EP3129578 - SYSTEM AND METHOD FOR INTEGRATED WELLBORE STRESS, STABILITY AND STRENGTHENING ANALYSES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.03.2023 Database last updated on 09.07.2024 | |
Former | The patent has been granted Status updated on 25.03.2022 | ||
Former | Grant of patent is intended Status updated on 11.11.2021 | ||
Former | Examination is in progress Status updated on 19.10.2018 | ||
Former | Request for examination was made Status updated on 13.01.2017 | ||
Former | The international publication has been made Status updated on 16.11.2016 | Most recent event Tooltip | 09.02.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 13.03.2024 [2024/11] | Applicant(s) | For all designated states Weatherford Technology Holdings, LLC 2000, St. James Place Houston, TX 77056 / US | [2022/17] |
Former [2017/07] | For all designated states Weatherford Technology Holdings, LLC 2000, St. James Place Houston, TX 77056 / US | Inventor(s) | 01 /
SHAHRI, Mojtaba P. 6550 W. Sam Houston Parkway N. Suite 250 Houston, TX 77041 / US | 02 /
SAFARIFOROSHANI, Mohammadreza 6550 W. Sam Houston Parkway N. Suite 250 Houston, TX 77041 / US | 03 /
MUTLU, Ovunc 6550 W. Sam Houston Parkway N. Suite 250 Houston, TX 77041 / US | 04 /
OAR, Trevor 400 635-6th Avenue SW Office 108 Calgary, AB / CA | 05 /
KARIMI, Mojtaba 2000 St. James Place Houston, TX 77056 / US | [2017/07] | Representative(s) | Docherty, Andrew John, et al Marks & Clerk LLP The Beacon 176 St Vincent Street Glasgow G2 5SG / GB | [N/P] |
Former [2022/17] | Docherty, Andrew John, et al Marks & Clerk LLP Aurora 120 Bothwell Street Glasgow G2 7JS / GB | ||
Former [2017/07] | Shanks, Andrew Marks & Clerk LLP Aurora 120 Bothwell Street Glasgow G2 7JS / GB | Application number, filing date | 15716969.9 | 08.04.2015 | [2017/07] | WO2015US24887 | Priority number, date | US201414249052 | 09.04.2014 Original published format: US201414249052 | [2017/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2015157394 | Date: | 15.10.2015 | Language: | EN | [2015/41] | Type: | A2 Application without search report | No.: | EP3129578 | Date: | 15.02.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.10.2015 takes the place of the publication of the European patent application. | [2017/07] | Type: | B1 Patent specification | No.: | EP3129578 | Date: | 27.04.2022 | Language: | EN | [2022/17] | Search report(s) | International search report - published on: | EP | 03.12.2015 | Classification | IPC: | E21B21/00 | [2017/07] | CPC: |
E21B21/003 (EP,US);
E21B49/006 (US);
E21B49/003 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUR INTEGRIERTEN ANALYSE VON BOHRLOCHBELASTUNG, -STABILITÄT UND -VERSTÄRKUNG | [2017/07] | English: | SYSTEM AND METHOD FOR INTEGRATED WELLBORE STRESS, STABILITY AND STRENGTHENING ANALYSES | [2017/07] | French: | SYSTÈME ET PROCÉDÉ PERMETTANT DES ANALYSES INTÉGRÉES DE CONTRAINTE, DE STABILITÉ ET DE RENFORCEMENT DE PUITS DE FORAGE | [2017/07] | Entry into regional phase | 07.10.2016 | National basic fee paid | 07.10.2016 | Designation fee(s) paid | 07.10.2016 | Examination fee paid | Examination procedure | 07.10.2016 | Examination requested [2017/07] | 07.10.2016 | Date on which the examining division has become responsible | 16.06.2017 | Amendment by applicant (claims and/or description) | 22.10.2018 | Despatch of a communication from the examining division (Time limit: M04) | 15.02.2019 | Reply to a communication from the examining division | 31.07.2020 | Despatch of a communication from the examining division (Time limit: M04) | 09.12.2020 | Reply to a communication from the examining division | 27.10.2021 | Cancellation of oral proceeding that was planned for 28.10.2021 | 28.10.2021 | Date of oral proceedings (cancelled) | 12.11.2021 | Communication of intention to grant the patent | 21.03.2022 | Fee for grant paid | 21.03.2022 | Fee for publishing/printing paid | 21.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 30.01.2023 | No opposition filed within time limit [2023/14] | Fees paid | Renewal fee | 10.04.2017 | Renewal fee patent year 03 | 11.04.2018 | Renewal fee patent year 04 | 15.04.2019 | Renewal fee patent year 05 | 31.03.2020 | Renewal fee patent year 06 | 15.04.2021 | Renewal fee patent year 07 | 14.03.2022 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Rights in Rem or Legal Means of Execution | ID: | 01 | For: | AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR | Date: | 11.05.2020 | ID: | 02 | For: | AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR | Date: | 24.11.2020 | [2021/09] |
Former [2020/49] | ID: | 01 | |
For: | AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR | ||
Date: | 11.05.2020 | ||
[2021/09] | |||
Former [2020/34] | ID: | 01 | |
For: | AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR | ||
Date: | 11.05.2020 | ||
ID: | 02 | ||
For: | AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR | ||
Date: | 11.05.2020 | ||
[2020/49] | Lapses during opposition Tooltip | AL | 27.04.2022 | AT | 27.04.2022 | CZ | 27.04.2022 | DK | 27.04.2022 | EE | 27.04.2022 | ES | 27.04.2022 | FI | 27.04.2022 | HR | 27.04.2022 | IT | 27.04.2022 | LT | 27.04.2022 | LV | 27.04.2022 | MC | 27.04.2022 | NL | 27.04.2022 | PL | 27.04.2022 | RO | 27.04.2022 | RS | 27.04.2022 | SE | 27.04.2022 | SI | 27.04.2022 | SK | 27.04.2022 | SM | 27.04.2022 | BG | 27.07.2022 | GR | 28.07.2022 | IS | 27.08.2022 | PT | 29.08.2022 | [2024/11] |
Former [2024/08] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/25] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/17] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/09] | AT | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/07] | AT | 27.04.2022 | |
DK | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/51] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/50] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/49] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/47] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
LT | 27.04.2022 | ||
NL | 27.04.2022 | ||
SE | 27.04.2022 | ||
PT | 29.08.2022 | ||
Former [2022/44] | NL | 27.04.2022 | Cited in | International search | [XYI]US2011153296 (SADLIER ANDREAS G [US], et al) [X] 1-4,6,7,11-14,16-19,21,22,26-29,31-34,36,37,41-44 * paragraphs [0002] - [0007] - [0024] , [0025] , [0027] - [0034] - [0036] - [0049] - [0051] , [0069] - [0074] * * figures 1-4,6 * [Y] 8-10,23-25,38-40 [I] 5,15,20,30,35,45-47; | [Y]WO2012170382 (SHARP ROCK RES AND CONSULTING LLC [US], et al) [Y] 8-10,23-25,38-40* paragraphs [0002] - [0022] - [0 55] - [0084] - [ 124] - [0127] - [0141] - [0148]; figure - *; | [XI]WO2013119685 (MI LLC [US]) [X] 1,16,31 * paragraphs [0019] - [0064] * * claim - * * figure - * [I] 2-5,15,17-20,30,32-35,45 |