blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3166776

EP3166776 - METHOD FOR MANUFACTURING A PART MADE OF A COMPOSITE MATERIAL COMPRISING AT LEAST ONE PORTION FORMING A FORCE-INSERTION PORTION OR LOCAL THICKENED PORTION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.07.2020
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  09.08.2019
FormerGrant of patent is intended
Status updated on  05.05.2019
FormerRequest for examination was made
Status updated on  18.04.2017
FormerThe international publication has been made
Status updated on  20.03.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
SAFRAN
2 Boulevard du Général Martial Valin
75015 Paris / FR
[2017/20]
Inventor(s)01 / MANDEL, Robin
2 rue de la Durance
F-75012 Paris / FR
02 / DUNLEAVY, Patrick
15 rue Jean-Jacques Rousseau
F-91120 Palaiseau / FR
03 / TROUSSET, Emilie
14 avenue Pierre Bossolette
F-92240 Malakoff / FR
 [2017/20]
Representative(s)Cabinet Beau de Loménie
158, rue de l'Université
75340 Paris Cedex 07 / FR
[N/P]
Former [2017/20]Desormiere, Pierre-Louis, et al
Cabinet Beau de Loménie
158, rue de l'Université
75340 Paris Cedex 07 / FR
Application number, filing date15748278.702.07.2015
[2017/20]
WO2015FR51837
Priority number, dateFR2014005652407.07.2014         Original published format: FR 1456524
[2017/20]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2016005686
Date:14.01.2016
Language:FR
[2016/02]
Type: A1 Application with search report 
No.:EP3166776
Date:17.05.2017
Language:FR
The application published by WIPO in one of the EPO official languages on 14.01.2016 takes the place of the publication of the European patent application.
[2017/20]
Type: B1 Patent specification 
No.:EP3166776
Date:11.09.2019
Language:FR
[2019/37]
Search report(s)International search report - published on:EP14.01.2016
ClassificationIPC:B29C70/84, B29L31/30, B29C70/44, B29C70/48, B29C31/08, B29C35/02, B29C65/00, B29C70/08
[2017/20]
CPC:
B29C70/84 (EP,CN,RU,US); B64D29/06 (US); B29C43/02 (US);
B29C43/52 (US); B29C65/02 (EP,CN,US); B29C65/562 (EP,CN,US);
B29C66/1122 (EP,CN,US); B29C66/474 (EP,CN,US); B29C66/524 (EP,CN,US);
B29C66/532 (EP,CN,US); B29C66/61 (EP,CN,US); B29C66/72141 (EP,CN,US);
B29C66/72143 (EP,CN,US); B29C66/73753 (EP,CN,US); B29C66/73941 (EP,CN,US);
B29C70/74 (RU); B29D99/0007 (EP); B64F5/10 (US);
B29C66/71 (EP,CN,US); B29C66/712 (EP,CN,US); B29C70/08 (EP,CN,US);
B29C70/44 (EP,CN,US); B29C70/48 (EP,CN,US); B29K2105/12 (US);
B29L2031/30 (EP,CN,US); B29L2031/3076 (EP,CN,US) (-)
C-Set:
B29C66/71, B29K2049/00 (US,EP);
B29C66/71, B29K2063/00 (EP,US);
B29C66/71, B29K2079/08 (US,EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/20]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINES TEILS AUS EINEM VERBUNDSTOFF MIT MINDESTENS EINEM TEIL ZUR BILDUNG EINES KRAFTEINSETZTEILS ODER LOKALEN VERDICKTEN TEILS[2017/20]
English:METHOD FOR MANUFACTURING A PART MADE OF A COMPOSITE MATERIAL COMPRISING AT LEAST ONE PORTION FORMING A FORCE-INSERTION PORTION OR LOCAL THICKENED PORTION[2017/20]
French:PROCEDE DE FABRICATION DE PIECE EN MATERIAU COMPOSITE COMPORTANT AU MOINS UNE PORTION FORMANT PORTION D'INTRODUCTION D'EFFORT OU SUREPAISSEUR LOCALE[2017/20]
Entry into regional phase07.09.2016National basic fee paid 
07.09.2016Designation fee(s) paid 
07.09.2016Examination fee paid 
Examination procedure07.09.2016Examination requested  [2017/20]
07.09.2016Date on which the examining division has become responsible
29.06.2017Amendment by applicant (claims and/or description)
06.05.2019Communication of intention to grant the patent
31.07.2019Fee for grant paid
31.07.2019Fee for publishing/printing paid
31.07.2019Receipt of the translation of the claim(s)
Opposition(s)15.06.2020No opposition filed within time limit [2020/34]
Fees paidRenewal fee
21.07.2017Renewal fee patent year 03
24.07.2018Renewal fee patent year 04
22.07.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU02.07.2015
AL11.09.2019
AT11.09.2019
CY11.09.2019
CZ11.09.2019
DK11.09.2019
EE11.09.2019
ES11.09.2019
FI11.09.2019
HR11.09.2019
LT11.09.2019
LV11.09.2019
MC11.09.2019
MK11.09.2019
MT11.09.2019
NL11.09.2019
PL11.09.2019
RO11.09.2019
RS11.09.2019
SI11.09.2019
SK11.09.2019
SM11.09.2019
TR11.09.2019
BG11.12.2019
NO11.12.2019
GR12.12.2019
IS12.01.2020
PT13.01.2020
[2022/32]
Former [2022/27]HU02.07.2015
AL11.09.2019
AT11.09.2019
CY11.09.2019
CZ11.09.2019
DK11.09.2019
EE11.09.2019
ES11.09.2019
FI11.09.2019
HR11.09.2019
LT11.09.2019
LV11.09.2019
MC11.09.2019
MT11.09.2019
NL11.09.2019
PL11.09.2019
RO11.09.2019
RS11.09.2019
SI11.09.2019
SK11.09.2019
SM11.09.2019
TR11.09.2019
BG11.12.2019
NO11.12.2019
GR12.12.2019
IS12.01.2020
PT13.01.2020
Former [2021/15]AL11.09.2019
AT11.09.2019
CZ11.09.2019
DK11.09.2019
EE11.09.2019
ES11.09.2019
FI11.09.2019
HR11.09.2019
LT11.09.2019
LV11.09.2019
MC11.09.2019
NL11.09.2019
PL11.09.2019
RO11.09.2019
RS11.09.2019
SI11.09.2019
SK11.09.2019
SM11.09.2019
BG11.12.2019
NO11.12.2019
GR12.12.2019
IS12.01.2020
PT13.01.2020
Former [2020/37]AL11.09.2019
AT11.09.2019
CZ11.09.2019
DK11.09.2019
EE11.09.2019
ES11.09.2019
FI11.09.2019
HR11.09.2019
LT11.09.2019
LV11.09.2019
NL11.09.2019
PL11.09.2019
RO11.09.2019
RS11.09.2019
SI11.09.2019
SK11.09.2019
SM11.09.2019
BG11.12.2019
NO11.12.2019
GR12.12.2019
IS12.01.2020
PT13.01.2020
Former [2020/36]AL11.09.2019
AT11.09.2019
CZ11.09.2019
DK11.09.2019
EE11.09.2019
ES11.09.2019
FI11.09.2019
HR11.09.2019
LT11.09.2019
LV11.09.2019
NL11.09.2019
PL11.09.2019
RO11.09.2019
RS11.09.2019
SK11.09.2019
SM11.09.2019
BG11.12.2019
NO11.12.2019
GR12.12.2019
IS12.01.2020
PT13.01.2020
Former [2020/27]AL11.09.2019
AT11.09.2019
CZ11.09.2019
EE11.09.2019
ES11.09.2019
FI11.09.2019
HR11.09.2019
LT11.09.2019
LV11.09.2019
NL11.09.2019
PL11.09.2019
RO11.09.2019
RS11.09.2019
SK11.09.2019
SM11.09.2019
BG11.12.2019
NO11.12.2019
GR12.12.2019
PT13.01.2020
IS24.02.2020
Former [2020/25]AL11.09.2019
AT11.09.2019
CZ11.09.2019
EE11.09.2019
ES11.09.2019
FI11.09.2019
HR11.09.2019
LT11.09.2019
LV11.09.2019
NL11.09.2019
PL11.09.2019
RO11.09.2019
RS11.09.2019
SK11.09.2019
BG11.12.2019
NO11.12.2019
GR12.12.2019
PT13.01.2020
IS24.02.2020
Former [2020/23]AL11.09.2019
AT11.09.2019
EE11.09.2019
ES11.09.2019
FI11.09.2019
HR11.09.2019
LT11.09.2019
LV11.09.2019
NL11.09.2019
PL11.09.2019
RO11.09.2019
RS11.09.2019
BG11.12.2019
NO11.12.2019
GR12.12.2019
PT13.01.2020
Former [2020/22]AL11.09.2019
EE11.09.2019
ES11.09.2019
FI11.09.2019
HR11.09.2019
LT11.09.2019
LV11.09.2019
NL11.09.2019
RS11.09.2019
BG11.12.2019
NO11.12.2019
GR12.12.2019
PT13.01.2020
Former [2020/20]AL11.09.2019
ES11.09.2019
FI11.09.2019
HR11.09.2019
LT11.09.2019
LV11.09.2019
NL11.09.2019
RS11.09.2019
BG11.12.2019
NO11.12.2019
GR12.12.2019
Former [2020/15]AL11.09.2019
ES11.09.2019
FI11.09.2019
HR11.09.2019
LT11.09.2019
LV11.09.2019
RS11.09.2019
BG11.12.2019
NO11.12.2019
GR12.12.2019
Former [2020/11]ES11.09.2019
FI11.09.2019
HR11.09.2019
LT11.09.2019
LV11.09.2019
RS11.09.2019
BG11.12.2019
NO11.12.2019
GR12.12.2019
Former [2020/10]FI11.09.2019
LT11.09.2019
BG11.12.2019
NO11.12.2019
Former [2020/09]FI11.09.2019
LT11.09.2019
NO11.12.2019
Former [2020/08]LT11.09.2019
NO11.12.2019
Cited inInternational search[Y]US4100241  (HAMPSHIRE WILLIAM J);
 [X]US5417385  (ARNOLD MICHAEL J [IE], et al);
 [XY]US6479124  (PORTE ALAIN [FR], et al);
 [Y]US2004051005  (BERGMANN BLAISE F [US]);
 [Y]US2005064134  (BRANTLEY JERRY W [US], et al);
 [Y]US2006208393  (KARMAKER AJIT [US], et al);
 [Y]US2008075942  (GERARD JACQUES [BE], et al);
 [Y]US2009252921  (BOTTLER OLIVER [DE], et al);
 [Y]EP2266784  (EUROCOPTER DEUTSCHLAND [DE]);
 [XYI]FR2981002  (AIRBUS OPERATIONS SAS [FR]);
 [Y]WO2013089598  (SAAB AB [SE], et al)
by applicantWO2006136755
 FR2986212
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.