EP3132329 - SYSTEM AND METHOD FOR DEFERRING POWER CONSUMPTION BY POST-PROCESSING SENSOR DATA [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.03.2020 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 12.04.2019 | ||
Former | Grant of patent is intended Status updated on 25.11.2018 | ||
Former | Examination is in progress Status updated on 09.03.2018 | ||
Former | Request for examination was made Status updated on 20.01.2017 | ||
Former | The international publication has been made Status updated on 07.11.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2017/08] | Inventor(s) | 01 /
HAMPSON, Terence William 5775 Morehouse Drive San Diego, California 92121-1714 / US | 02 /
HILDRETH, Evan Robert 5775 Morehouse Drive San Diego, California 92121-1714 / US | 03 /
FORUTANPOUR, Babak 5775 Morehouse Drive San Diego, California 92121-1714 / US | [2017/08] | Representative(s) | Loveless, Ian Mark Reddie & Grose LLP The White Chapel Building 10 Whitechapel High Street London E1 8QS / GB | [2019/20] |
Former [2017/08] | Loveless, Ian Mark Reddie & Grose LLP 16 Theobalds Road London WC1X 8PL / GB | Application number, filing date | 15720139.3 | 08.04.2015 | [2017/08] | WO2015US24917 | Priority number, date | US201414253107 | 15.04.2014 Original published format: US201414253107 | [2017/08] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015160590 | Date: | 22.10.2015 | Language: | EN | [2015/42] | Type: | A1 Application with search report | No.: | EP3132329 | Date: | 22.02.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.10.2015 takes the place of the publication of the European patent application. | [2017/08] | Type: | B1 Patent specification | No.: | EP3132329 | Date: | 15.05.2019 | Language: | EN | [2019/20] | Search report(s) | International search report - published on: | EP | 22.10.2015 | Classification | IPC: | G06F1/32 | [2017/08] | CPC: |
G06F1/3212 (EP,KR,US);
G06F1/3234 (CN);
G06F1/329 (EP,KR,US);
G06F1/3293 (KR,US);
Y02D10/00 (EP,KR,US);
Y02D30/50 (EP,KR,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUR VERZÖGERUNG DES STROMVERBRAUCHS DURCH NACHVERARBEITUNG VON SENSORDATEN | [2017/08] | English: | SYSTEM AND METHOD FOR DEFERRING POWER CONSUMPTION BY POST-PROCESSING SENSOR DATA | [2017/08] | French: | SYSTÈME ET PROCÉDÉ DE REPORT DE CONSOMMATION ÉNERGÉTIQUE DUE AU POST-TRAITEMENT DE DONNÉES DE CAPTEURS | [2017/08] | Entry into regional phase | 27.10.2016 | National basic fee paid | 27.10.2016 | Designation fee(s) paid | 27.10.2016 | Examination fee paid | Examination procedure | 09.02.2016 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 27.10.2016 | Examination requested [2017/08] | 27.10.2016 | Date on which the examining division has become responsible | 29.03.2017 | Amendment by applicant (claims and/or description) | 08.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 14.05.2018 | Reply to a communication from the examining division | 26.11.2018 | Communication of intention to grant the patent | 26.03.2019 | Fee for grant paid | 26.03.2019 | Fee for publishing/printing paid | 26.03.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 18.02.2020 | No opposition filed within time limit [2020/17] | Fees paid | Renewal fee | 14.02.2017 | Renewal fee patent year 03 | 09.04.2018 | Renewal fee patent year 04 | 08.04.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.04.2015 | AL | 15.05.2019 | AT | 15.05.2019 | CY | 15.05.2019 | CZ | 15.05.2019 | DK | 15.05.2019 | EE | 15.05.2019 | ES | 15.05.2019 | FI | 15.05.2019 | HR | 15.05.2019 | IT | 15.05.2019 | LT | 15.05.2019 | LV | 15.05.2019 | MC | 15.05.2019 | MK | 15.05.2019 | MT | 15.05.2019 | NL | 15.05.2019 | PL | 15.05.2019 | RO | 15.05.2019 | RS | 15.05.2019 | SE | 15.05.2019 | SI | 15.05.2019 | SK | 15.05.2019 | SM | 15.05.2019 | TR | 15.05.2019 | BG | 15.08.2019 | NO | 15.08.2019 | GR | 16.08.2019 | IS | 15.09.2019 | PT | 15.09.2019 | [2022/31] |
Former [2022/30] | HU | 08.04.2015 | |
AL | 15.05.2019 | ||
AT | 15.05.2019 | ||
CY | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
MT | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SI | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
IS | 15.09.2019 | ||
PT | 15.09.2019 | ||
Former [2022/28] | HU | 08.04.2015 | |
AL | 15.05.2019 | ||
AT | 15.05.2019 | ||
CY | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
MT | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SI | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/52] | AL | 15.05.2019 | |
AT | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SI | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/25] | AL | 15.05.2019 | |
AT | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SI | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/17] | AL | 15.05.2019 | |
AT | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/14] | AL | 15.05.2019 | |
AT | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/12] | AL | 15.05.2019 | |
AT | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/11] | AL | 15.05.2019 | |
AT | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/10] | AL | 15.05.2019 | |
AT | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/09] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/51] | AL | 15.05.2019 | |
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/50] | AL | 15.05.2019 | |
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/49] | AL | 15.05.2019 | |
ES | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
NL | 15.05.2019 | ||
SE | 15.05.2019 | ||
NO | 15.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/48] | ES | 15.05.2019 | |
FI | 15.05.2019 | ||
LT | 15.05.2019 | ||
SE | 15.05.2019 | ||
NO | 15.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/47] | ES | 15.05.2019 | |
FI | 15.05.2019 | ||
LT | 15.05.2019 | ||
NO | 15.08.2019 | Cited in | International search | [A]US2005108075 (DOUGLIS FREDERICK [US], et al) [A] 1-30 * paragraph [0023] * * paragraph [0032] - paragraph [0033] * * figures 4A,4B *; | [I]US8264328 (BLACKADAR THOMAS P [US]) [I] 1-30 * column 2, line 43 - line 45 * * column 2, line 62 * * column 3, line 10 * * column 3, line 30 - line 49 * * column 3, line 55 - line 58 * * column 4, line 39 * * column 4, line 54 * * column 5, line 34 - line 39 * * column 5, line 40 - line 42 * * column 7, line 13 - line 19 * * column 7, line 32 - line 33 * * figures 1,2 *; | [A]US2013229491 (KIM WANG-HYUN [KR], et al) [A] 1-30 * abstract * * paragraph [0048] - paragraph [0053] ** figures 1,4,5 * | Examination | US2004257462 |