| EP3128870 - STRUCTURAL ELEMENT [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 12.09.2025 Database last updated on 30.03.2026 | |
| Former | Examination is in progress Status updated on 18.06.2021 | ||
| Former | Request for examination was made Status updated on 13.01.2017 | ||
| Former | The international publication has been made Status updated on 19.12.2016 | Most recent event Tooltip | 12.09.2025 | Application deemed to be withdrawn | published on 15.10.2025 [2025/42] | Applicant(s) | For all designated states Bulthaup GmbH & Co. KG Werkstraße 6 Aich 84155 Bodenkirchen / DE | [2017/07] | Inventor(s) | 01 /
ECKERT, Marc Oliver Werkstrasse 6 84155 Bodenkirchen / DE | 02 /
RIEGER, Roger Paul Rennweg 54B 84028 Landshut / DE | 03 /
SPOHDE, Ulrich Arberstrasse 5 84155 Bodenkirchen / DE | [2017/07] | Representative(s) | Herrmann, Uwe Lorenz Seidler Gossel Rechtsanwälte Patentanwälte Partnerschaft mbB Widenmayerstraße 23 80538 München / DE | [2017/07] | Application number, filing date | 15715165.5 | 07.04.2015 | [2017/07] | WO2015EP00731 | Priority number, date | DE20141005073 | 07.04.2014 Original published format: DE102014005073 | [2017/07] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2015154867 | Date: | 15.10.2015 | Language: | DE | [2015/41] | Type: | A1 Application with search report | No.: | EP3128870 | Date: | 15.02.2017 | Language: | DE | The application published by WIPO in one of the EPO official languages on 15.10.2015 takes the place of the publication of the European patent application. | [2017/07] | Search report(s) | International search report - published on: | EP | 15.10.2015 | Classification | IPC: | A47B3/00, A47C4/08, A47B13/02, A47B77/16, A47B77/06, A47B77/18, A47B77/08, E05D3/04 | [2017/07] | CPC: |
A47B3/002 (EP,US);
A47B43/00 (US);
A47B13/02 (EP,US);
A47B33/00 (US);
A47B77/022 (US);
A47B77/06 (EP,US);
A47B77/08 (EP,US);
A47B77/16 (EP,US);
A47B77/18 (EP,US);
A47B95/00 (US);
A47B95/008 (US);
A47C4/00 (US);
A47C4/08 (EP,US);
A47C7/002 (EP,US);
A47C7/006 (EP,US);
A47K3/284 (EP,US);
B60B33/00 (US);
E04H1/1266 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/07] | Title | German: | STRUKTURELEMENT | [2017/07] | English: | STRUCTURAL ELEMENT | [2017/07] | French: | ÉLÉMENT STRUCTURAL | [2017/07] | Entry into regional phase | 06.10.2016 | National basic fee paid | 06.10.2016 | Designation fee(s) paid | 06.10.2016 | Examination fee paid | Examination procedure | 06.10.2016 | Examination requested [2017/07] | 06.10.2016 | Date on which the examining division has become responsible | 26.05.2017 | Amendment by applicant (claims and/or description) | 22.06.2021 | Despatch of a communication from the examining division (Time limit: M04) | 11.10.2021 | Reply to a communication from the examining division | 07.11.2023 | Despatch of a communication from the examining division (Time limit: M04) | 04.03.2024 | Reply to a communication from the examining division | 30.01.2025 | Despatch of a communication from the examining division (Time limit: M04) | 31.05.2025 | Application deemed to be withdrawn, date of legal effect [2025/42] | 18.06.2025 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time [2025/42] | Fees paid | Renewal fee | 26.04.2017 | Renewal fee patent year 03 | 26.04.2018 | Renewal fee patent year 04 | 26.04.2019 | Renewal fee patent year 05 | 19.03.2020 | Renewal fee patent year 06 | 29.04.2021 | Renewal fee patent year 07 | 28.03.2022 | Renewal fee patent year 08 | 30.03.2023 | Renewal fee patent year 09 | 24.04.2024 | Renewal fee patent year 10 | Penalty fee | Additional fee for renewal fee | 30.04.2025 | 11   M06   Not yet paid |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | International search | [XA] EP2359713 (SELLEX S A et al.) [X] 1-7,12-15,18-25,34,37,39,40,42,48,52,53 * paragraph [0034] - paragraph [0054]; figures 1-9B *[A] 8-11,16 | [XI] WO8101321 (DAVANTURE ROBERT et al.) [X] 1-7,12,13,15,17-26,35,37,39,40,48,52,53 * page 2, line 10 - page 5, line 3; figures 1-7 *[I] 14 | [X] EP0099972 (STAEGER HANS et al.) [X] 52,53 * abstract; figures 1-7 * | [X] WO2013157966 (CHARZEWSKI JAN et al.) [X] 52,53 * abstract; figures 1-7 * | [E] WO2015055263 (BULTHAUP GMBH & CO et al.) [E] 1-7,12,15,17,18,20-53 * the whole document * | Examination | US2455408 | US2470869 | KR970009671 |