EP3164932 - ROTARY MACHINE WITH ENCODER DIRECTLY CONNECTED TO ROTOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.03.2023 Database last updated on 15.11.2024 | |
Former | The patent has been granted Status updated on 25.03.2022 | ||
Former | Grant of patent is intended Status updated on 09.11.2021 | ||
Former | Examination is in progress Status updated on 26.04.2019 | ||
Former | Request for examination was made Status updated on 07.04.2017 | ||
Former | The international publication has been made Status updated on 03.02.2017 | Most recent event Tooltip | 15.11.2024 | Change - lapse in a contracting state Updated state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states Otis Elevator Company One Carrier Place Farmington CT 06032 / US | [2017/36] |
Former [2017/19] | For all designated states Otis Elevator Company 10 Farm Springs Road Farmington, CT 06032 / US | Inventor(s) | 01 /
LIN, Le No. 71, 9th Avenue TEDA Tianjin 300457 / CN | [2017/19] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2022/17] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | ||
Former [2017/19] | Ramsay, Laura Anne Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 15738232.6 | 02.07.2015 | [2017/19] | WO2015US39102 | Priority number, date | CN201410315937 | 04.07.2014 Original published format: CN201410315937 | [2017/19] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2016004382 | Date: | 07.01.2016 | Language: | EN | [2016/01] | Type: | A2 Application without search report | No.: | EP3164932 | Date: | 10.05.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.01.2016 takes the place of the publication of the European patent application. | [2017/19] | Type: | B1 Patent specification | No.: | EP3164932 | Date: | 27.04.2022 | Language: | EN | [2022/17] | Search report(s) | International search report - published on: | EP | 17.03.2016 | Classification | IPC: | H02K11/00, B66B11/04, H02K1/27, H02K5/173 | [2017/19] | CPC: |
B66B11/04 (EP,US);
B66B11/0438 (US);
B66B11/008 (US);
H02K1/2791 (EP,US);
H02K11/21 (EP,US);
H02K5/1737 (EP,US);
H02K7/1016 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | DREHENDE ELEKTRISCHE MASCHINE MIT GEBER DER DIREKT AM LÄUFER BEFESTIGT IST | [2021/48] | English: | ROTARY MACHINE WITH ENCODER DIRECTLY CONNECTED TO ROTOR | [2017/19] | French: | MACHINE ROTATIVE À CODEUR DIRECTEMENT RELIÉ À UN ROTOR | [2017/19] |
Former [2017/19] | DREHMASCHINE MIT DIREKT AM ROTOR ANGESCHLOSSENEM CODIERER | Entry into regional phase | 03.02.2017 | National basic fee paid | 03.02.2017 | Designation fee(s) paid | 03.02.2017 | Examination fee paid | Examination procedure | 03.02.2017 | Examination requested [2017/19] | 03.02.2017 | Date on which the examining division has become responsible | 24.08.2017 | Amendment by applicant (claims and/or description) | 02.05.2019 | Despatch of a communication from the examining division (Time limit: M06) | 12.11.2019 | Reply to a communication from the examining division | 28.10.2021 | Cancellation of oral proceeding that was planned for 17.11.2021 | 10.11.2021 | Communication of intention to grant the patent | 17.11.2021 | Date of oral proceedings (cancelled) | 18.03.2022 | Fee for grant paid | 18.03.2022 | Fee for publishing/printing paid | 18.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 30.01.2023 | No opposition filed within time limit [2023/14] | Fees paid | Renewal fee | 30.06.2017 | Renewal fee patent year 03 | 24.07.2018 | Renewal fee patent year 04 | 22.07.2019 | Renewal fee patent year 05 | 22.07.2020 | Renewal fee patent year 06 | 20.07.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.07.2015 | AL | 27.04.2022 | AT | 27.04.2022 | BG | 27.04.2022 | CY | 27.04.2022 | CZ | 27.04.2022 | DK | 27.04.2022 | EE | 27.04.2022 | FI | 27.04.2022 | HR | 27.04.2022 | IT | 27.04.2022 | LT | 27.04.2022 | LV | 27.04.2022 | MC | 27.04.2022 | MK | 27.04.2022 | MT | 27.04.2022 | NL | 27.04.2022 | PL | 27.04.2022 | RO | 27.04.2022 | RS | 27.04.2022 | SE | 27.04.2022 | SI | 27.04.2022 | SK | 27.04.2022 | SM | 27.04.2022 | IE | 02.07.2022 | LU | 02.07.2022 | GB | 27.07.2022 | NO | 27.07.2022 | GR | 28.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | FR | 31.07.2022 | LI | 31.07.2022 | IS | 27.08.2022 | PT | 29.08.2022 | [2024/51] |
Former [2024/41] | HU | 02.07.2015 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
MK | 27.04.2022 | ||
MT | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 02.07.2022 | ||
LU | 02.07.2022 | ||
BG | 27.07.2022 | ||
GB | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/22] | HU | 02.07.2015 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
MK | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 02.07.2022 | ||
LU | 02.07.2022 | ||
BG | 27.07.2022 | ||
GB | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/20] | HU | 02.07.2015 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 02.07.2022 | ||
LU | 02.07.2022 | ||
BG | 27.07.2022 | ||
GB | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/18] | HU | 02.07.2015 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 02.07.2022 | ||
LU | 02.07.2022 | ||
BG | 27.07.2022 | ||
GB | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2024/11] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 02.07.2022 | ||
LU | 02.07.2022 | ||
BG | 27.07.2022 | ||
GB | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/33] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
IE | 02.07.2022 | ||
LU | 02.07.2022 | ||
BG | 27.07.2022 | ||
GB | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/27] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
LU | 02.07.2022 | ||
BG | 27.07.2022 | ||
GB | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/25] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
LU | 02.07.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/22] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
LU | 02.07.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
CH | 31.07.2022 | ||
FR | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/21] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
LU | 02.07.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/17] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/11] | AT | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/09] | AT | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/07] | AT | 27.04.2022 | |
DK | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/51] | AT | 27.04.2022 | |
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/50] | AT | 27.04.2022 | |
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/49] | AT | 27.04.2022 | |
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/47] | AT | 27.04.2022 | |
FI | 27.04.2022 | ||
LT | 27.04.2022 | ||
NL | 27.04.2022 | ||
SE | 27.04.2022 | ||
NO | 27.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/44] | NL | 27.04.2022 | Cited in | International search | [XI]DE19807738 (BAUMUELLER NUERNBERG GMBH [DE]) [X] 1,3,5-7,10-17 * column 2, line 13 - line 41 * * column 2, line 51 - column 4, line 12 * * column 4, line 65 - line 68; figure 1 * [I] 2,4; | [XYI]EP1868282 (AMK ARNOLD MUELLER GMBH & CO K [DE]) [X] 1-3,5-8,13,15 * paragraph [0010] - paragraph [0013]; figures 1,2 * [Y] 9 [I] 14; | [Y]WO2011005264 (OTIS ELEVATOR CO [US], et al) [Y] 9* page 3, line 29 - page 4, line 12; figure 2 * |