ||
Former | The international publication has been made Status updated on 07.08.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2018/02] | Inventor(s) | 01 /
FAXÉR, Sebastian Frihetsvägen 33 S-177 53 Järfälla / SE | 02 /
ZETTERBERG, Kristina Kanongatan 13 S-587 52 Linköping / SE | 03 /
RAMACHANDRA, Pradeepa Lantmannagatan 116 S-583 32 Linköping / SE | [2018/02] | Representative(s) | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | [2018/02] | Application number, filing date | 15707372.7 | 03.03.2015 | [2018/02] | WO2015EP54332 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016138934 | Date: | 09.09.2016 | Language: | EN | [2016/36] | Type: | A1 Application with search report | No.: | EP3266238 | Date: | 10.01.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 09.09.2016 takes the place of the publication of the European patent application. | [2018/02] | Type: | B1 Patent specification | No.: | EP3266238 | Date: | 28.10.2020 | Language: | EN | [2020/44] | Search report(s) | International search report - published on: | EP | 09.09.2016 | Classification | IPC: | H04W16/18, H04W24/02, H04W24/08 | [2020/24] | CPC: |
H04W16/18 (EP,US);
H04W16/28 (CN,US);
H04W24/02 (EP,CN,US);
H04W24/08 (EP,US);
H04W72/046 (US)
|
Former IPC [2018/02] | H04W16/28, H04W24/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | ADAPTIVE SEKTORENKONFIGURATION EINES ADAPTIVEN ANTENNENSYSTEMS | [2018/02] | English: | ADAPTIVE SECTOR CONFIGURATION OF AN ADAPTIVE ANTENNA SYSTEM | [2018/02] | French: | CONFIGURATION DE SECTEUR ADAPTATIF D'UN SYSTÈME D'ANTENNE ADAPTATIVE | [2018/02] | Entry into regional phase | 07.08.2017 | National basic fee paid | 07.08.2017 | Designation fee(s) paid | 07.08.2017 | Examination fee paid | Examination procedure | 07.08.2017 | Examination requested [2018/02] | 07.08.2017 | Date on which the examining division has become responsible | 26.02.2018 | Amendment by applicant (claims and/or description) | 23.10.2018 | Despatch of a communication from the examining division (Time limit: M04) | 15.02.2019 | Reply to a communication from the examining division | 25.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 04.10.2019 | Reply to a communication from the examining division | 18.05.2020 | Communication of intention to grant the patent | 08.07.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 08.07.2020 | Fee for grant paid | 08.07.2020 | Fee for publishing/printing paid | 17.09.2020 | Information about intention to grant a patent | 17.09.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 29.07.2021 | No opposition filed within time limit [2021/40] | Fees paid | Renewal fee | 07.08.2017 | Renewal fee patent year 03 | 27.03.2018 | Renewal fee patent year 04 | 27.03.2019 | Renewal fee patent year 05 | 27.03.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.03.2015 | AL | 28.10.2020 | AT | 28.10.2020 | CY | 28.10.2020 | CZ | 28.10.2020 | DK | 28.10.2020 | EE | 28.10.2020 | ES | 28.10.2020 | FI | 28.10.2020 | HR | 28.10.2020 | IT | 28.10.2020 | LT | 28.10.2020 | LV | 28.10.2020 | MC | 28.10.2020 | MK | 28.10.2020 | MT | 28.10.2020 | NL | 28.10.2020 | PL | 28.10.2020 | RO | 28.10.2020 | RS | 28.10.2020 | SE | 28.10.2020 | SI | 28.10.2020 | SK | 28.10.2020 | SM | 28.10.2020 | BG | 28.01.2021 | NO | 28.01.2021 | GR | 29.01.2021 | IS | 28.02.2021 | PT | 01.03.2021 | IE | 03.03.2021 | LU | 03.03.2021 | BE | 31.03.2021 | CH | 31.03.2021 | LI | 31.03.2021 | [2024/42] |
Former [2024/22] | HU | 03.03.2015 | |
AL | 28.10.2020 | ||
AT | 28.10.2020 | ||
CY | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
MK | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
IE | 03.03.2021 | ||
LU | 03.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2023/33] | HU | 03.03.2015 | |
AL | 28.10.2020 | ||
AT | 28.10.2020 | ||
CY | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
IE | 03.03.2021 | ||
LU | 03.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2023/30] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CY | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
IE | 03.03.2021 | ||
LU | 03.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/34] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
IE | 03.03.2021 | ||
LU | 03.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/23] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
IE | 03.03.2021 | ||
LU | 03.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/10] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
PT | 01.03.2021 | ||
IE | 03.03.2021 | ||
LU | 03.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/09] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
IE | 03.03.2021 | ||
LU | 03.03.2021 | ||
Former [2022/07] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
IE | 03.03.2021 | ||
Former [2021/50] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SI | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/48] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
IT | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/45] | AL | 28.10.2020 | |
AT | 28.10.2020 | ||
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
MC | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/37] | AT | 28.10.2020 | |
CZ | 28.10.2020 | ||
DK | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/36] | AT | 28.10.2020 | |
CZ | 28.10.2020 | ||
EE | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/35] | AT | 28.10.2020 | |
CZ | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RO | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SK | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/34] | AT | 28.10.2020 | |
CZ | 28.10.2020 | ||
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/33] | AT | 28.10.2020 | |
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LT | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/32] | AT | 28.10.2020 | |
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
SM | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/28] | AT | 28.10.2020 | |
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
HR | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/25] | AT | 28.10.2020 | |
ES | 28.10.2020 | ||
FI | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
PL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
IS | 28.02.2021 | ||
PT | 01.03.2021 | ||
Former [2021/23] | AT | 28.10.2020 | |
FI | 28.10.2020 | ||
LV | 28.10.2020 | ||
NL | 28.10.2020 | ||
RS | 28.10.2020 | ||
SE | 28.10.2020 | ||
BG | 28.01.2021 | ||
NO | 28.01.2021 | ||
GR | 29.01.2021 | ||
PT | 01.03.2021 | ||
Former [2021/22] | FI | 28.10.2020 | |
NL | 28.10.2020 | ||
RS | 28.10.2020 | ||
NO | 28.01.2021 | ||
PT | 01.03.2021 | ||
Former [2021/21] | FI | 28.10.2020 | |
NL | 28.10.2020 | ||
PT | 01.03.2021 | ||
Former [2021/20] | FI | 28.10.2020 | Cited in | International search | [XYI]US2013235807 (LEE JUNG AH [US], et al) [X] 1-6,8,13,15-18,20-24 * page 3, paragraph 29 - page 7, paragraph 54 * [Y] 7,9-12 [I] 14,19; | [YA] - CEM U SARAYDAR ET AL, "Adaptive Cell Sectorization for CDMA Systems", IEEE JOURNAL ON SELECTED AREAS IN COMMUNICATIONS, IEEE SERVICE CENTER, PISCATAWAY, US, (20010601), vol. 19, no. 6, ISSN 0733-8716, XP011055395 [Y] 7,9-12 * abstract * * INTRODUCTION; page 1041, paragraph I - page 1042 * * Physical Constraints; page 1046, paragraph E - page 1047 * [A] 2-6,8,13-24 | [A] - LG ELECTRONICS INC, "Further consideration on cell shaping", vol. RAN WG3, no. Athens, Greece; 20151109 - 20151113, (20150208), 3GPP DRAFT; R3-150262 FURTHER CONSIDERATION ON CELL SHAPING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN3/Docs/, (20150208), XP050937014 [A] 1-24 * Discussion; page 1, paragraph 2 - page 2 * | [AD] - NOKIA NETWORKS, "Load information enhancements for AAS reconfiguration decisions", vol. RAN WG3, no. San Francisco, USA; 20141117 - 20141121, (20141117), 3GPP DRAFT; R3-142715 SON_LOADINFO, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN3/Docs/, (20141117), XP050877852 [AD] 1-24 * Discussion; page 1, paragraph 2 - page 2 * |