EP3105864 - SPATIAL SEPARATION SUB-SYSTEM FOR SUPPORTING MULTIPLE-INPUT/MULTIPLE-OUTPUT OPERATIONS IN DISTRIBUTED ANTENNA SYSTEMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 21.06.2019 | ||
Former | Grant of patent is intended Status updated on 14.02.2019 | ||
Former | Request for examination was made Status updated on 18.11.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states CommScope Technologies LLC 1100 CommScope Place SE Hickory, NC 28602 / US | [2016/51] | Inventor(s) | 01 /
LANGE, Keld Knut Schillerstr. 11 75443 Oetisheim / DE | [2016/51] | Representative(s) | Abel & Imray LLP Westpoint Building James Street West Bath BA1 2DA / GB | [N/P] |
Former [2019/30] | Abel & Imray Westpoint Building James Street West Bath BA1 2DA / GB | ||
Former [2016/51] | Burt, Matthew Thomas, et al Abel & Imray 20 Red Lion Street London WC1R 4PQ / GB | Application number, filing date | 15749336.2 | 30.01.2015 | [2016/51] | WO2015US13886 | Priority number, date | US201461939438P | 13.02.2014 Original published format: US 201461939438 P | [2016/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015123040 | Date: | 20.08.2015 | Language: | EN | [2015/33] | Type: | A1 Application with search report | No.: | EP3105864 | Date: | 21.12.2016 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.08.2015 takes the place of the publication of the European patent application. | [2016/51] | Type: | B1 Patent specification | No.: | EP3105864 | Date: | 24.07.2019 | Language: | EN | [2019/30] | Search report(s) | International search report - published on: | KR | 20.08.2015 | (Supplementary) European search report - dispatched on: | EP | 01.09.2017 | Classification | IPC: | H04B7/15, H04B7/022, H04W88/08, H04B7/024, H04B7/0456, H04B7/0417, H04B7/06, H04B7/0452 | [2017/40] | CPC: |
H04B7/022 (EP,US);
H04B7/0456 (US);
H04B7/024 (US);
H04B7/0417 (EP,US);
H04B7/0452 (EP,US);
H04W88/085 (US);
H04B7/0639 (EP,US)
(-)
|
Former IPC [2016/51] | H04B7/15 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/51] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SUBSYSTEM FÜR RÄUMLICHE TRENNUNG ZUR UNTERSTÜTZUNG VON MIMO-OPERATIONEN IN VERTEILTEN ANTENNENSYSTEMEN | [2016/51] | English: | SPATIAL SEPARATION SUB-SYSTEM FOR SUPPORTING MULTIPLE-INPUT/MULTIPLE-OUTPUT OPERATIONS IN DISTRIBUTED ANTENNA SYSTEMS | [2016/51] | French: | SOUS-SYSTÈME À SÉPARATION SPATIALE DESTINÉ À LA PRISE EN CHARGE D'OPÉRATIONS ENTRÉE MULTIPLE SORTIE MULTIPLE DANS DES SYSTÈMES D'ANTENNES RÉPARTIES | [2016/51] | Entry into regional phase | 10.08.2016 | National basic fee paid | 10.08.2016 | Search fee paid | 10.08.2016 | Designation fee(s) paid | 10.08.2016 | Examination fee paid | Examination procedure | 10.08.2016 | Examination requested [2016/51] | 10.08.2016 | Date on which the examining division has become responsible | 28.03.2018 | Amendment by applicant (claims and/or description) | 15.02.2019 | Communication of intention to grant the patent | 11.06.2019 | Fee for grant paid | 11.06.2019 | Fee for publishing/printing paid | 11.06.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 27.01.2017 | Renewal fee patent year 03 | 29.01.2018 | Renewal fee patent year 04 | 28.01.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.01.2015 | AL | 24.07.2019 | AT | 24.07.2019 | CY | 24.07.2019 | CZ | 24.07.2019 | DK | 24.07.2019 | EE | 24.07.2019 | ES | 24.07.2019 | FI | 24.07.2019 | HR | 24.07.2019 | LT | 24.07.2019 | LV | 24.07.2019 | MC | 24.07.2019 | MK | 24.07.2019 | MT | 24.07.2019 | PL | 24.07.2019 | RO | 24.07.2019 | RS | 24.07.2019 | SE | 24.07.2019 | SI | 24.07.2019 | SK | 24.07.2019 | SM | 24.07.2019 | TR | 24.07.2019 | BG | 24.10.2019 | NO | 24.10.2019 | GR | 25.10.2019 | IS | 24.11.2019 | PT | 25.11.2019 | GB | 30.01.2020 | IE | 30.01.2020 | LU | 30.01.2020 | BE | 31.01.2020 | CH | 31.01.2020 | LI | 31.01.2020 | [2022/32] |
Former [2022/28] | HU | 30.01.2015 | |
AL | 24.07.2019 | ||
AT | 24.07.2019 | ||
CY | 24.07.2019 | ||
CZ | 24.07.2019 | ||
DK | 24.07.2019 | ||
EE | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
MC | 24.07.2019 | ||
MT | 24.07.2019 | ||
PL | 24.07.2019 | ||
RO | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
SI | 24.07.2019 | ||
SK | 24.07.2019 | ||
SM | 24.07.2019 | ||
TR | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
IS | 24.11.2019 | ||
PT | 25.11.2019 | ||
GB | 30.01.2020 | ||
IE | 30.01.2020 | ||
LU | 30.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2021/08] | AL | 24.07.2019 | |
AT | 24.07.2019 | ||
CZ | 24.07.2019 | ||
DK | 24.07.2019 | ||
EE | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
MC | 24.07.2019 | ||
PL | 24.07.2019 | ||
RO | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
SI | 24.07.2019 | ||
SK | 24.07.2019 | ||
SM | 24.07.2019 | ||
TR | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
IS | 24.11.2019 | ||
PT | 25.11.2019 | ||
GB | 30.01.2020 | ||
IE | 30.01.2020 | ||
LU | 30.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2020/51] | AL | 24.07.2019 | |
AT | 24.07.2019 | ||
CZ | 24.07.2019 | ||
DK | 24.07.2019 | ||
EE | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
MC | 24.07.2019 | ||
PL | 24.07.2019 | ||
RO | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
SI | 24.07.2019 | ||
SK | 24.07.2019 | ||
SM | 24.07.2019 | ||
TR | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
IS | 24.11.2019 | ||
PT | 25.11.2019 | ||
GB | 30.01.2020 | ||
LU | 30.01.2020 | ||
BE | 31.01.2020 | ||
CH | 31.01.2020 | ||
LI | 31.01.2020 | ||
Former [2020/48] | AL | 24.07.2019 | |
AT | 24.07.2019 | ||
CZ | 24.07.2019 | ||
DK | 24.07.2019 | ||
EE | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
MC | 24.07.2019 | ||
PL | 24.07.2019 | ||
RO | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
SI | 24.07.2019 | ||
SK | 24.07.2019 | ||
SM | 24.07.2019 | ||
TR | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
IS | 24.11.2019 | ||
PT | 25.11.2019 | ||
GB | 30.01.2020 | ||
LU | 30.01.2020 | ||
Former [2020/46] | AL | 24.07.2019 | |
AT | 24.07.2019 | ||
CZ | 24.07.2019 | ||
DK | 24.07.2019 | ||
EE | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
MC | 24.07.2019 | ||
PL | 24.07.2019 | ||
RO | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
SI | 24.07.2019 | ||
SK | 24.07.2019 | ||
SM | 24.07.2019 | ||
TR | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
IS | 24.11.2019 | ||
PT | 25.11.2019 | ||
LU | 30.01.2020 | ||
Former [2020/39] | AL | 24.07.2019 | |
AT | 24.07.2019 | ||
CZ | 24.07.2019 | ||
DK | 24.07.2019 | ||
EE | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
MC | 24.07.2019 | ||
PL | 24.07.2019 | ||
RO | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
SI | 24.07.2019 | ||
SK | 24.07.2019 | ||
SM | 24.07.2019 | ||
TR | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
IS | 24.11.2019 | ||
PT | 25.11.2019 | ||
Former [2020/37] | AL | 24.07.2019 | |
AT | 24.07.2019 | ||
CZ | 24.07.2019 | ||
DK | 24.07.2019 | ||
EE | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
PL | 24.07.2019 | ||
RO | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
SI | 24.07.2019 | ||
SK | 24.07.2019 | ||
SM | 24.07.2019 | ||
TR | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
IS | 24.11.2019 | ||
PT | 25.11.2019 | ||
Former [2020/36] | AL | 24.07.2019 | |
AT | 24.07.2019 | ||
CZ | 24.07.2019 | ||
DK | 24.07.2019 | ||
EE | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
PL | 24.07.2019 | ||
RO | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
SK | 24.07.2019 | ||
SM | 24.07.2019 | ||
TR | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
IS | 24.11.2019 | ||
PT | 25.11.2019 | ||
Former [2020/27] | AL | 24.07.2019 | |
AT | 24.07.2019 | ||
CZ | 24.07.2019 | ||
DK | 24.07.2019 | ||
EE | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
PL | 24.07.2019 | ||
RO | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
SK | 24.07.2019 | ||
SM | 24.07.2019 | ||
TR | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
PT | 25.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 24.07.2019 | |
AT | 24.07.2019 | ||
CZ | 24.07.2019 | ||
DK | 24.07.2019 | ||
EE | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
PL | 24.07.2019 | ||
RO | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
SK | 24.07.2019 | ||
TR | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
PT | 25.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 24.07.2019 | |
AT | 24.07.2019 | ||
DK | 24.07.2019 | ||
EE | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
PL | 24.07.2019 | ||
RO | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
TR | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
PT | 25.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 24.07.2019 | |
AT | 24.07.2019 | ||
DK | 24.07.2019 | ||
EE | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
PL | 24.07.2019 | ||
RO | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
TR | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
IS | 24.11.2019 | ||
PT | 25.11.2019 | ||
Former [2020/22] | AL | 24.07.2019 | |
AT | 24.07.2019 | ||
DK | 24.07.2019 | ||
EE | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
TR | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
IS | 24.11.2019 | ||
PT | 25.11.2019 | ||
Former [2020/17] | AL | 24.07.2019 | |
AT | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
TR | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
IS | 24.11.2019 | ||
PT | 25.11.2019 | ||
Former [2020/15] | AL | 24.07.2019 | |
AT | 24.07.2019 | ||
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
IS | 24.11.2019 | ||
PT | 25.11.2019 | ||
Former [2020/12] | AT | 24.07.2019 | |
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
IS | 24.11.2019 | ||
PT | 25.11.2019 | ||
Former [2020/11] | AT | 24.07.2019 | |
ES | 24.07.2019 | ||
FI | 24.07.2019 | ||
HR | 24.07.2019 | ||
LT | 24.07.2019 | ||
LV | 24.07.2019 | ||
RS | 24.07.2019 | ||
SE | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
GR | 25.10.2019 | ||
PT | 25.11.2019 | ||
Former [2020/10] | AT | 24.07.2019 | |
FI | 24.07.2019 | ||
LT | 24.07.2019 | ||
SE | 24.07.2019 | ||
BG | 24.10.2019 | ||
NO | 24.10.2019 | ||
PT | 25.11.2019 | ||
Former [2020/09] | FI | 24.07.2019 | |
LT | 24.07.2019 | ||
NO | 24.10.2019 | ||
Former [2020/08] | LT | 24.07.2019 | |
NO | 24.10.2019 | Documents cited: | Search | [XAI]US2011201368 (FACCIN PIER [IT], et al) [X] 1,3-7,11,13,14 * paragraphs [0031] , [0033] - [0038] - [0040] - paragraph [0042]; figure 1; table 1 * [A] 2 [I] 8-10,12,15; | [IA]WO2012075137 (ANDREW WIRELESS SYSTEMS GMBH [US], et al) [I] 1,3-7,9-15 * paragraphs [0002] , [0003] , [0005] , [0007] , [0023] - [0027] - [0032] , [0034] - paragraphs [0039] , [0058] , [0064] , [0067] , [0068] , [0071] , [0073] - [0076]; figures 2B,3,7B,8,9,11 * [A] 2; | [E]WO2016073885 (COMMSCOPE TECHNOLOGIES LLC [US]) [E] 1,3-7,11-15* paragraphs [0029] , [0030] , [0032] , [0046] - [0048]; figure 1 * | International search | [A]US2008150514 (CODREANU MARIAN [FI], et al) [A] 1-22* See paragraphs [0022]-[0036]; and figures 1-3. *; | [A]EP2315309 (QUINTEL TECHNOLOGY LTD [GB]) [A] 1-22 * See paragraphs [0052]-[0054], and figure 6. *; | [XYA]WO2012075137 (ANDREW WIRELESS SYSTEMS GMBH [US], et al) [X] 1, 2, 5, 11, 14, 17 * See paragraphs [0023]-[0039]; claim 11; and figures 2A-3. * [Y] 3, 4, 15, 16, 18 [A] 6-10, 12, 13, 19-22; | [Y]US2013076565 (LEE HONGYEOL [KR], et al) [Y] 3, 4, 15, 16, 18 * See paragraphs [0031]-[0054]; and figures 1, 2. *; | [A]US2013308693 (LI ZHAO [US], et al) [A] 1-22 * See paragraphs [0078]-[0113]; and figures 6, 7. * |