blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3155171

EP3155171 - METHOD FOR PRODUCING BITUMINOUS COATINGS WITH REDUCED TACKINESS [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  22.11.2019
Database last updated on 14.11.2024
FormerExamination is in progress
Status updated on  22.09.2017
FormerRequest for examination was made
Status updated on  20.03.2017
FormerThe international publication has been made
Status updated on  15.11.2016
Most recent event   Tooltip22.11.2019Application deemed to be withdrawnpublished on 25.12.2019  [2019/52]
Applicant(s)For all designated states
Akzo Nobel Chemicals International B.V.
Velperweg 76
6824 BM Arnhem / NL
[2017/16]
Inventor(s)01 / ZHOU, Qiong
63 Guinness Way
Hopewell Junction, New York 12533 / US
02 / JAMES, Alan Duncan
179 River Drive
Trout Valley, Illinois 60013 / US
03 / FRANKLIN, Ralph
25 Tamanny Trail
Danbury, Connecticut 06811 / US
04 / GORSUCH, Christine Cornelia
19 Aster Hill Drive
Wappinger Falls, New York 12590 / US
[N/P]
Former [2017/16]01 / ZHOU, Qiong
63 Guinness Way
Hopewell Junction, New York 12533 / US
02 / JAMES, Alan Duncan
P.O. Box 4728
Chicago, Illinois 60680 / US
03 / FRANKLIN, Ralph
25 Tamanny Trail
Danbury, Connecticut 06811 / US
04 / GORSUCH, Christine Cornelia
19 Aster Hill Drive
Wappinger Falls, New York 12590 / US
Representative(s)Akzo Nobel Chemicals IP Group
Velperweg 76
6824 BM Arnhem / NL
[N/P]
Former [2017/16]Akzo Nobel IP Department
Velperweg 76
6824 BM Arnhem / NL
Application number, filing date15729793.811.06.2015
[2017/16]
WO2015EP63030
Priority number, dateUS201462011271P12.06.2014         Original published format: US 201462011271 P
EP2014018617324.09.2014         Original published format: EP 14186173
[2017/16]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015189322
Date:17.12.2015
Language:EN
[2015/50]
Type: A1 Application with search report 
No.:EP3155171
Date:19.04.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 17.12.2015 takes the place of the publication of the European patent application.
[2017/16]
Search report(s)International search report - published on:EP17.12.2015
ClassificationIPC:E01C7/18, E01C7/32
[2017/16]
CPC:
C09D7/65 (EP,US); B05D3/107 (US); B05D5/08 (US);
B05D7/24 (US); C08L95/00 (EP,US); C09D195/005 (EP,US);
E01C7/185 (EP,US); E01C7/32 (EP,US); E01C7/325 (US);
E01C7/35 (EP,US); E01C7/353 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/16]
TitleGerman:VERFAHREN ZUR HERSTELLUNG VON BITUMENÜBERZUGSMITTELN MIT VERMINDERTER KLEBRIGKEIT[2017/42]
English:METHOD FOR PRODUCING BITUMINOUS COATINGS WITH REDUCED TACKINESS[2017/16]
French:PROCÉDÉ DE PRODUCTION DE REVÊTEMENTS BITUMINEUX AVEC UNE ADHÉRENCE RÉDUITE[2017/42]
Former [2017/16]VERFAHREN ZUR HERSTELLUNG VON BITUMINÖSEN BESCHICHTUNGEN MIT VERMINDERTER KLEBRIGKEIT
Former [2017/16]PROCÉDÉ DE PRODUCTION DE REVÊTEMENTS BITUMINEUX À ADHÉSIVITÉ RÉDUITE
Entry into regional phase15.11.2016National basic fee paid 
15.11.2016Designation fee(s) paid 
15.11.2016Examination fee paid 
Examination procedure16.02.2016Request for preliminary examination filed
International Preliminary Examining Authority: EP
15.11.2016Examination requested  [2017/16]
15.11.2016Date on which the examining division has become responsible
13.07.2017Amendment by applicant (claims and/or description)
28.09.2017Despatch of a communication from the examining division (Time limit: M06)
04.04.2018Reply to a communication from the examining division
11.03.2019Despatch of a communication from the examining division (Time limit: M04)
23.07.2019Application deemed to be withdrawn, date of legal effect  [2019/52]
20.08.2019Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2019/52]
Fees paidRenewal fee
27.06.2017Renewal fee patent year 03
27.06.2018Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
30.06.201905   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[ID]FR2025771  (GOLDSCHMIDT AG TH) [ID] 1-14 * the whole document *;
 [X]EP0414423  (GRACE W R & CO [US]) [X] 1-12 * the whole document *;
 [XD]EP0829579  (SCREG [FR]) [XD] 1-14 * the whole document *;
 [X]US2005209376  (DONELSON MICHAEL J [US], et al) [X] 1-14 * the whole document *;
 [XP]WO2014139999  (BASF SE [DE]) [XP] 1-14* the whole document *
Examination   - "DIN EN 12597. Bitumen und bitumenhaltige Bindermittel - Terminologie = Bitumen and bituminous binders - Terminolgy", DEUTSCHE NORMEN. DIN N,, (20010101), vol. EN-12597, pages 102 - 112, XP009144597
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.