EP3172825 - A VOLTAGE SOURCE CONVERTER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.01.2024 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 27.01.2023 | ||
Former | Grant of patent is intended Status updated on 18.09.2022 | ||
Former | Examination is in progress Status updated on 22.06.2021 | ||
Former | Grant of patent is intended Status updated on 08.03.2021 | ||
Former | Examination is in progress Status updated on 26.01.2018 | ||
Former | Request for examination was made Status updated on 28.04.2017 | ||
Former | The international publication has been made Status updated on 08.11.2016 | Most recent event Tooltip | 10.05.2024 | Lapse of the patent in a contracting state New state(s): CH | published on 12.06.2024 [2024/24] | Applicant(s) | For all designated states General Electric Technology GmbH Brown Boveri Strasse 7 5400 Baden / CH | [2017/22] | Inventor(s) | 01 /
JASIM, Omar Fadhel 125 Appledore Avenue Wollaton Nottingham NG8 2RW / GB | 02 /
CANELHAS, Andre Paulo 7 White Oaks Wildwood Stafford ST17 4SL / GB | [2017/22] | Representative(s) | Freigutpartners IP Law Firm Hahnrainweg 4 5400 Baden / CH | [2023/09] |
Former [2017/22] | Cleary, Fidelma GPO Europe GE International Inc. The Ark 201 Talgarth Road Hammersmith London W6 8BJ / GB | Application number, filing date | 15738384.5 | 20.07.2015 | [2017/22] | WO2015EP66574 | Priority number, date | EP20140275156 | 24.07.2014 Original published format: EP 14275156 | [2017/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016012411 | Date: | 28.01.2016 | Language: | EN | [2016/04] | Type: | A1 Application with search report | No.: | EP3172825 | Date: | 31.05.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.01.2016 takes the place of the publication of the European patent application. | [2017/22] | Type: | B1 Patent specification | No.: | EP3172825 | Date: | 01.03.2023 | Language: | EN | [2023/09] | Search report(s) | International search report - published on: | EP | 28.01.2016 | Classification | IPC: | H02M7/797, H02J3/26, H02J3/18 | [2017/22] | CPC: |
H02J3/26 (EP,CN,KR);
H02J3/1842 (EP,CN,KR);
H02M1/0025 (EP,CN,KR);
H02M7/797 (EP,CN,KR);
Y02E40/20 (EP);
Y02E40/30 (KR);
Y02E40/50 (EP,KR)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | SPANNUNGSQUELLENWANDLER | [2017/22] | English: | A VOLTAGE SOURCE CONVERTER | [2017/22] | French: | CONVERTISSEUR DE SOURCE DE TENSION | [2017/22] | Entry into regional phase | 24.02.2017 | National basic fee paid | 24.02.2017 | Designation fee(s) paid | 24.02.2017 | Examination fee paid | Examination procedure | 17.01.2017 | Amendment by applicant (claims and/or description) | 17.01.2017 | Date on which the examining division has become responsible | 24.02.2017 | Examination requested [2017/22] | 25.01.2018 | Despatch of a communication from the examining division (Time limit: M06) | 27.07.2018 | Reply to a communication from the examining division | 09.03.2021 | Communication of intention to grant the patent | 19.06.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 13.07.2021 | Despatch of a communication from the examining division (Time limit: M02) | 14.09.2021 | Reply to a communication from the examining division | 19.09.2022 | Communication of intention to grant the patent | 28.11.2022 | Receipt of the translation of the claim(s) | 20.01.2023 | Fee for grant paid | 20.01.2023 | Fee for publishing/printing paid | Opposition(s) | 04.12.2023 | No opposition filed within time limit [2024/06] | Fees paid | Renewal fee | 31.07.2017 | Renewal fee patent year 03 | 03.08.2018 | Renewal fee patent year 04 | 22.07.2019 | Renewal fee patent year 05 | 22.07.2020 | Renewal fee patent year 06 | 20.07.2021 | Renewal fee patent year 07 | 21.07.2022 | Renewal fee patent year 08 | Penalty fee | Additional fee for renewal fee | 31.07.2018 | 04   M06   Fee paid on   31.01.2019 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 01.03.2023 | CZ | 01.03.2023 | EE | 01.03.2023 | FI | 01.03.2023 | HR | 01.03.2023 | LT | 01.03.2023 | LV | 01.03.2023 | MC | 01.03.2023 | PL | 01.03.2023 | RO | 01.03.2023 | RS | 01.03.2023 | SI | 01.03.2023 | SK | 01.03.2023 | SM | 01.03.2023 | NO | 01.06.2023 | GR | 02.06.2023 | IS | 01.07.2023 | PT | 03.07.2023 | LU | 20.07.2023 | CH | 31.07.2023 | [2024/24] |
Former [2024/18] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
LU | 20.07.2023 | ||
Former [2024/14] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/11] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/50] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/49] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/48] | AT | 01.03.2023 | |
EE | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/46] | FI | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/38] | FI | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/37] | FI | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/36] | FI | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/35] | HR | 01.03.2023 | |
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/34] | LT | 01.03.2023 | |
RS | 01.03.2023 | ||
Former [2023/33] | LT | 01.03.2023 | Cited in | International search | [A]DE4216946 (AEG ELOTHERM GMBH [DE]) [A] 1-15* figure 1 *; | [IA]DE102011084910 (WOBBEN PROPERTIES GMBH [DE]) [I] 1,2,4,6-15 * column 0020 * [A] 3,5; | [I] - FAZELI SEYED MAHDI ET AL, "Individual-phase decoupledcontrol of three-phase voltage source converter", IET GENERATION, TRANSMISSION&DISTRIBUTION, IET, UK, (20131101), vol. 7, no. 11, doi:10.1049/IET-GTD.2012.0417, ISSN 1751-8687, pages 1219 - 1228, XP006044887 [I] 1 * paragraphs [0001] - [0003] * * figure 6 * DOI: http://dx.doi.org/10.1049/iet-gtd.2012.0417 | [I] - BARBOSA P G, "Control strategy for grid-connected DC-AC converters with load power factor correction", IEE PROCEEDINGS: GENERATION, TRANSMISSION AND DISTRIBUTION, INSTITUTION OF ELECTRICAL ENGINEERS, GB, (19980914), vol. 145, no. 5, doi:10.1049/IP-GTD:19982174, ISSN 1350-2360, pages 487 - 491, XP006011187 [I] 1 * figure 2 * * paragraph [0002] * DOI: http://dx.doi.org/10.1049/ip-gtd:19982174 | [A] - FEI WANG ET AL, "Pliant Active and Reactive Power Control for Grid-Interactive Converters Under Unbalanced Voltage Dips", IEEE TRANSACTIONS ON POWER ELECTRONICS, INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS, USA, (20110501), vol. 26, no. 5, doi:10.1109/TPEL.2010.2052289, ISSN 0885-8993, pages 1511 - 1521, XP011382807 [A] 1-15 * figure 1 * * abstract * DOI: http://dx.doi.org/10.1109/TPEL.2010.2052289 | [A] - DEPENBROCK M ET AL, "A theoretical investigation of original and modified instantaneous power theory applied to four-wire systems", IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, IEEE SERVICE CENTER, PISCATAWAY, NJ, US, (20030701), vol. 39, no. 4, doi:10.1109/TIA.2003.814553, ISSN 0093-9994, pages 1160 - 1167, XP011098911 [A] 1-15 * figure 1 * * paragraph [00II] * DOI: http://dx.doi.org/10.1109/TIA.2003.814553 | Examination | DE102011084910 | - FAZELI SEYED MAHDI ET AL, "Individual-phase decoupledcontrol of three-phase voltage source converter", IET GENERATION, TRANSMISSION&DISTRIBUTION, IET, UK, (20131101), vol. 7, no. 11, doi:10.1049/IET-GTD.2012.0417, ISSN 1751-8687, pages 1219 - 1228, XP006044887 DOI: http://dx.doi.org/10.1049/iet-gtd.2012.0417 |