EP3148653 - GUIDED TYPE FALL ARRESTER - FORCE CONTROL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.08.2021 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 18.09.2020 | ||
Former | Grant of patent is intended Status updated on 13.05.2020 | ||
Former | Request for examination was made Status updated on 03.03.2017 | ||
Former | The international publication has been made Status updated on 21.11.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Honeywell International Inc. Patent Services M/S AB/2B P.O. Box 377 Intellectual Property-Patent Services 115 Tabor Road M/S 4D3 Morris Plains, NJ 07950 / US | [2017/14] | Inventor(s) | 01 /
ROTH, Markus Honeywell International Inc. Patent Services M/S AB/2B 101 Columbia Road P. O. Box 2245 Morristown, NJ 07962-2245 / US | [2017/14] | Representative(s) | Haseltine Lake Kempner LLP Cheapside House 138 Cheapside London EC2V 6BJ / GB | [N/P] |
Former [2020/43] | Haseltine Lake Kempner LLP 138 Cheapside London EC2V 6BJ / GB | ||
Former [2017/14] | Houghton, Mark Phillip Patent Outsourcing Limited 1 King Street Bakewell, Derbyshire DE45 1DZ / GB | Application number, filing date | 15724917.8 | 14.05.2015 | [2017/14] | WO2015US30697 | Priority number, date | US201462004816P | 29.05.2014 Original published format: US 201462004816 P | [2017/14] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015183564 | Date: | 03.12.2015 | Language: | EN | [2015/48] | Type: | A1 Application with search report | No.: | EP3148653 | Date: | 05.04.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.12.2015 takes the place of the publication of the European patent application. | [2017/14] | Type: | B1 Patent specification | No.: | EP3148653 | Date: | 21.10.2020 | Language: | EN | [2020/43] | Search report(s) | International search report - published on: | EP | 03.12.2015 | Classification | IPC: | A62B35/00, E06C7/18, E04G21/32 | [2017/14] | CPC: |
E06C7/187 (EP,US);
A62B35/005 (EP,US);
A62B35/0062 (EP,US);
A62B35/0081 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/14] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | GEFÜHRTER FALLSTOPPER MIT KRAFTBEGRENZER | [2020/15] | English: | GUIDED TYPE FALL ARRESTER - FORCE CONTROL | [2017/14] | French: | COMMANDE DE LA FORCE D'UN DISPOSITIF ANTICHUTE DU TYPE GUIDÉ | [2017/14] |
Former [2017/14] | KRAFTSTEUERUNG EINER GEFÜHRTEN FALLVORRICHTUNG | Entry into regional phase | 21.11.2016 | National basic fee paid | 21.11.2016 | Designation fee(s) paid | 21.11.2016 | Examination fee paid | Examination procedure | 21.11.2016 | Examination requested [2017/14] | 21.11.2016 | Date on which the examining division has become responsible | 10.04.2017 | Amendment by applicant (claims and/or description) | 14.05.2020 | Communication of intention to grant the patent | 17.08.2020 | Receipt of the translation of the claim(s) | 11.09.2020 | Fee for grant paid | 11.09.2020 | Fee for publishing/printing paid | Opposition(s) | 22.07.2021 | No opposition filed within time limit [2021/39] | Fees paid | Renewal fee | 08.05.2017 | Renewal fee patent year 03 | 30.05.2018 | Renewal fee patent year 04 | 29.05.2019 | Renewal fee patent year 05 | 28.05.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.05.2015 | AL | 21.10.2020 | AT | 21.10.2020 | CY | 21.10.2020 | CZ | 21.10.2020 | DK | 21.10.2020 | EE | 21.10.2020 | ES | 21.10.2020 | FI | 21.10.2020 | HR | 21.10.2020 | IT | 21.10.2020 | LT | 21.10.2020 | LV | 21.10.2020 | MC | 21.10.2020 | MK | 21.10.2020 | MT | 21.10.2020 | NL | 21.10.2020 | PL | 21.10.2020 | RO | 21.10.2020 | RS | 21.10.2020 | SE | 21.10.2020 | SI | 21.10.2020 | SK | 21.10.2020 | SM | 21.10.2020 | BG | 21.01.2021 | NO | 21.01.2021 | GR | 22.01.2021 | IS | 21.02.2021 | PT | 22.02.2021 | IE | 14.05.2021 | LU | 14.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | LI | 31.05.2021 | [2024/41] |
Former [2024/22] | HU | 14.05.2015 | |
AL | 21.10.2020 | ||
AT | 21.10.2020 | ||
CY | 21.10.2020 | ||
CZ | 21.10.2020 | ||
DK | 21.10.2020 | ||
EE | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
IT | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
MC | 21.10.2020 | ||
MK | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SI | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
IE | 14.05.2021 | ||
LU | 14.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/30] | HU | 14.05.2015 | |
AL | 21.10.2020 | ||
AT | 21.10.2020 | ||
CY | 21.10.2020 | ||
CZ | 21.10.2020 | ||
DK | 21.10.2020 | ||
EE | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
IT | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
MC | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SI | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
IE | 14.05.2021 | ||
LU | 14.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/29] | HU | 14.05.2015 | |
AL | 21.10.2020 | ||
AT | 21.10.2020 | ||
CZ | 21.10.2020 | ||
DK | 21.10.2020 | ||
EE | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
IT | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
MC | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SI | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
IE | 14.05.2021 | ||
LU | 14.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/34] | AL | 21.10.2020 | |
AT | 21.10.2020 | ||
CZ | 21.10.2020 | ||
DK | 21.10.2020 | ||
EE | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
IT | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
MC | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SI | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
IE | 14.05.2021 | ||
LU | 14.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/23] | AL | 21.10.2020 | |
AT | 21.10.2020 | ||
CZ | 21.10.2020 | ||
DK | 21.10.2020 | ||
EE | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
IT | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
MC | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SI | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
IE | 14.05.2021 | ||
LU | 14.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/21] | AL | 21.10.2020 | |
AT | 21.10.2020 | ||
CZ | 21.10.2020 | ||
DK | 21.10.2020 | ||
EE | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
IT | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
MC | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SI | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
PT | 22.02.2021 | ||
IE | 14.05.2021 | ||
LU | 14.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/10] | AL | 21.10.2020 | |
AT | 21.10.2020 | ||
CZ | 21.10.2020 | ||
DK | 21.10.2020 | ||
EE | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
IT | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
MC | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SI | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
PT | 22.02.2021 | ||
LU | 14.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/09] | AL | 21.10.2020 | |
AT | 21.10.2020 | ||
CZ | 21.10.2020 | ||
DK | 21.10.2020 | ||
EE | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
IT | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
MC | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SI | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
LU | 14.05.2021 | ||
Former [2022/07] | AL | 21.10.2020 | |
AT | 21.10.2020 | ||
CZ | 21.10.2020 | ||
DK | 21.10.2020 | ||
EE | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
IT | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
MC | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SI | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
Former [2021/50] | AL | 21.10.2020 | |
AT | 21.10.2020 | ||
CZ | 21.10.2020 | ||
DK | 21.10.2020 | ||
EE | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
IT | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SI | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
Former [2021/48] | AL | 21.10.2020 | |
AT | 21.10.2020 | ||
CZ | 21.10.2020 | ||
DK | 21.10.2020 | ||
EE | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
IT | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
Former [2021/45] | AL | 21.10.2020 | |
AT | 21.10.2020 | ||
CZ | 21.10.2020 | ||
DK | 21.10.2020 | ||
EE | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
Former [2021/37] | AT | 21.10.2020 | |
CZ | 21.10.2020 | ||
DK | 21.10.2020 | ||
EE | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
Former [2021/36] | AT | 21.10.2020 | |
CZ | 21.10.2020 | ||
EE | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
Former [2021/35] | AT | 21.10.2020 | |
CZ | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RO | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SK | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
Former [2021/34] | AT | 21.10.2020 | |
CZ | 21.10.2020 | ||
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
Former [2021/33] | AT | 21.10.2020 | |
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
LT | 21.10.2020 | ||
LV | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
Former [2021/32] | AT | 21.10.2020 | |
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
LV | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
SM | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
Former [2021/28] | AT | 21.10.2020 | |
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
HR | 21.10.2020 | ||
LV | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
Former [2021/25] | AT | 21.10.2020 | |
ES | 21.10.2020 | ||
FI | 21.10.2020 | ||
LV | 21.10.2020 | ||
NL | 21.10.2020 | ||
PL | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
IS | 21.02.2021 | ||
PT | 22.02.2021 | ||
Former [2021/23] | AT | 21.10.2020 | |
FI | 21.10.2020 | ||
LV | 21.10.2020 | ||
NL | 21.10.2020 | ||
RS | 21.10.2020 | ||
SE | 21.10.2020 | ||
BG | 21.01.2021 | ||
NO | 21.01.2021 | ||
GR | 22.01.2021 | ||
PT | 22.02.2021 | ||
Former [2021/22] | FI | 21.10.2020 | |
NL | 21.10.2020 | ||
RS | 21.10.2020 | ||
NO | 21.01.2021 | ||
PT | 22.02.2021 | ||
Former [2021/21] | FI | 21.10.2020 | |
NL | 21.10.2020 | ||
PT | 22.02.2021 | ||
Former [2021/20] | FI | 21.10.2020 | Cited in | International search | [A]DE202005011338U (CHRISTIAN DALLOZ HOLDING DEUTS [DE]) [A] 1 * figures 1,3,5-7 * * paragraphs [0009] , [0010] , [0012] - [0014] - [0016] , [0017] ** Bezugszeichenliste / Reference sign list *; | [AD]WO2008046446 (CHRISTIAN DALLOZ HOLDING DEUTS [DE], et al) [AD] 1 * paragraphs [0009] , [0010] , [0012] - [0014] - [0016] , [0017] , [0034] * * figures 1,3,5-7 * | by applicant | EP0168021 | US2010012424 |