| EP3308134 - CONTROLLING A VISCOSITY OF FUEL IN A FUEL CONTROL SYSTEM WITH A VIBRATORY METER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.07.2023 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 12.08.2022 | ||
| Former | Grant of patent is intended Status updated on 09.03.2022 | ||
| Former | Examination is in progress Status updated on 24.02.2020 | ||
| Former | Request for examination was made Status updated on 16.03.2018 | ||
| Former | The international publication has been made Status updated on 16.12.2016 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Micro Motion, Inc. 7070 Winchester Circle Boulder, CO 80301 / US | [2018/16] | Inventor(s) | 01 /
ZIMMER, Patrick John 255 Washington Street Apt. 327 Denver, Colorado 80203 / US | 02 /
JONES, Steven M. 1911 Tynan Drive Erie, Colorado 80516 / US | 03 /
HOUGHTON, John Ansdell 14 Broadfield Park Holmbridge Holmfirth HD9 2JQ / GB | 04 /
BENEDETTI, Paul 1008 Hilltop Drive Loveland, Colorado 80537 / US | [2018/16] | Representative(s) | Ellis, Christopher Paul Ollila Law Limited Edwards Centre The Horsefair Hinckley LE10 0AN / GB | [N/P] |
| Former [2022/37] | Ellis, Christopher Paul Ollila Law Limited Unit 7 The Courtyard Timothys Bridge Road Stratford upon Avon CV37 9NP / GB | ||
| Former [2018/16] | Ellis, Christopher Paul Ollila Law Limited Warwick Innovation Centre Warwick Technology Park Gallows Hill Warwick CV34 6UW / GB | Application number, filing date | 15732115.9 | 08.06.2015 | [2018/16] | WO2015US34647 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016200362 | Date: | 15.12.2016 | Language: | EN | [2016/50] | Type: | A1 Application with search report | No.: | EP3308134 | Date: | 18.04.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.12.2016 takes the place of the publication of the European patent application. | [2018/16] | Type: | B1 Patent specification | No.: | EP3308134 | Date: | 14.09.2022 | Language: | EN | [2022/37] | Search report(s) | International search report - published on: | EP | 15.12.2016 | Classification | IPC: | G01N11/16, F02D41/14, G01N29/02, G05D24/02, F02D41/06, F02D19/12 | [2018/16] | CPC: |
G01N11/16 (EP,CN,US);
F02D33/003 (EP,CN,US);
F02D41/0025 (EP,CN,US);
F02M37/0064 (EP,CN,US);
G01N29/022 (EP,CN,US);
G01N29/4436 (EP,CN,US);
G05D24/02 (EP,CN,US);
F02D2200/0611 (EP,CN,US);
F02D41/064 (EP,CN,US);
G01F1/84 (EP,CN,US);
G01N2291/022 (EP,CN,US);
G01N2291/0226 (US);
G01N2291/02818 (EP,CN,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | STEUERUNG EINER VISKOSITÄT EINES BRENNSTOFFS IN EINEM KRAFTSTOFFREGELUNGSSYSTEM MIT EINEM VIBRATIONSMESSER | [2018/16] | English: | CONTROLLING A VISCOSITY OF FUEL IN A FUEL CONTROL SYSTEM WITH A VIBRATORY METER | [2018/16] | French: | COMMANDE D'UNE VISCOSITÉ DE CARBURANT DANS UN SYSTÈME DE COMMANDE DE CARBURANT AYANT UN DISPOSITIF DE MESURE VIBRATOIRE | [2018/16] | Entry into regional phase | 10.01.2018 | National basic fee paid | 10.01.2018 | Designation fee(s) paid | 10.01.2018 | Examination fee paid | Examination procedure | 08.01.2018 | Date on which the examining division has become responsible | deleted | Deletion: Application deemed to be withdrawn, date of legal effect [2018/16] | 10.01.2018 | Examination requested [2018/16] | 06.02.2018 | Despatch of communication that the application is deemed to be withdrawn, reason: filing fee / search fee not paid in time [2018/16] | 28.09.2018 | Amendment by applicant (claims and/or description) | 26.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 23.06.2020 | Reply to a communication from the examining division | 08.06.2021 | Despatch of a communication from the examining division (Time limit: M04) | 07.10.2021 | Reply to a communication from the examining division | 10.03.2022 | Communication of intention to grant the patent | 05.07.2022 | Fee for grant paid | 05.07.2022 | Fee for publishing/printing paid | 05.07.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 15.06.2023 | No opposition filed within time limit [2023/34] | Request for further processing for: | The application is deemed to be withdrawn due to non-payment of the filing fee | 08.03.2018 | Request for further processing filed | 08.03.2018 | Full payment received (date of receipt of payment) Request granted | 14.03.2018 | Decision despatched | The application is deemed to be withdrawn due to non-payment of the examination fee | 08.03.2018 | Request for further processing filed | 08.03.2018 | Full payment received (date of receipt of payment) Request granted | 14.03.2018 | Decision despatched | The application is deemed to be withdrawn due to non-payment of designation fees TR, SM, SK, SI, SE, RS, RO, PT, PL, NO, NL, MT, MK, MC, LV, LU, LT, IT, IS, IE, HU, HR, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT, AL | 08.03.2018 | Request for further processing filed | 08.03.2018 | Full payment received (date of receipt of payment) Request granted | 14.03.2018 | Decision despatched | Fees paid | Renewal fee | 10.01.2018 | Renewal fee patent year 03 | 27.06.2018 | Renewal fee patent year 04 | 27.06.2019 | Renewal fee patent year 05 | 22.06.2020 | Renewal fee patent year 06 | 23.06.2021 | Renewal fee patent year 07 | 21.06.2022 | Renewal fee patent year 08 | Penalty fee | Additional fee for renewal fee | 08.01.2018 | 03   M06   Fee paid on   08.03.2018 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 08.06.2015 | HU | 08.06.2015 | AL | 14.09.2022 | AT | 14.09.2022 | BG | 14.09.2022 | CZ | 14.09.2022 | DK | 14.09.2022 | EE | 14.09.2022 | ES | 14.09.2022 | FI | 14.09.2022 | HR | 14.09.2022 | IT | 14.09.2022 | LT | 14.09.2022 | LV | 14.09.2022 | MC | 14.09.2022 | NL | 14.09.2022 | PL | 14.09.2022 | RO | 14.09.2022 | RS | 14.09.2022 | SE | 14.09.2022 | SI | 14.09.2022 | SK | 14.09.2022 | SM | 14.09.2022 | TR | 14.09.2022 | NO | 14.12.2022 | GR | 15.12.2022 | IS | 14.01.2023 | PT | 16.01.2023 | IE | 08.06.2023 | LU | 08.06.2023 | [2026/04] |
| Former [2025/39] | CY | 08.06.2015 | |
| HU | 08.06.2015 | ||
| AL | 14.09.2022 | ||
| AT | 14.09.2022 | ||
| BG | 14.09.2022 | ||
| CZ | 14.09.2022 | ||
| DK | 14.09.2022 | ||
| EE | 14.09.2022 | ||
| ES | 14.09.2022 | ||
| FI | 14.09.2022 | ||
| HR | 14.09.2022 | ||
| IT | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| MC | 14.09.2022 | ||
| NL | 14.09.2022 | ||
| PL | 14.09.2022 | ||
| RO | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SI | 14.09.2022 | ||
| SK | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| IS | 14.01.2023 | ||
| PT | 16.01.2023 | ||
| IE | 08.06.2023 | ||
| LU | 08.06.2023 | ||
| Former [2025/36] | CY | 08.06.2015 | |
| AL | 14.09.2022 | ||
| AT | 14.09.2022 | ||
| BG | 14.09.2022 | ||
| CZ | 14.09.2022 | ||
| DK | 14.09.2022 | ||
| EE | 14.09.2022 | ||
| ES | 14.09.2022 | ||
| FI | 14.09.2022 | ||
| HR | 14.09.2022 | ||
| IT | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| MC | 14.09.2022 | ||
| NL | 14.09.2022 | ||
| PL | 14.09.2022 | ||
| RO | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SI | 14.09.2022 | ||
| SK | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| IS | 14.01.2023 | ||
| PT | 16.01.2023 | ||
| IE | 08.06.2023 | ||
| LU | 08.06.2023 | ||
| Former [2024/51] | AL | 14.09.2022 | |
| AT | 14.09.2022 | ||
| BG | 14.09.2022 | ||
| CZ | 14.09.2022 | ||
| DK | 14.09.2022 | ||
| EE | 14.09.2022 | ||
| ES | 14.09.2022 | ||
| FI | 14.09.2022 | ||
| HR | 14.09.2022 | ||
| IT | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| MC | 14.09.2022 | ||
| NL | 14.09.2022 | ||
| PL | 14.09.2022 | ||
| RO | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SI | 14.09.2022 | ||
| SK | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| IS | 14.01.2023 | ||
| PT | 16.01.2023 | ||
| IE | 08.06.2023 | ||
| LU | 08.06.2023 | ||
| Former [2024/26] | AL | 14.09.2022 | |
| AT | 14.09.2022 | ||
| CZ | 14.09.2022 | ||
| DK | 14.09.2022 | ||
| EE | 14.09.2022 | ||
| ES | 14.09.2022 | ||
| FI | 14.09.2022 | ||
| HR | 14.09.2022 | ||
| IT | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| MC | 14.09.2022 | ||
| NL | 14.09.2022 | ||
| PL | 14.09.2022 | ||
| RO | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SI | 14.09.2022 | ||
| SK | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| IS | 14.01.2023 | ||
| PT | 16.01.2023 | ||
| IE | 08.06.2023 | ||
| LU | 08.06.2023 | ||
| Former [2024/21] | AL | 14.09.2022 | |
| AT | 14.09.2022 | ||
| CZ | 14.09.2022 | ||
| DK | 14.09.2022 | ||
| EE | 14.09.2022 | ||
| ES | 14.09.2022 | ||
| FI | 14.09.2022 | ||
| HR | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| MC | 14.09.2022 | ||
| NL | 14.09.2022 | ||
| PL | 14.09.2022 | ||
| RO | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SI | 14.09.2022 | ||
| SK | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| IS | 14.01.2023 | ||
| PT | 16.01.2023 | ||
| IE | 08.06.2023 | ||
| LU | 08.06.2023 | ||
| Former [2024/15] | AL | 14.09.2022 | |
| AT | 14.09.2022 | ||
| CZ | 14.09.2022 | ||
| DK | 14.09.2022 | ||
| EE | 14.09.2022 | ||
| ES | 14.09.2022 | ||
| FI | 14.09.2022 | ||
| HR | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| MC | 14.09.2022 | ||
| NL | 14.09.2022 | ||
| PL | 14.09.2022 | ||
| RO | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SI | 14.09.2022 | ||
| SK | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| IS | 14.01.2023 | ||
| PT | 16.01.2023 | ||
| LU | 08.06.2023 | ||
| Former [2024/09] | AL | 14.09.2022 | |
| AT | 14.09.2022 | ||
| CZ | 14.09.2022 | ||
| DK | 14.09.2022 | ||
| EE | 14.09.2022 | ||
| ES | 14.09.2022 | ||
| FI | 14.09.2022 | ||
| HR | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| MC | 14.09.2022 | ||
| NL | 14.09.2022 | ||
| PL | 14.09.2022 | ||
| RO | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SI | 14.09.2022 | ||
| SK | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| IS | 14.01.2023 | ||
| PT | 16.01.2023 | ||
| Former [2023/37] | AL | 14.09.2022 | |
| AT | 14.09.2022 | ||
| CZ | 14.09.2022 | ||
| DK | 14.09.2022 | ||
| EE | 14.09.2022 | ||
| ES | 14.09.2022 | ||
| FI | 14.09.2022 | ||
| HR | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| NL | 14.09.2022 | ||
| PL | 14.09.2022 | ||
| RO | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SI | 14.09.2022 | ||
| SK | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| IS | 14.01.2023 | ||
| PT | 16.01.2023 | ||
| Former [2023/34] | AL | 14.09.2022 | |
| AT | 14.09.2022 | ||
| CZ | 14.09.2022 | ||
| DK | 14.09.2022 | ||
| EE | 14.09.2022 | ||
| ES | 14.09.2022 | ||
| FI | 14.09.2022 | ||
| HR | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| NL | 14.09.2022 | ||
| PL | 14.09.2022 | ||
| RO | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SK | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| IS | 14.01.2023 | ||
| PT | 16.01.2023 | ||
| Former [2023/30] | AL | 14.09.2022 | |
| AT | 14.09.2022 | ||
| CZ | 14.09.2022 | ||
| EE | 14.09.2022 | ||
| ES | 14.09.2022 | ||
| FI | 14.09.2022 | ||
| HR | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| NL | 14.09.2022 | ||
| PL | 14.09.2022 | ||
| RO | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SK | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| IS | 14.01.2023 | ||
| PT | 16.01.2023 | ||
| Former [2023/29] | AL | 14.09.2022 | |
| AT | 14.09.2022 | ||
| CZ | 14.09.2022 | ||
| EE | 14.09.2022 | ||
| ES | 14.09.2022 | ||
| FI | 14.09.2022 | ||
| HR | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| PL | 14.09.2022 | ||
| RO | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SK | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| IS | 14.01.2023 | ||
| PT | 16.01.2023 | ||
| Former [2023/26] | AT | 14.09.2022 | |
| CZ | 14.09.2022 | ||
| EE | 14.09.2022 | ||
| ES | 14.09.2022 | ||
| FI | 14.09.2022 | ||
| HR | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| PL | 14.09.2022 | ||
| RO | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SK | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| IS | 14.01.2023 | ||
| PT | 16.01.2023 | ||
| Former [2023/23] | AT | 14.09.2022 | |
| CZ | 14.09.2022 | ||
| EE | 14.09.2022 | ||
| ES | 14.09.2022 | ||
| FI | 14.09.2022 | ||
| HR | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| RO | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SK | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| PT | 16.01.2023 | ||
| Former [2023/22] | AT | 14.09.2022 | |
| CZ | 14.09.2022 | ||
| ES | 14.09.2022 | ||
| FI | 14.09.2022 | ||
| HR | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| RO | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| PT | 16.01.2023 | ||
| Former [2023/20] | FI | 14.09.2022 | |
| HR | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| SM | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| Former [2023/10] | FI | 14.09.2022 | |
| HR | 14.09.2022 | ||
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| GR | 15.12.2022 | ||
| Former [2023/09] | FI | 14.09.2022 | |
| LT | 14.09.2022 | ||
| LV | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| NO | 14.12.2022 | ||
| Former [2023/08] | FI | 14.09.2022 | |
| LT | 14.09.2022 | ||
| RS | 14.09.2022 | ||
| SE | 14.09.2022 | ||
| NO | 14.12.2022 | Cited in | International search | [X] EP2602547 (KAWASAKI HEAVY IND LTD et al.) [X] 1-17 * paragraphs [0056] - [0061] * | [X] US3762429 (FITZGERALD J et al.) [X] 1-17 * column 8, lines 56-63; claims 1, 2 * | [X] US2012046852 (ALGER II TERRENCE F et al.) [X] 1-17 * paragraphs [0017] - [0020] * | [X] US4704898 (THONE ERNST et al.) [X] 1-17 * claim 1 * | [Y] EP2333276 (KAWASAKI HEAVY IND LTD et al.) [Y] 1-17 * paragraphs [0014] - [0018] - [0 38] - [0039] - [0 44]; figure 1 * | [Y] WO2014051582 (MICRO MOTION INC et al.) [Y] 1-17 * page 2, line 14 - page 4, line 19 * | [A] US6872071 (DURST FRANZ et al.) [A] 1 * abstract * | [A] JPH09119891 (RIKEN KK et al.) [A] 1-17 * abstract * | [A] US2014116107 (WEINSTEIN JOEL et al.) [A] 1,8,15 * the whole document * |