| EP3127312 - RESOURCE ALLOCATION IN A DIGITAL COMMUNICATION NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.12.2020 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 10.01.2020 | ||
| Former | Grant of patent is intended Status updated on 04.09.2019 | ||
| Former | Request for examination was made Status updated on 06.01.2017 | ||
| Former | The international publication has been made Status updated on 12.12.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states British Telecommunications public limited company 81 Newgate Street London EC1A 7AJ / GB | [2018/01] |
| Former [2017/06] | For all designated states British Telecommunications Public Limited Company 81 Newgate Street London EC1A 7AJ / GB | Inventor(s) | 01 /
LINNEY, Trevor Philip 81 Newgate Street London EC1A 7AJ / GB | 02 /
HORSLEY, Ian Edwin 81 Newgate Street London EC1A 7AJ / GB | [2017/06] | Representative(s) | British Telecommunications public limited company Intellectual Property Department 9th Floor One Braham Braham Street London E1 8EE / GB | [N/P] |
| Former [2020/07] | British Telecommunications public limited company Intellectual Property Department Ground Floor, Faraday Building 1 Knightrider Street London EC4V 5BT / GB | ||
| Former [2017/06] | Geffen, Nigel Paul BT Intellectual Property Department Ground Floor BT Faraday Building 1 Knightrider Street London EC4V 5BT / GB | Application number, filing date | 15714005.4 | 23.03.2015 | [2017/06] | WO2015GB50848 | Priority number, date | EP20140250059 | 31.03.2014 Original published format: EP 14250059 | [2017/06] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015150732 | Date: | 08.10.2015 | Language: | EN | [2015/40] | Type: | A1 Application with search report | No.: | EP3127312 | Date: | 08.02.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.10.2015 takes the place of the publication of the European patent application. | [2017/06] | Type: | B1 Patent specification | No.: | EP3127312 | Date: | 12.02.2020 | Language: | EN | [2020/07] | Search report(s) | International search report - published on: | EP | 08.10.2015 | Classification | IPC: | H04M11/06, H04B3/32 | [2017/06] | CPC: |
H04M11/062 (EP,CN,US);
H04B3/32 (EP,CN,US);
H04L5/14 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/06] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | RESSOURCENZUWEISUNG IN EINEM DIGITALEN KOMMUNIKATIONSNETZWERK | [2017/06] | English: | RESOURCE ALLOCATION IN A DIGITAL COMMUNICATION NETWORK | [2017/06] | French: | ATTRIBUTION DE RESSOURCES DANS UN RÉSEAU DE COMMUNICATION NUMÉRIQUE | [2019/35] |
| Former [2017/06] | AFFECTATION DE RESSOURCES DANS UN RÉSEAU DE COMMUNICATION NUMÉRIQUE | Entry into regional phase | 21.09.2016 | National basic fee paid | 21.09.2016 | Designation fee(s) paid | 21.09.2016 | Examination fee paid | Examination procedure | 21.09.2016 | Amendment by applicant (claims and/or description) | 21.09.2016 | Examination requested [2017/06] | 21.09.2016 | Date on which the examining division has become responsible | 05.09.2019 | Communication of intention to grant the patent | 19.12.2019 | Fee for grant paid | 19.12.2019 | Fee for publishing/printing paid | 19.12.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 13.11.2020 | No opposition filed within time limit [2021/03] | Fees paid | Renewal fee | 31.12.2016 | Renewal fee patent year 03 | 01.01.2018 | Renewal fee patent year 04 | 31.12.2018 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.03.2015 | AL | 12.02.2020 | AT | 12.02.2020 | CY | 12.02.2020 | CZ | 12.02.2020 | DK | 12.02.2020 | EE | 12.02.2020 | ES | 12.02.2020 | FI | 12.02.2020 | HR | 12.02.2020 | IT | 12.02.2020 | LT | 12.02.2020 | LV | 12.02.2020 | MC | 12.02.2020 | MK | 12.02.2020 | MT | 12.02.2020 | NL | 12.02.2020 | PL | 12.02.2020 | RO | 12.02.2020 | RS | 12.02.2020 | SE | 12.02.2020 | SI | 12.02.2020 | SK | 12.02.2020 | SM | 12.02.2020 | TR | 12.02.2020 | IE | 23.03.2020 | LU | 23.03.2020 | BE | 31.03.2020 | CH | 31.03.2020 | LI | 31.03.2020 | BG | 12.05.2020 | NO | 12.05.2020 | GR | 13.05.2020 | IS | 12.06.2020 | PT | 05.07.2020 | [2022/31] |
| Former [2022/30] | HU | 23.03.2015 | |
| AL | 12.02.2020 | ||
| AT | 12.02.2020 | ||
| CY | 12.02.2020 | ||
| CZ | 12.02.2020 | ||
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| IT | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| MT | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| PL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SI | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| TR | 12.02.2020 | ||
| IE | 23.03.2020 | ||
| LU | 23.03.2020 | ||
| BE | 31.03.2020 | ||
| CH | 31.03.2020 | ||
| LI | 31.03.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2022/27] | HU | 23.03.2015 | |
| AT | 12.02.2020 | ||
| CY | 12.02.2020 | ||
| CZ | 12.02.2020 | ||
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| IT | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| MT | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| PL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SI | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| TR | 12.02.2020 | ||
| IE | 23.03.2020 | ||
| LU | 23.03.2020 | ||
| BE | 31.03.2020 | ||
| CH | 31.03.2020 | ||
| LI | 31.03.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2021/10] | AT | 12.02.2020 | |
| CZ | 12.02.2020 | ||
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| IT | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| PL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SI | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| IE | 23.03.2020 | ||
| LU | 23.03.2020 | ||
| BE | 31.03.2020 | ||
| CH | 31.03.2020 | ||
| LI | 31.03.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2021/07] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| IE | 23.03.2020 | ||
| LU | 23.03.2020 | ||
| CH | 31.03.2020 | ||
| LI | 31.03.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2021/04] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| LU | 23.03.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2020/52] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| MC | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2020/50] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| EE | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2020/49] | CZ | 12.02.2020 | |
| DK | 12.02.2020 | ||
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SK | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2020/48] | DK | 12.02.2020 | |
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RO | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| SM | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| PT | 05.07.2020 | ||
| Former [2020/47] | DK | 12.02.2020 | |
| ES | 12.02.2020 | ||
| FI | 12.02.2020 | ||
| HR | 12.02.2020 | ||
| LT | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| Former [2020/45] | FI | 12.02.2020 | |
| HR | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| NL | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| Former [2020/40] | FI | 12.02.2020 | |
| HR | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| IS | 12.06.2020 | ||
| Former [2020/39] | FI | 12.02.2020 | |
| HR | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| BG | 12.05.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| Former [2020/38] | FI | 12.02.2020 | |
| HR | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| NO | 12.05.2020 | ||
| GR | 13.05.2020 | ||
| Former [2020/37] | FI | 12.02.2020 | |
| HR | 12.02.2020 | ||
| LV | 12.02.2020 | ||
| RS | 12.02.2020 | ||
| SE | 12.02.2020 | ||
| NO | 12.05.2020 | ||
| Former [2020/35] | FI | 12.02.2020 | |
| NO | 12.05.2020 | Cited in | International search | [A] US2012275576 (WEI DONG et al.) [A] 1-12 * abstract * * paragraph [0004] - paragraph [0008] * * paragraph [0022] - paragraph [0028] * * paragraphs [0034] , [0036] * * paragraph [0040] - paragraph [0046] * * paragraph [0062] - paragraph [0064] * * paragraph [0081] - paragraph [0083] * | [A] WO2010018562 (ECI TELECOM LTD et al.) [A] 1-12 * abstract * * page 2, line 26 - page 3, line 20 * * page 9, line 14 - line 23 * * page 13, line 12 - page 14, line 9 * * page 16, line 13 - page 18, line 23 * | [A] US2010027601 (FANG LIMING et al.) [A] 1-12 * abstract * * paragraph [0047] - paragraph [0120] * |