EP3107682 - X-RAY WELDMENT CONTROL METHOD [Right-click to bookmark this link] | |||
Former [2016/52] | METHOD FOR INSPECTING A WELD BY RADIOGRAPHY | ||
[2017/52] | Status | No opposition filed within time limit Status updated on 15.02.2019 Database last updated on 10.07.2024 | |
Former | The patent has been granted Status updated on 09.03.2018 | ||
Former | Grant of patent is intended Status updated on 05.12.2017 | ||
Former | Request for examination was made Status updated on 25.11.2016 | ||
Former | The international publication has been made Status updated on 16.11.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Beweis 56 Avenue des Caniers Bât. C 13400 Aubagne / FR | [2016/52] | Inventor(s) | 01 /
CATONIO, Jacky Chemin du Jonquier F-83170 Tourves / FR | 02 /
CROZET, Sylvain 173 Route de Notre Dame de la Garde F-13600 La Ciotat / FR | 03 /
VALANSI, Jérémy 53Bis Route de Lambesc F-13330 Pelissanne / FR | [2016/52] | Representative(s) | Roman, Alexis SPE Roman-Andre 35 rue Paradis B.P. 30064 13484 Marseille / FR | [N/P] |
Former [2018/15] | Roman, Alexis Cabinet Roman 35 rue Paradis B.P. 30064 13484 Marseille Cedex 20 / FR | ||
Former [2016/52] | Roman, Alexis Cabinet Roman 35, rue Paradis B.P. 30064 13484 Marseille Cedex 20 / FR | Application number, filing date | 15713200.2 | 19.02.2015 | [2016/52] | WO2015FR50400 | Priority number, date | FR20140051391 | 21.02.2014 Original published format: FR 1451391 | [2016/52] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2015124870 | Date: | 27.08.2015 | Language: | FR | [2015/34] | Type: | A1 Application with search report | No.: | EP3107682 | Date: | 28.12.2016 | Language: | FR | The application published by WIPO in one of the EPO official languages on 27.08.2015 takes the place of the publication of the European patent application. | [2016/52] | Type: | B1 Patent specification | No.: | EP3107682 | Date: | 11.04.2018 | Language: | FR | [2018/15] | Search report(s) | International search report - published on: | EP | 27.08.2015 | Classification | IPC: | B23K31/12, G03B42/04 | [2016/52] | CPC: |
B23K31/125 (EP);
G01N23/04 (CN);
G03B42/028 (EP);
G03B42/047 (EP);
G06K17/00 (CN);
B23K2101/06 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/52] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR ÜBERPRÜFUNG EINER SCHWEISSUNG MITTELS RÖNTGENOGRAPHIE | [2017/52] | English: | X-RAY WELDMENT CONTROL METHOD | [2017/52] | French: | PROCEDE POUR CONTROLER UNE SOUDURE PAR RADIOGRAPHIE | [2016/52] |
Former [2016/52] | VERFAHREN ZUR INSPEKTION EINES BRUNNENS MITTELS RADIOGRAFIE | ||
Former [2016/52] | METHOD FOR INSPECTING A WELD BY RADIOGRAPHY | Entry into regional phase | 28.09.2016 | National basic fee paid | 28.09.2016 | Designation fee(s) paid | 28.09.2016 | Examination fee paid | Examination procedure | 28.09.2016 | Examination requested [2016/52] | 28.09.2016 | Date on which the examining division has become responsible | 06.12.2017 | Communication of intention to grant the patent | 01.02.2018 | Receipt of the translation of the claim(s) | 15.02.2018 | Fee for grant paid | 15.02.2018 | Fee for publishing/printing paid | Opposition(s) | 14.01.2019 | No opposition filed within time limit [2019/12] | Request for further processing for: | 03.11.2016 | Request for further processing filed | 03.11.2016 | Full payment received (date of receipt of payment) Request granted | 15.11.2016 | Decision despatched | The application is deemed to be withdrawn due to non-payment of the filing fee | 28.09.2016 | Request for further processing filed | 28.09.2016 | Full payment received (date of receipt of payment) Request granted | 15.11.2016 | Decision despatched | The application is deemed to be withdrawn due to non-payment of the examination fee | 28.09.2016 | Request for further processing filed | 28.09.2016 | Full payment received (date of receipt of payment) Request granted | 15.11.2016 | Decision despatched | The application is deemed to be withdrawn due to non-payment of designation fees TR, SM, SK, SI, SE, RS, RO, PT, PL, NO, NL, MT, MK, MC, LV, LU, LT, IT, IS, IE, HU, HR, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT, AL | 28.09.2016 | Request for further processing filed | 28.09.2016 | Full payment received (date of receipt of payment) Request granted | 15.11.2016 | Decision despatched | Fees paid | Renewal fee | 28.02.2017 | Renewal fee patent year 03 | 28.02.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.02.2015 | AL | 11.04.2018 | AT | 11.04.2018 | CY | 11.04.2018 | CZ | 11.04.2018 | DK | 11.04.2018 | EE | 11.04.2018 | ES | 11.04.2018 | FI | 11.04.2018 | HR | 11.04.2018 | IT | 11.04.2018 | LT | 11.04.2018 | LV | 11.04.2018 | MC | 11.04.2018 | MK | 11.04.2018 | MT | 11.04.2018 | NL | 11.04.2018 | PL | 11.04.2018 | RO | 11.04.2018 | RS | 11.04.2018 | SE | 11.04.2018 | SI | 11.04.2018 | SK | 11.04.2018 | SM | 11.04.2018 | TR | 11.04.2018 | BG | 11.07.2018 | NO | 11.07.2018 | GR | 12.07.2018 | IS | 11.08.2018 | PT | 13.08.2018 | [2022/31] |
Former [2021/32] | HU | 19.02.2015 | |
AL | 11.04.2018 | ||
AT | 11.04.2018 | ||
CY | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
MT | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
TR | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
IS | 11.08.2018 | ||
PT | 13.08.2018 | ||
Former [2021/31] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CY | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
MT | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
TR | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
IS | 11.08.2018 | ||
PT | 13.08.2018 | ||
Former [2021/26] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CY | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
MT | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
TR | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2020/29] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
MT | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
TR | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2020/16] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
TR | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/45] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/26] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/11] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/10] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SK | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/09] | AL | 11.04.2018 | |
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2019/08] | AL | 11.04.2018 | |
DK | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2018/52] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
GR | 12.07.2018 | ||
PT | 13.08.2018 | ||
Former [2018/51] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
PT | 13.08.2018 | ||
Former [2018/50] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
PT | 13.08.2018 | ||
Former [2018/49] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
LT | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
PT | 13.08.2018 | ||
Former [2018/47] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
LT | 11.04.2018 | ||
NL | 11.04.2018 | ||
NO | 11.07.2018 | ||
Former [2018/46] | AL | 11.04.2018 | |
LT | 11.04.2018 | ||
NL | 11.04.2018 | ||
NO | 11.07.2018 | ||
Former [2018/43] | NL | 11.04.2018 | Cited in | International search | [AD]EP2591447 (BEWEIS SARL [FR]) [AD] 1-12 * the whole document * |