EP3113932 - COMPOSITE RIVET BLANK AND INSTALLATION THEREOF [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 09.10.2020 Database last updated on 13.11.2024 | |
Former | Examination is in progress Status updated on 07.06.2019 | ||
Former | Request for examination was made Status updated on 09.12.2016 | ||
Former | The international publication has been made Status updated on 09.11.2016 | Most recent event Tooltip | 09.10.2020 | Application deemed to be withdrawn | published on 11.11.2020 [2020/46] | Applicant(s) | For all designated states Bombardier Inc. 400 Chemin de la Côte-Vertu Ouest Dorval, QC H4S 1Y9 / CA | For:MT
Short Brothers Plc Airport Road Belfast, Antrim BT3 9DZ / GB | [2017/02] | Inventor(s) | 01 /
TRUDEAU, Paul 173 Waterloo Avenue Guelph, Ontario N1H 3J2 / CA | 02 /
LABERGE LEBEL, Louis 23-102 St-Joseph Boulevard East Montreal, Québec H2T 1H3 / CA | 03 /
LANDRY, Alain 448 Greenwood Drive Beaconsfield, Québec H9W 4Z9 / CA | 04 /
HOSTE, Didier 1539 Croissant Nelligan Mascouche, Québec J7K 3N8 / CA | [2017/02] | Representative(s) | HGF HGF Limited 1 City Walk Leeds LS11 9DX / GB | [N/P] |
Former [2017/02] | McKechnie, Neil Henry HGF Limited Delta House 50 West Nile Street Glasgow G1 2NP / GB | Application number, filing date | 15712427.2 | 06.03.2015 | [2017/02] | WO2015IB51651 | Priority number, date | US201461949449P | 07.03.2014 Original published format: US 201461949449 P | [2017/02] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015132766 | Date: | 11.09.2015 | Language: | EN | [2015/36] | Type: | A1 Application with search report | No.: | EP3113932 | Date: | 11.01.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.09.2015 takes the place of the publication of the European patent application. | [2017/02] | Search report(s) | International search report - published on: | EP | 11.09.2015 | Classification | IPC: | B29C65/60, F16B5/04, F16B19/06, B21J15/08, B21J15/36, B29C65/18, B29C65/78 | [2017/02] | CPC: |
B29C70/461 (EP);
B29C65/605 (US);
B21J15/147 (EP,US);
B29C65/18 (EP,US);
B29C65/32 (EP,US);
B29C65/601 (EP,US);
B29C65/7841 (EP,US);
B29C66/1122 (EP,US);
B29C66/21 (EP,US);
B29C66/43 (EP,US);
B29C66/721 (EP,US);
B29C66/7422 (EP,US);
B29C66/81431 (EP,US);
B29C66/8181 (US);
B29C66/81811 (EP,US);
B29C66/81812 (EP,US);
B29C66/8223 (EP,US);
B29C66/8242 (EP,US);
B29C66/83221 (EP,US);
B29C70/24 (EP,US);
B29C70/845 (EP,US);
F16B19/06 (EP,US);
F16B5/04 (EP,US);
B29C65/30 (EP,US);
B29C66/71 (EP,US);
B29C66/7212 (EP,US);
B29C66/72141 (EP,US);
B29C66/81423 (EP,US);
B29C70/462 (EP,US);
B29K2101/12 (EP,US);
B29K2105/06 (EP,US);
B29K2307/04 (EP,US);
B29K2995/0027 (EP,US);
B29K2995/0077 (EP,US);
B29L2031/3002 (EP,US);
B29L2031/3082 (EP,US);
| C-Set: |
B29C66/71, B29K2071/00 (EP,US);
B29C66/71, B29K2077/00 (EP,US);
B29C66/71, B29K2079/085 (US,EP);
B29C66/71, B29K2081/04 (US,EP); | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/02] | Title | German: | ZUSAMMENGESETZTER NIETROHLING UND INSTALLATION DAVON | [2017/02] | English: | COMPOSITE RIVET BLANK AND INSTALLATION THEREOF | [2017/02] | French: | ÉBAUCHE DE RIVET COMPOSITE ET SON INSTALLATION | [2017/02] | Entry into regional phase | 26.08.2016 | National basic fee paid | 26.08.2016 | Designation fee(s) paid | 26.08.2016 | Examination fee paid | Examination procedure | 26.08.2016 | Examination requested [2017/02] | 26.08.2016 | Date on which the examining division has become responsible | 27.04.2017 | Amendment by applicant (claims and/or description) | 12.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 11.10.2019 | Reply to a communication from the examining division | 06.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 17.06.2020 | Application deemed to be withdrawn, date of legal effect [2020/46] | 07.07.2020 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time [2020/46] | Fees paid | Renewal fee | 24.03.2017 | Renewal fee patent year 03 | 23.03.2018 | Renewal fee patent year 04 | 26.03.2019 | Renewal fee patent year 05 | 24.03.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | International search | [X]GB326147 (FERODO SA) [X] 1,14,19,26,32,34,40 * page 1, lines 46-105 *; | [X]DE623911 (SIEMENS AG) [X] 40-42,44,46,48-50* page 1, line 55 - page 2, line 2; figure 2 *; | [XI]US2685813 (LAMPMAN JAMES A, et al) [X] 14,18,26,28,30,32,34-36,38,40-42,44,45 * the whole document * [I] 46; | [X]GB1193782 (KOPPERS CO INC [US]) [X] 40-42,44,46,48,49 * figures 3,4,5 * * page 2, line 50 - page 3, line 6 *; | [X]AU3984772 (RHEEM AUSTRALIA PTY LTD) [X] 40-42,44,46,48-50 * figures 1,2 * * pages 4,5 * * claims 1-9 *; | [X]US4736507 (BERECZ IMRE [US], et al) [X] 46,48 * abstract * * pages 1-6 *; | [X]US5314282 (MURPHY GUY C [US], et al) [X] 40-42,44-46,48,49 * abstract * * figures 12,13 * * column 4, line 64 - column 6, line 29 *; | [XI]EP1508429 (ALCAN TECH & MAN LTD [CH]) [X] 1-7,10,12,14-19,23,25-30,32-38,40-42,45 * abstract * * figures 1-6 * * paragraphs [0003] , [0 26] - [0032] - [0 36] , [0 75] * [I] 2,8,9,11,13,20-22,24,31,39,43,44; | [XI]US2012124816 (BERGER ELISABETH J [US], et al) [X] 1-7,14-19,26-30,32,34-38,40-44,46,47,49,50 * abstract * * figures 2,3,10,11 * * paragraphs [0054] , [0 65] - [0069] * * claims 1-13 * [I] 8-13,20-25,31,39,48,51,52; | [XI]FR2974867 (AIRBUS OPERATIONS SAS [FR]) [X] 1-7,13-20,26-42,44,46-49 * abstract * * figures 1-6 * * pages 5-10 * [I] 8-11,21-24 | Examination | US4659268 |