| EP3121628 - ELECTRONIC PAPER DISPLAY [Right-click to bookmark this link] | |||
| Former [2017/04] | ELECTRONIC PAPER DISPLAY SCREEN LIGHT GUIDE PLATE AND ELECTRONIC PAPER DISPLAY SCREEN | ||
| [2020/51] | Status | Patent revoked Status updated on 13.02.2026 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 30.04.2021 | ||
| Former | Grant of patent is intended Status updated on 18.01.2021 | ||
| Former | Examination is in progress Status updated on 21.12.2018 | ||
| Former | Request for examination was made Status updated on 23.12.2016 | ||
| Former | The international publication has been made Status updated on 19.12.2016 | Most recent event Tooltip | 13.02.2026 | Revocation of patent | published on 18.03.2026 [2026/12] | Applicant(s) | For all designated states Guangzhou OED Technologies, Inc. 19 Guangsheng Road Nansha District Guangzhou, Guangdong 511458 / CN | [2017/11] |
| Former [2017/04] | For all designated states Guangzhou OED Technologies Co., Ltd. No. 19 Guangsheng Road Nansha District Guangzhou, Guangdong 511458 / CN | Inventor(s) | 01 /
LIN, Yongqiang The Patent Department/LIN Xianrong No.19 Guangsheng Road Nansha District Guangzhou Guangdong 511458 / CN | 02 /
SUN, Jingquan The Patent Department/LIN Xianrong No.19 Guangsheng Road Nansha District Guangzhou Guangdong 511458 / CN | [2017/04] | Representative(s) | Canzler & Bergmeier Patentanwälte Partnerschaft mbB Despag-Straße 6 85055 Ingolstadt / DE | [N/P] |
| Former [2021/22] | Canzler & Bergmeier Patentanwälte Partnerschaft mbB Friedrich-Ebert-Straße 84 85055 Ingolstadt / DE | ||
| Former [2017/04] | Bergmeier, Werner Canzler & Bergmeier Patentanwälte Partnerschaft mbB Friedrich-Ebert-Straße 84 85055 Ingolstadt / DE | Application number, filing date | 15752879.5 | 11.02.2015 | [2017/04] | WO2015CN72720 | Priority number, date | CN20141056571 | 19.02.2014 Original published format: CN201410056571 | [2017/04] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015124074 | Date: | 27.08.2015 | Language: | ZH | [2015/34] | Type: | A1 Application with search report | No.: | EP3121628 | Date: | 25.01.2017 | Language: | EN | [2017/04] | Type: | B1 Patent specification | No.: | EP3121628 | Date: | 02.06.2021 | Language: | EN | [2021/22] | Search report(s) | International search report - published on: | CN | 27.08.2015 | (Supplementary) European search report - dispatched on: | EP | 16.10.2017 | Classification | IPC: | G02B6/00, F21V8/00, F21V33/00, G02F1/167, F21Y101/00 | [2017/04] | CPC: |
G02B6/0016 (EP,CN,US);
G02F1/133603 (EP,CN,US);
G02B6/0021 (EP,CN,US);
G02F1/167 (EP,CN,US);
G02F1/1677 (EP,US);
G02B6/0068 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/04] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ELEKTRONISCHER PAPIERANZEIGEBILDSCHIRM | [2020/51] | English: | ELECTRONIC PAPER DISPLAY | [2020/51] | French: | L'AFFICHAGE DE PAPIER ÉLECTRONIQUE | [2020/51] |
| Former [2017/04] | ELEKTRONISCHE PAPIERANZEIGEBILDSCHIRMLICHTLEITERPLATTE UND ELEKTRONISCHER PAPIERANZEIGEBILDSCHIRM | ||
| Former [2017/04] | ELECTRONIC PAPER DISPLAY SCREEN LIGHT GUIDE PLATE AND ELECTRONIC PAPER DISPLAY SCREEN | ||
| Former [2017/04] | PLAQUE DE GUIDAGE DE LUMIÈRE D'ÉCRAN D'AFFICHAGE DE PAPIER ÉLECTRONIQUE ET ÉCRAN D'AFFICHAGE DE PAPIER ÉLECTRONIQUE | Entry into regional phase | 14.09.2016 | Translation filed | 14.09.2016 | National basic fee paid | 14.09.2016 | Search fee paid | 14.09.2016 | Designation fee(s) paid | 14.09.2016 | Examination fee paid | Examination procedure | 14.09.2016 | Examination requested [2017/04] | 14.09.2016 | Date on which the examining division has become responsible | 27.06.2017 | Observations by third parties | 19.01.2018 | Observations by third parties | 25.06.2018 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 29.08.2018 | Amendment by applicant (claims and/or description) | 12.09.2018 | Observations by third parties | 19.12.2018 | Despatch of a communication from the examining division (Time limit: M04) | 29.04.2019 | Reply to a communication from the examining division | 03.06.2019 | Observations by third parties | 04.11.2020 | Date of oral proceedings | 24.11.2020 | Minutes of oral proceedings despatched | 19.01.2021 | Communication of intention to grant the patent | 23.04.2021 | Fee for grant paid | 23.04.2021 | Fee for publishing/printing paid | 23.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
02.03.2022
E ink Corporation 1000 Technology Park Drive Billerica, MA 01821-4165 / US Opponent's representative Mathys & Squire 32 London Bridge Street The Shard London SE1 9SG / GB | [N/P] |
| Former [2022/14] | |||
| Opponent(s) | 01
02.03.2022
E ink Corporation 1000 Technology Park Drive Billerica, MA 01821-4165 / US Opponent's representative Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | 17.03.2022 | Invitation to proprietor to file observations on the notice of opposition | 26.07.2022 | Reply of patent proprietor to notice(s) of opposition | 18.10.2023 | Date of oral proceedings | 24.11.2023 | Despatch of minutes of oral proceedings | 24.11.2023 | Despatch of communication that the patent will be revoked | 10.02.2026 | Legal effect of revocation of patent [2026/12] | Appeal following opposition | 23.01.2024 | Appeal received No. T0128/24 | 23.01.2024 | Payment of appeal fee | 21.03.2024 | Statement of grounds filed | 05.02.2026 | Result of appeal procedure: appeal of the proprietor was rejected | 10.02.2026 | Despatch of the decision of the Board of Appeal | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 29.08.2018 | Request for further processing filed | 29.08.2018 | Full payment received (date of receipt of payment) Request granted | 26.09.2018 | Decision despatched | The application is deemed to be withdrawn due to failure to indicate the wish to proceed further with the application | 29.08.2018 | Request for further processing filed | 29.08.2018 | Full payment received (date of receipt of payment) Request granted | 26.09.2018 | Decision despatched | Fees paid | Renewal fee | 24.02.2017 | Renewal fee patent year 03 | 10.08.2018 | Renewal fee patent year 04 | 25.01.2019 | Renewal fee patent year 05 | 28.01.2020 | Renewal fee patent year 06 | 23.02.2021 | Renewal fee patent year 07 | Penalty fee | Additional fee for renewal fee | 28.02.2018 | 04   M06   Fee paid on   10.08.2018 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.02.2015 | AL | 02.06.2021 | AT | 02.06.2021 | CY | 02.06.2021 | CZ | 02.06.2021 | DK | 02.06.2021 | EE | 02.06.2021 | ES | 02.06.2021 | FI | 02.06.2021 | HR | 02.06.2021 | IT | 02.06.2021 | LT | 02.06.2021 | LV | 02.06.2021 | MC | 02.06.2021 | MK | 02.06.2021 | MT | 02.06.2021 | PL | 02.06.2021 | RO | 02.06.2021 | RS | 02.06.2021 | SE | 02.06.2021 | SI | 02.06.2021 | SK | 02.06.2021 | SM | 02.06.2021 | TR | 02.06.2021 | BG | 02.09.2021 | NO | 02.09.2021 | GR | 03.09.2021 | IS | 02.10.2021 | PT | 04.10.2021 | IE | 11.02.2022 | LU | 11.02.2022 | BE | 28.02.2022 | CH | 28.02.2022 | LI | 28.02.2022 | [2026/04] |
| Former [2024/42] | HU | 11.02.2015 | |
| AL | 02.06.2021 | ||
| AT | 02.06.2021 | ||
| CY | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| MK | 02.06.2021 | ||
| MT | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| IE | 11.02.2022 | ||
| LU | 11.02.2022 | ||
| BE | 28.02.2022 | ||
| CH | 28.02.2022 | ||
| LI | 28.02.2022 | ||
| Former [2024/22] | HU | 11.02.2015 | |
| AL | 02.06.2021 | ||
| AT | 02.06.2021 | ||
| CY | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| MK | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| IE | 11.02.2022 | ||
| LU | 11.02.2022 | ||
| BE | 28.02.2022 | ||
| CH | 28.02.2022 | ||
| LI | 28.02.2022 | ||
| Former [2024/20] | HU | 11.02.2015 | |
| AL | 02.06.2021 | ||
| AT | 02.06.2021 | ||
| CY | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| IE | 11.02.2022 | ||
| LU | 11.02.2022 | ||
| BE | 28.02.2022 | ||
| CH | 28.02.2022 | ||
| LI | 28.02.2022 | ||
| Former [2024/18] | HU | 11.02.2015 | |
| AL | 02.06.2021 | ||
| AT | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| IE | 11.02.2022 | ||
| LU | 11.02.2022 | ||
| BE | 28.02.2022 | ||
| CH | 28.02.2022 | ||
| LI | 28.02.2022 | ||
| Former [2023/10] | AL | 02.06.2021 | |
| AT | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| IE | 11.02.2022 | ||
| LU | 11.02.2022 | ||
| BE | 28.02.2022 | ||
| CH | 28.02.2022 | ||
| LI | 28.02.2022 | ||
| Former [2023/09] | AL | 02.06.2021 | |
| AT | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| IE | 11.02.2022 | ||
| LU | 11.02.2022 | ||
| CH | 28.02.2022 | ||
| LI | 28.02.2022 | ||
| Former [2022/47] | AL | 02.06.2021 | |
| AT | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| LU | 11.02.2022 | ||
| Former [2022/44] | AL | 02.06.2021 | |
| AT | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| Former [2022/36] | AL | 02.06.2021 | |
| AT | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| Former [2022/29] | AL | 02.06.2021 | |
| AT | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| Former [2022/26] | AL | 02.06.2021 | |
| AT | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| Former [2022/21] | AT | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| Former [2022/10] | AT | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| Former [2022/09] | AT | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| PT | 04.10.2021 | ||
| Former [2022/08] | AT | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| Former [2022/07] | AT | 02.06.2021 | |
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| Former [2021/52] | FI | 02.06.2021 | |
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| Former [2021/51] | FI | 02.06.2021 | |
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| Former [2021/49] | FI | 02.06.2021 | |
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| Former [2021/47] | FI | 02.06.2021 | |
| LT | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| Former [2021/46] | FI | 02.06.2021 | |
| LT | 02.06.2021 | Documents cited: | Search | [XI] US2012250348 (KIM RAE-YOUNG et al.) | [XI] US2012294034 (KIM GUK HYUN et al.) | [I] EP1688665 (OMRON TATEISI ELECTRONICS CO et al.) | [A] US6601962 (EHARA MUNETSUGU et al.) | International search | [PX] CN203732748 (GUANGZHOU OED TECHNOLOGIES CO et al.) [PX] 1-10 * , claims 1-10 * | [PX] CN203732852 (GUANGZHOU OED TECHNOLOGIES CO et al.) [PX] 1-10 * . description, paragraphs [0038]-[0048], and figures 1-8 * | [PX] CN203849531 (GUANGZHOU OED TECHNOLOGIES CO et al.) [PX] 1-10 * , description, paragraphs [0034]-[0047], and figures 1-8 * | [PX] CN103631450 (WINTEK CORP et al.) [PX] 1-7, 9-10 * , description, paragraphs [0089]-[0097], and figures 1-8 * | [Y] CN102279498 [Y] 1-10 * , description, paragraphs [0002]-[0024], and figures 1-3 * | [Y] CN1886621 (OMRON TATEISI ELECTRONICS CO et al.) [Y] 1-10 * , description, page 8, last paragraph to page 17, paragraph 6, and figures 13-47 * | [Y] CN102279436 [Y] 1-10 * , description, paragraphs [0021]-[0035], and figure 7 * | [Y] CN102563466 (QINGDAO HISENSE ELECTRIC CO et al.) [Y] 1-7, 9-10 * , description, paragraphs [0030]-[0049], and figures 1-8 * | [A] CN103363440 (E INK HOLDINGS INC et al.) [A] 1-10 * , the whole document * | Examination | JPH10199316 | US2007274100 | ANONYMOUS: "Kindle Paperwhite (6th Generation)", AMAZON.COM, 1 January 2017 (2017-01-01), pages 1 - 6, XP055451333, Retrieved from the Internet | BERNADETTE JOHNSON: "How the Kindle Paperwhite Works \ HowStuffWorks", 31 March 2013 (2013-03-31), pages 1 - 16, XP055514196, Retrieved from the Internet | ANONYMOUS: "Frontlight - Wikipedia", 29 March 2017 (2017-03-29), XP055527462, Retrieved from the Internet | AMAZON: "Which Kindle E-Reader do i have?", 30 March 2013 (2013-03-30), XP055527286, Retrieved from the Internet | ANONYMOUS: "How the Kindle Paperwhite Works - Graphic - NYTimes.com", 26 December 2012 (2012-12-26), XP055660068, Retrieved from the Internet | ANONYMOUS: "Amazon Kindle Paperwhite review | Engadget", 30 September 2012 (2012-09-30), XP055660058, Retrieved from the Internet | other | US6601962 | US2012051093 | US2013063968 | US7513813 | US2013258705 | US2002101399 | US2012051093 | CN103363440 | JPH10199316 | "Kindle Paperwhite (6th Generation)", AMAZON.COM, 2017, pages 1 - 6, XP055451333 | ANONYMOUS: "Kindle Paperwhite (6th Generation)", AMAZON.COM,, 2017, pages 1 - 6, XP055451333 | BERNADETTE JOHNSON: "How the Kindle Paperwhite Works", 31 March 2013 (2013-03-31), pages 1 - 16, XP055514196, Retrieved from the Internet | Opposition | US2013258705 | US2014002428 | US2013063682 | CN203732748 | CN203732852 | CN203849531 | EP1688665 | WO03104884 | US2012002437 | US2010226118 | US6601962 | US7575358 | HOW THE KINDLE PAPERWHITE WORKS - GRAPHIC - NYTIMES.COM, 26 December 2012 (2012-12-26), XP055660068, Retrieved from the Internet | "Highly precise optical model for simulating light guide plate using LED light source", OPTICS EXPRESS, vol. 18, no. 21, 11 October 2010 (2010-10-11), XP055914032 [I] 3-8,10 DOI: http://dx.doi.org/10.1364/OE.18.022208 | MICHAEL KOZLOWSKI: "Hands on Review of the Kobo Glo eReader", GOODEREADER.COM, 1 October 2012 (2012-10-01), XP055914036, Retrieved from the Internet | DAVID CARNOY: "Kobo Glo review: A worthy Kindle alternative", CNET, 21 November 2012 (2012-11-21), XP055914040, Retrieved from the Internet | ANONYMOUS: "saturday star ", TORONTO STAR, 1 December 2012 (2012-12-01), XP055914183 [XP] 1-10 * the whole document * | ANONYMOUS: "Toronto star ", TORONTO STAR, 6 December 2012 (2012-12-06), XP055914185 [Y] 1-10 | BAYAN CHRISTOPHER, ANALYTICAL |: "Koboglo Light Guide Microscopy", EINK, 22 September 2022 (2022-09-22), pages 1 - 11, XP093110897, [retrieved on 20231211] | ANONYMOUS: "3M Optically Clear Adhesive 8261 8262 8263 8264 8265 ", 3M - TECHNICAL DATA, 1 January 2011 (2011-01-01), pages 1 - 5, XP093110900, Retrieved from the Internet | ANONYMOUS: "E-Ink or E-Paper Displays", CRAFTADATA LTD, 1 January 2011 (2011-01-01), XP093110905, Retrieved from the Internet | ANONYMOUS: "E-Paper Display Professional manufacturer", GOOD DISPLAY - TECHNICAL SUPPORT, 25 October 2012 (2012-10-25), XP093110910, Retrieved from the Internet | A SWORN STATEMENT FROM CHRISTOPHER BAYAN, A TECHNICAL EXPERT IN THE FIELD OF ELECTRO-OPTICS. | ANONYMOUS: "Products no longer manufactured or supported by Kobo ", RAKUTEN KOBO, 1 January 2023 (2023-01-01), pages 1 - 5, XP093134705, Retrieved from the Internet | KOZLOWSKI MICHAEL: "The Evolution of the Kobo eReader - In Pictures ", GOOD E-READER, 26 May 2014 (2014-05-26), pages 1 - 19, XP093134707, Retrieved from the Internet | ANONYMOUS K: "Get to know Kobo Glo. Kobo Glo Technical Specs", KOBO, 24 January 2013 (2013-01-24), pages 1 - 2, XP093134711, Retrieved from the Internet |